A request for quote for custom cabinetry only produces comparable prices when every buyer in the enquiry chain describes the same job. For grey modern kitchen cabinets with LED glass wine cabinet, the difference between a rough estimate and a firm project price usually comes down to six items: layout, dimensions, panel and finish specification, glazing and lighting detail, appliance provisions, and delivery terms. This guide lists what to put in the RFQ so that suppliers quote on the same basis.

1. Drawings and dimension schedule

Send what you already have, even if it is a sketch: plan elevation, a hand-marked layout with overall lengths, or an architectural joinery drawing. For a made-to-order kitchen the supplier needs to know where walls, windows, floor slabs and service runs sit before they can size carcasses.

  • Room dimensions with finished-floor level and ceiling height noted.
  • Runs in millimetres, including the position of corners, returns and any island.
  • Locations of soil, water, gas and electrical points, plus the intended hob, sink and dishwasher positions.
  • Tolerance notes if the substrate is uneven, tiled or still to be finished.

If drawings are not ready yet, say so in the RFQ and ask for a quotation against a budget range. Suppliers who work on villa and apartment fit-outs can price from a concept layout and revise it once site measurements are taken.

2. Panel construction, colour and surface finish

Grey is not one specification. State the tone, the sheen and the panel profile, because each combination uses a different board substrate and finishing route, and therefore a different price.

Item to specifyWhat to write in the RFQ
ToneLight grey, dark grey or a two-tone pairing of both; supply a RAL code, paint sample or reference photo if you have one.
SheenMatte, satin or high gloss. The same grey in grey matte cabinets and in a high-gloss lacquer is priced differently.
Door profileFlat panel, shaker or handleless. Flat-panel grey doors are the usual pairing with an integrated glass display run.
CarcassBoard type and thickness, edge treatment, and whether the carcass colour matches or contrasts with the doors.
HardwareHinges (soft-close or standard), drawer runners, handles or push-to-open, leg height and kick-trim material. Ask whether hardware is included or supplied separately.

Ask each supplier to confirm the surface they are quoting for a wet area next to the sink: scratch resistance and wipe-clean behaviour are what matter on a working kitchen door, and these differ by finish rather than by colour.

3. The glass wine cabinet: glazing, lighting and structure

The display element is where quotations drift furthest apart, because it is a joinery item with electrical content. In your RFQ describe the unit as precisely as you can:

  • Height and width of the glazed run, and whether it is full-height, wall-hung or a bench-level display case.
  • Glass type and tint — clear, frosted or bronze — and whether doors are framed in aluminium or frameless with hardware.
  • Shelf layout: glass shelves, timber shelves or bottle racks, and the number of display bays.
  • Lighting: warm or neutral LED, tape or profile fitting, switch or sensor, and whether the driver sits inside the carcass or in an accessible location for maintenance.
  • Voltage for the destination country, and whether the lighting is supplied wired and tested or as a loose set for the site electrician.

On this product family the glazed cabinet carries built-in warm LED lighting for bottles, goblets and tableware, with closed storage cabinets alongside so that everyday items stay out of sight. If you want the same balance of display and concealed storage, say which bays are glass and which are panel doors — a quotation that assumes three glazed bays cannot be compared with one that assumes six.

4. Appliance provisions and worktop interface

Tall housing for stacked ovens, an integrated refrigerator niche or a wine fridge all change the carcass count and the ventilation detail. In the RFQ list each appliance by model or by cut-out dimension, and state whether the supplier is providing the housing cabinet only or the appliance as well.

  • Appliance make and model, or the cut-out width, height and depth.
  • Ventilation route for ovens and refrigeration, and who is responsible for providing it.
  • Worktop material and thickness, splashback detail, and whether these are inside the cabinet quotation or a separate trade.
  • Whether a marble-pattern stone splashback is required behind the hob and sink runs.

5. Project context, quantities and standards of finish

One apartment kitchen and twelve identical kitchen sets are quoted on different terms. State the quantity, the unit mix and the end use — owner-occupied villa, rental apartment, serviced apartment or boutique hotel back-of-house — because specification for contract use puts more weight on hardware cycles and panel durability. For custom built-in kitchen cabinets supplied to hotel and apartment projects, buyers normally ask the supplier to confirm the carcass build, the matching hinge, runner, leg and bracket set, and the packing method for site handling.

Also state the phase of the job: new build, renovation of an occupied building, or a show-flat. Renovation work often needs protection, out-of-hours delivery or phased drop-offs, and those costs belong in the quotation, not in a variation.

6. Commercial terms to request in writing

Ask every supplier for the same commercial block so that the returns are readable side by side:

TermWhat to ask for
Price basisCurrency, Incoterms and named port or site address; confirm whether freight, duty and last-mile delivery are included.
Lead timeTime from drawing approval and deposit to despatch, stated in weeks, with the trigger point identified.
PaymentDeposit percentage, balance stage, and what is released at each milestone.
Approval drawingsWhether shop drawings are produced before production and how many revision rounds are included.
PackingPanel protection, carton or crate construction, and the packing list format for customs clearance.
After-salesHow replacement doors, shelves or LED drivers are ordered, and the spare-parts lead time.
InstallationWhether assembly is done by your trades with supplier instructions, or whether on-site installation support is offered.

7. Common gaps that make quotations incomparable

  • A colour named but not specified. "Grey cabinets" without sheen, profile or reference sample invites three different products at three prices.
  • Glazing described in words only. Without glass type, frame detail and lighting specification, the display cabinet is where hidden cost appears later.
  • Appliances left unstated. A tall housing quoted without the oven cut-out cannot be installed as drawn.
  • Quantities implied rather than listed. Unit counts and repetition drive price; put them in writing.
  • No delivery address or Incoterm. Freight to a port and freight to an apartment lobby are different jobs.

Putting it together

A usable RFQ for this product type fits on one page plus attachments: drawings and dimensions; panel, colour and sheen specification; glazing and LED detail; appliance cut-outs; quantities and end use; packing and delivery terms; and the commercial block above. Send the same package to each supplier and you can compare line by line instead of reconciling assumptions after award.

Before you send: check that every grey tone has a reference, every glass bay is drawn, every appliance has a cut-out dimension, and the delivery address with Incoterm is written down. Those four points decide whether the quotations you receive are comparable.