Bronze-tinted glass doors give a bedroom or dressing room a warm, reflective finish that reads as finished joinery rather than storage furniture. That is exactly why the installation plan matters more than most buyers expect. A tinted glass front shows every out-of-plumb wall, every uneven floor line and every misaligned hinge within centimetres of the panel edge. Below is the sequence we use on SANTERSON wardrobe projects, from the first site measurement to the handover sheet your site team signs off.

Start with the opening, not the door

Our Bronze Glass Wardrobes are made to measure: sizing, finish and internal layout are set per project. That flexibility only pays off when the dimensions we work from are taken on site, after the wet trades have finished. Take the measurement from the completed floor finish, at three points across the width and three points up the height, and record the smallest reading as your controlling dimension. Then note:

  • Floor level across the full run — a sliding door will track every dip if the bottom rail is not shimmed to a true line.
  • Wall plumb and whether either return wall is out of vertical, which decides whether the carcass needs a scribe panel.
  • Skirting, architrave and door reveals that must be cut back or worked around.
  • Ceiling height at the run, including any bulkhead, sprinkler head, duct or light fitting that reduces the clear height.

Fix the internal layout before you order the front

The glass door is the last decision, not the first. Draw the interior first: hanging lengths for short and long garments, shelf heights for folded stacks, drawer banks, and any lit niche where accessories sit. Then set the door split so no handle lands against a vertical divider and every compartment stays reachable. Two habits save rework on tinted-glass jobs:

  • Keep the door joint line off the centre of the room's main sightline; an offset split usually looks more deliberate.
  • Confirm the clearance each operating system needs — sliding doors need track depth and overlap, hinged doors need swing space in front of the opening.

Decide how much the glass reveals

Bronze glass is tinted, not opaque. It softens what sits behind it but does not hide it, so the interior finish becomes part of the appearance. Specify the carcass and shelf material, edge treatment and interior colour at the same time as the door, and decide which bays stay open-display and which are closed storage. If you want the tinted look with a metal-framed front instead, our Bronze Glass Aluminum Frame Wardrobes in the Glass & Aluminum Frame collection follow the same site-measured process with a framed edge detail.

Confirm the glass build and hardware as one specification

Glass, frame, hinges, tracks, handles and any integrated lighting are one assembly. Lock them down together in the order so nothing arrives as an orphan. The line items to record for each unit:

Item What to confirm before production
Glass type and tint Bronze tint, surface treatment (clear, ribbed, frosted sections), and the construction specified for the opening and door size.
Frame and finish Frame profile, colour and whether it matches ironmongery elsewhere in the project.
Operating system Sliding or hinged, soft-close where required, track and hinge positions marked on the drawing.
Interior fit-out Shelf heights, drawer banks, hanging lengths, and material/finish of visible interior surfaces.
Lighting Cabinet lights, niche lighting or mirror lighting, plus the position of the driver and the access point for maintenance.
Fixings and packing Wall fixings suited to the actual substrate (masonry, stud, plasterboard), plus glass crating and separate hardware cartons.

Where a project needs non-standard sizes, finishes or branding, our Custom & OEM Service covers bespoke finishes and material choices alongside made-to-measure production. Confirm the options, minimum order quantities and schedule for your specific job at quotation stage.

Plan the delivery sequence around the trades

Glass wardrobes arrive late in a programme for a reason: they are fragile and they need a clean, dry, finished room. Before the container lands, confirm with your site team:

  • Painting, flooring and ceiling work complete in the room, and the space signed off as dry.
  • A clear route from the lift or entry to the room, with the goods stored upright, on dunnage, and not stacked.
  • Electrical first-fix and driver access complete if the unit carries lighting.
  • Delivery date matched to the installers' availability rather than the ship date — our Logistics & Door-to-Door Delivery service handles freight, customs paperwork and container loading, but the on-site window is set by your programme.

Set the installation steps and the snag list in advance

Write the install method into the plan so the site team and the fitters are working from the same sheet. The order we follow:

  1. Check each carton against the packing list and inspect glass for transit damage before the trades leave.
  2. Level and fix the base or bottom track to a true line, then check the run for wind and twist.
  3. Plumb the carcasses or vertical frames, scribing to out-of-plumb walls where recorded at survey.
  4. Fit shelves, drawers and hanging rails, then hang or slot the glass doors.
  5. Adjust hinges, tracks and soft-close until the reveal between doors is even along the full height.
  6. Connect and test lighting, then protect the fronts until handover.

Close out with a snag list per unit — door alignment, glass condition, drawer runners, lighting function — and photograph the completed run. Our Installation & After-sales Support page covers on-site installation, inspection and snags, warranty coverage and spare parts; ask us to confirm in writing which of these apply to your project, where the wardrobes are installed, and what the warranty terms and exclusions are.

What to send with your enquiry

The faster route to a priced, buildable wardrobe package is one enquiry that already contains the answers. Send:

  • Room drawings or marked-up photographs with the site-measured widths and heights
  • The internal layout you want per unit, including which bays are open display
  • Your chosen glass, frame and interior finish references
  • Unit quantities and the room-by-room schedule
  • Delivery location, access notes and your target on-site date
A bronze glass wardrobe plan is complete when four things are fixed: verified site dimensions taken off the finished floor, an interior layout that drives the door split, one combined specification for glass, frame, hardware and lighting, and a delivery-and-install sequence agreed with your site team. Anything left open at order stage becomes a variation on site.

SANTERSON is a China-based furniture and building materials manufacturer supplying custom-made wardrobes, cabinetry and interior fixtures for villa, hospitality and office projects, with design coordination, made-to-measure production, logistics and installation support. Contact us with your drawings and schedule to discuss a wardrobe package for your project.