A wardrobe quotation rarely fails because of the door finish. It fails because the opening was measured once, in one condition, at the wrong stage of the build. Before we can produce Glass & Lacquer Combination Wardrobes for a bedroom, villa or hotel room, we need a defined set of inputs from your side: the finished dimensions of the space, the door and opening decision, the interior layout you expect to store, and the coordination points where our cabinetry meets flooring, ceilings, lighting and electrical work. This article lists those inputs in the order we use them, so a single enquiry round can produce drawings rather than another round of questions.

Start with finished dimensions, not structural ones

The most common source of rework is a measurement taken off the bare structure. Wardrobe carcasses are set out against the finished surface, so we need the room after plasterboard, render, tile, skirting and floor build-up are accounted for. Please send:

  • Width and height of the wall run, measured at three points along each dimension — left, centre, right for width; floor to ceiling at both ends and in the middle for height. A difference between those readings tells us the wall is out of square and whether we scribe, pack or set the carcass plumb.
  • The depth available at the shallowest point, not the deepest. A wardrobe line that clears a door reveal in one place can foul it in another.
  • Floor build-up and floor finish type, plus whether the finished level is already fixed or still to be set.
  • Ceiling construction and any bulkhead, coving, curtain box or recessed lighting that the wardrobe front has to meet.
  • Skirting and architrave details — whether they are removed for a flush fit or retained and worked around.

For a run that reaches the ceiling, tell us the height variation explicitly. A floor-to-ceiling elevation is only achievable if we know how much of the gap you want closed by scribing and how much by a top panel that matches the door.

Decide the opening type before the finish

Finish choice looks like the first decision, but it is the third. The first two are circulation and clearance. Sliding fronts need a track zone and an overlap allowance; hinged fronts need a swing arc that does not collide with the bed, the bathroom door or an opposite wall; a walk-in layout removes fronts from the equation entirely and changes what the interior has to do on its own. If you are weighing glazed fronts against solid ones in a sliding configuration, Glass Sliding Door Wardrobes shows how the same principle is applied across a full range.

Send us a simple plan sketch with door swings, bed position and the standing space in front of the run marked. That single drawing settles more questions than a specification sheet.

Specify the glass by what it has to do

In a combination design, glass is not decoration only — it governs how much of the interior stays visible. Tell us which of these you are after:

  • A clear view of the interior, where the hanging rail and shelving become part of the room's appearance and must therefore be tidy and lit.
  • A softened view, where frosted or textured glass hides the contents while still reflecting light across a narrow bedroom.
  • A tinted view, where smoked or bronze glass reads as a surface rather than a window and pairs with darker joinery.

Also confirm whether the glazed panel is framed or edge-finished, and how the frame meets the lacquered panel — this affects the reveal we build into the carcass. Where you want a defined metal edge rather than a lacquer-to-glass joint, an aluminium-framed option in the same family is worth comparing.

Specify the lacquer by surface and by light

The same colour reads differently on a high-sheen and a matte surface, and both change again under your lighting. Send us three things: the colour reference or RAL you are working to, the sheen level you expect, and a note on where the light falls — wall-washed, downlit, or lit from inside the wardrobe. A high-gloss front amplifies reflections and any unevenness in the wall behind it; a matte front absorbs light and shows fingerprints and dust along the horizontal edges more readily.

If the same lacquer has to carry across other joinery in the project — vanity fronts, media units, wall panelling — say so at enquiry stage. We then produce the panels for that room as one batch, from one lacquer run, rather than matching two separate orders.

Send the storage programme, not just the elevation

The interior is where a made-to-measure wardrobe earns its cost. Before we draw anything, tell us:

  • How much long hanging you need, and whether it sits in one tall bay or two half-height rails.
  • Drawer count and depth — shallow for folded clothing and accessories, deep for knitwear and bedding.
  • Shelving spans, and whether any shelf has to carry heavy items without a intermediate support.
  • Whether an ironing board, vacuum, luggage or safe has to be accommodated, and where.
  • Lighting: sensor-triggered, door-switched, or wired to the room circuit.

For a project where the brief is more about order than display, our Custom Minimalist Bedroom Wardrobe work follows the same input list — programme first, elevation second.

Coordination points we need confirmed in writing

Wardrobes sit at the intersection of several trades. Please confirm these before production:

  • Which party sets out and levels the opening — our team or your main contractor.
  • Whether electrical points for interior lighting are to be chased into the wall, run in a trunking behind the carcass, or surfaced after installation.
  • Floor protection and access route for delivery, including lift dimensions and any stair or corridor constraint on site.
  • The installation sequence relative to painting, flooring and handover, so a finished front is not damaged by another trade afterwards.

How the information reaches us

As a China-based furniture and building materials manufacturer working on villa, hospitality and office projects, we handle these wardrobes as made-to-measure work: sizing, material, finish and layout are all set to the project rather than picked from a fixed catalogue. A complete enquiry therefore carries a dimension sheet with three-point readings, a plan sketch marked with clearances, your storage programme, the glass and sheen decisions, and the coordination notes above. Send that package and we return drawings for your approval; approve the drawings and production starts.

Dimensions and selected specifications are confirmed per project before manufacture, so please treat every figure in a drawing as one to be checked against site conditions at the pre-production sign-off, not carried forward from an earlier stage of the build.