A mirror cabinet looks like a small line item on a bathroom schedule, until it arrives on site with the wrong depth, an unapproved light fitting, or a finish that does not match the joinery package. The Santerson LED Mirror Cabinet is a made-to-order piece, so almost everything about it is decided by documentation rather than by a catalogue code. This article sets out what procurement teams should record before the order is released.
1. Product identity and where it sits in the schedule
Start by naming the exact product page for each bathroom type, not just "mirror cabinet". SANTERSON publishes several variants under Sanitary Fixtures / Bathrooms / Mirror Cabinets, and they behave differently on site:
- Santerson LED Mirror Cabinet — the illuminated option, where electrical details matter most.
- Santerson Tall Mirror Cabinet — full-height storage, which changes clearance and fixing requirements.
- Santerson Round Mirror Cabinet — a shaped format where setting-out against the basin is critical.
- Standard Mirror Cabinet — the non-illuminated baseline for secondary bathrooms.
Record the room name, floor, unit or guest-room type, and the drawing reference next to each product link. On a multi-unit job this table is what stops identical cabinets being sent to rooms with different vanity widths.
2. Dimensions, and which dimensions actually matter
The product pages state made-to-measure sizing with layout tailored to the project, so there is no single standard size to assume. When you specify, ask for and document four separate numbers rather than one:
| Dimension | Why it needs to be on the drawing |
| Overall width and height | Must clear wall finishes, tiles, skirting, door swings and any adjacent tall cabinet or shower screen. |
| Carcase depth | Determines whether the unit clears the basin tapware and whether the mirror sits at a usable distance from the user. |
| Mirror face and door reveal | Affects sightlines, cleaning access, and how the piece reads against the wall panel or tile pattern. |
| Centre-line position relative to basin | Should be dimensioned from a fixed wall finish line, not from a stud that may move during fit-out. |
State the finished floor and finished wall levels. A mirror cabinet specified against structural levels will land in the wrong place once tiling and waterproofing are complete.
3. Materials, finish and hardware
Material and finish options are part of the configuration, so the purchase order should name the specific board, surface and colour reference you approved — not a family name such as "matte grey". In bathroom environments, record:
- The exact finish code or physical sample reference, signed off by the designer or client.
- Edge treatment and whether the carcase is exposed on one side, both sides, or recessed into a niche.
- Hinge type and opening direction for each unit, cross-checked against the door and shower screen on the layout drawing.
- Interior configuration — shelf heights, drawer units, and whether any shelving is to match Santerson Shelving Accessories.
- Mirror edge detail: polished, bevelled, or framed, and whether the mirror is full-height on the door face.
Where the cabinet must coordinate with other joinery in the same project — for example custom built-in cabinetry or a double vanity — note that on the order so the same batch of material and finish is used across the package.
4. Lighting and electrical: the part most often left open
For the LED option, lighting is a scope boundary between three parties — joinery supplier, electrician, and interior designer — and unclear boundaries cause the delays. Document:
- Where the light sources sit: top strip, side columns, perimeter backlight, or a combination.
- Colour temperature and colour rendering to be confirmed against the bathroom lighting design, not taken as an assumed default.
- Switching method — touch sensor, wall plate, door-interlock, or connection to the room's lighting circuit.
- Driver location and whether it must remain accessible after installation for maintenance.
- Supply voltage, cable outlet position on site, and who supplies and installs the driver.
SANTERSON's own product note asks that lighting and electrical specifications be confirmed for each project. Treat that as a required sign-off step in your programme, not an optional query. If the bathroom also uses vanity lighting or a decorative sconce such as a mirror wall lamp, decide explicitly which fixture provides task lighting and which provides ambience, so the two are not fighting each other at commissioning.
5. Interface with basin, tapware and wall finishes
The cabinet is one element in a wet-area assembly. Confirm the pairing before production: mirror cabinet centre-line against the chosen integrated basin or vessel basin, tap spout reach versus cabinet depth, and the tile or panel joint pattern behind the unit. On villa and hospitality fit-outs it is worth coordinating this with the wider wall finish schedule — wall panel systems and stone panels change the finished wall line by more than most teams budget for.
Also record substrate and fixing method. Tiled, plasterboard, and framed walls take different fixings, and a made-to-measure cabinet ordered for a wall that has not yet been built is a risk worth closing out early with a site survey note.
6. Quantities, packaging and delivery sequence
Mirror cabinets are fragile and bulky, so the delivery plan belongs in the documentation. Agree:
- Quantity per room type, with a named spares strategy for high-turnover guest-room floors.
- Packing standard and labelling — each unit marked with room or unit number matching the schedule above.
- Delivery mode and Incoterms for the shipment, plus who handles customs clearance on arrival.
- Storage location on site, since bathroom cabinets should not sit in an area where trades are wetting or grinding.
SANTERSON describes global freight by sea, air and rail with customs paperwork and door-to-door delivery. For Australian projects, confirm import terms, duties, insurance and the exact delivery point for each shipment in writing; marketing copy about coverage is not a service commitment.
7. Installation, inspection and after-sales record
Close the loop with an installation brief that states who installs, what gets inspected on handover, and how defects are raised. Document snags against the same room-by-room schedule used at ordering, photograph each unit on delivery before unpacking, and keep the signed shop drawing as the reference for any warranty or replacement request.
Warranty terms, response times and installer arrangements vary by project and region. Get the specific terms for your contract in writing rather than relying on figures shown on a website page.
A documentation checklist to attach to the purchase order
- Product page link and variant for every room type
- Signed shop drawing with overall, depth and setting-out dimensions from finished levels
- Named finish code, edge treatment, hardware schedule and interior layout
- Lighting specification: position, colour temperature, switching, driver location, supply responsibility
- Basin, tapware and wall-finish interface notes
- Quantity, spares, packing and labelling standard
- Delivery terms, delivery point and storage plan
- Installer, inspection criteria and defect process
Because the LED mirror cabinet is built to project-specific dimensions and finishes, the quality of this paperwork directly sets the outcome on site. Teams that treat it as a custom joinery item — with drawings, sign-offs and interface notes — get consistent bathrooms across every unit. Teams that treat it as a catalogue purchase tend to find out about the gaps on installation day.
SANTERSON is a China-based manufacturer and one-stop supplier of furniture and building materials for villa, hospitality and office projects, with custom and OEM capability alongside production, logistics and installation support. Project teams specifying bathroom fixtures as part of a wider fit-out package can request drawings and configuration details directly through the SANTERSON contact page.