Media units in a hotel guest room or a villa living room have to do two jobs at once: keep the space looking calm and showable, while hiding chargers, spare linens, minibar stock and paperwork that guests should never see. That is exactly the brief an open & closed combo unit answers. Santerson Open & Closed Combo Units sits in our Built-in Furniture range under the TV Cabinets / Media Units collection, and every unit is built to the dimensions, layout and finish of the room it belongs to.
This guide walks through how we specify these units for hospitality and villa packages — what to decide first, which details to lock down before production, and how the same order travels through design, manufacturing, delivery and installation.
Start with the room type, not the cabinet
The mix of open to closed storage should follow who uses the room and how often it is cleaned or restocked. Two patterns cover most of the projects we work on:
- Hotel and serviced-apartment rooms. Closed doors carry most of the load. Housekeeping needs somewhere to put extra towels, guest supplies and the television cables out of sight, while one open shelf or niche holds the remote, a welcome tray or a printed service directory. A closed carcass also protects the finish from trolley knocks along a narrow wall.
- Villa living rooms, lounges and master suites. Open shelving and display niches do more work here — books, ceramics, art objects — with lower cabinets hiding media equipment and household stock. Owners want the room to read as a home, not a storage wall.
Where both audiences share one building — a hotel with long-stay suites, or a resort villa with rental turnover — we usually split the specification by room type and keep the carcass construction, hardware and finish family identical across them, so the project still reads as one design.
What is configurable on an Open & Closed Combo Unit
Each unit in this collection is specified rather than selected from a fixed size list. The decisions below are the ones that shape price, lead time and how the finished wall performs:
- Dimensions. Width, height and depth follow the wall and the ceiling line, including skirting, cornices, air-conditioning returns and any switch or socket positions already set out by the M&E drawings.
- Open-to-closed ratio. Which bays are shelves, which are doors, and whether doors are hinged or sliding depends on clearance in front of the unit and on how the room is used day to day.
- Interior layout. Shelf heights, drawer stacks, cable routes behind the television position, and provision for a soundbar or set-top box are all drawn before cutting.
- Finish. Door fronts, carcass edges and open shelves can be matched to other joinery in the same project — wardrobes, sideboards, kitchen cabinetry — so one material and colour palette runs through the building.
- Hardware and lighting. Hinges, slides, handles and any integrated shelf or niche lighting are confirmed per project, together with where transformers and wiring access will sit.
Because the listing itself does not fix a single size, board material or hardware brand, treat those as items to confirm on your own drawing pack. send us the room elevation and we will return a specification you can check line by line.
Related units in the same collections
Combo units rarely stand alone in a project package. Two neighbouring options are worth comparing at the same time, because they solve adjacent problems with matching finishes:
- Santerson Storage & Display Combo — a Media & TV Walls configuration for larger feature walls where display and storage share one composition.
- Santerson Freestanding TV Cabinets — made-to-measure freestanding pieces, useful in villas and long-stay suites where the wall should not be built into, or where furniture may be rearranged later.
In a hospitality package we tend to specify the combo unit for guest rooms and suites, and keep freestanding pieces for show apartments and sales-gallery units where flexibility matters more than a fixed wall.
How these units fit a project order
Built-in joinery only works when it arrives in step with the rest of the fit-out. As a furniture and building materials supplier, we handle media units alongside the other fixed and loose items in the same package, so one production and shipment plan covers them:
- Design and specification. Room elevations, finish schedule and internal layout agreed with your designer or contractor before any panel is cut.
- Custom and OEM production. Sizes, materials and finishes built to the approved pack, with branding or hardware substitutions handled on request.
- Logistics. Packed, loaded and shipped with the rest of the joinery package, with documentation prepared for import clearance.
- Installation and after-sales. On-site fitting guidance, snag inspection at handover, and spare parts support afterwards.
For villa owners and hotel operators coordinating several trades, our Turnkey Interior Project Solutions cover this sequence end to end, which is why joinery, wardrobes, flooring, lighting and outdoor furniture often travel on the same project schedule.
A short checklist before you confirm
- Room-by-room open/closed ratio agreed with housekeeping or the owner, not assumed.
- Cable, socket and television positions marked on the elevation, with access left for servicing.
- Finish codes matched to the joinery schedule for wardrobes, kitchen cabinetry and doors.
- Door type and swing or sliding clearance checked against beds, trolleys and traffic routes.
- Dimensions taken from as-built site surveys where existing walls are involved.
- Hardware, integrated lighting and any electrical components listed and confirmed in writing.
If you are specifying media units for a hotel, serviced apartment or villa package, send us the drawings and finish schedule and we will quote the configuration room by room. Send the drawings to us through the enquiry form at santerson.com and we will reply with a room-by-room quotation.