A request for quote for custom niche paneling often arrives with a photograph and one line of text: “shower niche, similar to this.” The supplier then has to guess the wall build-up, the tile thickness that the niche face must sit proud of, whether the substrate is in a wet or dry area, and how the edge detail should be finished. Every unanswered question becomes an email round-trip, and the price you receive on Monday may not be the price you approve on Friday. Below is the information list we use to quote made-to-measure niches and wall panels in one pass, so that the figures you compare across suppliers are like for like.

Start with the room, not the product

Niche paneling in our catalogue sits mainly in the Custom Partitions & Paneling collection and is specified most often for residential bathrooms, which is why we ask about the environment before we ask about the finish. Tell us the room type — shower enclosure, bathtub surround, powder room, laundry, hallway storage wall — and whether the niche will face direct spray, occasional splash or dry use. That single answer drives substrate choice, edge detailing and how the panel meets the waterproofing membrane.

For an integrated look, buyers frequently combine the niche with wall panel systems on the surrounding wall. If that is your intention, say so at RFQ stage; a niche quoted alone and a niche quoted as part of a panel run are different jobs, because the reveal lines, trims and setting-out dimensions have to agree.

Dimensions: give us finished sizes and a datum

Send dimensioned drawings rather than a sketch with one measurement on it. For each niche we need:

  • Opening width, height and depth as finished face dimensions, plus the rough opening if it differs.
  • Tile or stone thickness on the wall, since the niche frame has to sit proud by that amount to avoid a lipped edge that traps water.
  • Stud or batten centres and framing material, so we can confirm what the unit fixings bear on.
  • Whether the unit is set into a new wall build-up or retrofitted into an existing one — retrofit changes both the fixing method and the sequencing on site.
  • Levels: distance from finished floor level to each shelf and to the base, measured from the reference line used on your drawings.

Made-to-measure sizing is standard on these products, so state your tolerance expectation instead of assuming one. If the niche must align with a tile joint grid, a shower set-out or an adjacent cabinet run, mark that alignment datum on the drawing. Where we can see the datum, we build to it; where we cannot, we default to centring the unit.

Materials and finishes: name what you want, then ask what is available

Our Custom & OEM service covers bespoke material, finish and texture choices across woods, metals, engineered stone and laminates. For a niche or panel quote, specify the substrate you expect, the surface you will see, and the edge treatment. A useful line in an RFQ reads: “moisture-resistant substrate, matte lacquer face in colour reference ___, square edge with matching trim.”

Where a niche forms part of a larger storage wall, buyers often specify it alongside open display niches, and the two must share one finish schedule. List every element that has to match — niche interior faces, shelf fronts, adjacent panels, doors and trims — and give the same finish code to each. Finish names borrowed from another brand are not reliable; send a colour reference, a sample number, or a photograph of a physical sample you already hold.

Quantities, repetition and site conditions

Give quantities per type, not one lump total. “Six identical niches in guest bathrooms, two unique sizes in the master” lets us price the repeat units as a production run and the one-offs separately. For multi-unit projects — villa groups, apartment floors, hotel room types — note which rooms are duplicates of a single room type, because repetition is where cost control actually comes from.

Also state access and installation conditions: floor level, lift or stair dimensions, whether units may be delivered assembled or must be flat-packed through a narrow opening, and who is installing on site. These details do not change the design of the niche, but they change packaging, crate count and freight cost.

The commercial block: what the price has to cover

A quote with an unclear boundary is a quote you cannot compare. Ask each supplier to state in writing:

  • What is included — unit only, unit plus fixings and trims, sealants, packaging.
  • What is excluded — waterproofing, wall preparation, on-site cutting, final joint sealing.
  • The Incoterms basis and the delivery address, with destination charges shown separately.
  • Packaging specification and total volume and weight per crate, so you can price freight independently.
  • Payment terms, production lead time measured from drawing approval rather than from enquiry, and how long the price stays valid.

Freight is a real part of landed cost on built-in joinery. Our logistics service covers sea, air and rail freight forwarding with customs paperwork, packing lists, certificates of origin and door-to-door delivery; whichever supplier you use, require the same documents in the quotation so your comparison includes them instead of discovering them later.

Approvals, shop drawings and change control

State who signs off the shop drawings and how long that approval normally takes on your side. Production lead time starts at drawing approval, so a slow approval loop delays a site handover no matter how fast the factory is. Then set the change rule: after approval, any dimension or finish change is re-quoted in writing before it enters production. For projects where we also provide interior design services — layout planning, furniture layouts and 3D renderings, then drawing and production coordination — the shop drawing stage is exactly where mismatched dimensions get caught.

A short RFQ checklist to paste into your enquiry

  • Project name, delivery address, room types, and wet or dry classification for each location.
  • Dimensioned drawings with finished face sizes, datum lines and levels.
  • Substrate, face finish with code, edge detail and trim requirement.
  • Quantity by type, plus which units are duplicates of a room type.
  • Fixing method and framing background, or a note asking the supplier to recommend one.
  • Access constraints for delivery and installation, and who installs.
  • Required inclusions and exclusions, Incoterms basis, packaging, volume and weight.
  • Approval owner, expected approval time, and the written change-control rule.

Send that list with your drawings and you will receive quotations you can place side by side. If you are sourcing niche paneling together with other built-in joinery, turnkey interior project solutions let one supplier carry the paneling, cabinetry and matching finishes under a single drawing set and delivery schedule — which is usually where the coordination savings sit.

To receive an itemised quotation for custom niche paneling in a bathroom or a wider fit-out, send your drawings and the checklist above to our project team from the Contact Us page.