A set of Minimalist Open Wardrobes looks simple on a drawing: hanging rails, open shelving, a few deep drawers, no doors to align. That simplicity disappears the moment the order leaves the factory gate. Built-in wardrobes are made to the room they belong to, so an international delivery is not a box-moving exercise — it is the last stage of a project that started with your dimensions and finish schedule. Below is how buyers and project managers plan that stage, from the drawing sign-off to the moment the panels are unpacked on site.

Where the delivery plan actually begins

Long before a container is booked, the order itself has to be delivery-ready. Minimalist Open Wardrobes are made-to-measure: sizing, layout, material and finish are specified per project, and each of those decisions changes how the goods travel and what has to arrive together.

  • Confirmed opening and ceiling heights. Open wardrobes run floor to ceiling in many villa and apartment schemes. A single mis-measured height is corrected by re-manufacturing a panel, not by trimming on site.
  • A written finish schedule. Veneer tone, lacquer or laminate surface, edge detail and hardware are listed item by item, so nothing is substituted to fit a shipment.
  • An assembly decision for each module. Cabinet boxes can travel assembled or flat. Which option applies depends on the module size, the route and how much site labour you have available.
  • A named receiving party. Someone has to sign for goods, check them against the packing list and report damage while the carrier is still accountable.

SANTERSON works as a furniture and building materials manufacturer supplying built-in furniture together with the finishes around it — wall panelling, doors, flooring, lighting and sanitary ware for the same rooms. For wardrobe orders this matters commercially: one supplier, one production window and one consolidated shipment is usually easier to schedule than five separate consignments arriving in different weeks.

Reading your route before you choose an Incoterm

The logistics and door-to-door delivery service covers freight forwarding by sea, air and rail, customs documentation, packaging and container loading, shipment tracking and delivery to the project address. Which of these you use is decided by three practical questions.

1. Is the order time-critical?

Wardrobe carcasses rarely justify air freight on their own, but a handful of replacement shelves, drawer units or hanging rails can. The usual pattern on longer projects is sea freight for the main cabinetry order and a faster service for late additions discovered during fit-out.

2. Who clears customs?

Commercial invoices, packing lists, certificates of origin and any import permits are prepared with the shipment. Decide in writing who acts as importer of record and who pays duty and local taxes. Buyers who take this on themselves need a local broker briefed before goods sail, not after.

3. What does the last mile look like?

Ask early about the delivery address: floor level, lift dimensions, stair width, whether a tail-lift or push-trolley is allowed, and whether the site is occupied. Tall wardrobe panels that fit through a warehouse door do not always fit through an apartment lobby on the twentieth floor.

Ask for the Incoterm in writing, with the delivery address attached. “Door-to-door” to a loading bay is not the same commitment as “door-to-door” to a specific room, and the difference shows up as labour cost on site.

Packing open wardrobes so they survive the voyage

Open wardrobe modules carry more exposed surface per square metre than a closed cabinet. Every shelf edge, hanging rail and finish face is a place where a shift in transit leaves a mark that cannot be sanded out on site.

  • Protect the visible faces, not just the corners. Veneer and high-gloss lacquer surfaces need interleaved protection between panels; edge protectors alone are not enough.
  • Group by room, not by part type. Pallets labelled “Bedroom 2 left run” let installers work room by room instead of sorting a mixed container on the day.
  • Mark every carton against the shop drawing number. Reorder and replacement requests then reference the drawing, not a photograph.
  • Plan for humidity. Ocean containers move through several temperature bands. Sealed panels should be packed so they are not sitting against container walls where condensation forms.
  • Photograph the loaded container before the doors close. It is the cleanest evidence if a claim follows.

If your project also orders Metal Frame Open Wardrobes or Open Walk in Wardrobes for other rooms, say so at the packing stage. Metal-frame modules and full-height walk-in runs pack differently from standard carcasses, and mixing them carelessly into one pallet is how panels arrive scratched.

Documents that decide whether goods clear or sit

DocumentWhy it matters for a wardrobe order
Commercial invoiceValues must match the purchase contract and be consistent with the packing list; a mismatch delays clearance.
Packing listShould reference module names and drawing numbers, so the receiving team can check each piece against the design.
Bill of lading or airway billConsignee details must be exact; amendments after departure cost time you have already spent on site preparation.
Certificate of originRequested by some importing countries and affects duty treatment.
Shop drawings and finish scheduleNot customs paperwork, but the reference for inspection on arrival and for any later replacement order.

Receiving, inspecting and installing

Inspection is where most avoidable cost is either prevented or created. Work through the delivery with the drawings in hand:

  1. Check carton count against the packing list before signing. Note any shortage or damaged carton on the delivery note itself.
  2. Open a representative sample of cartons — one from each pallet position, not just the top layer — and check finish faces and edges.
  3. Verify dimensions against the shop drawings on at least one full-height module before fixing anything to the wall.
  4. Lay out hardware and drawer units against the schedule, so nothing is missing when installers reach that stage.
  5. Record findings with photographs and a written snag list on the day of arrival.

SANTERSON lists installation and after-sales support covering on-site installation, inspection and snags, warranty coverage, spare parts and replacement, and ongoing maintenance. Where local labour is doing the fitting, sending the shop drawings and an assembly sequence with the goods keeps the site team working from the same reference as the factory.

Building the schedule backwards from your completion date

Work in this order rather than forwards from the purchase order:

  • Site handover and snag deadline — the fixed point everything else is measured against.
  • Installation window — open wardrobes need walls, flooring and ceiling finishes complete first.
  • Delivery date — set with a small buffer before installation begins, plus storage space if the site is not ready.
  • Production window — confirmed after drawings are signed; measure and re-measure before that sign-off, because changes afterwards restart the clock.
  • Enquiry and specification stage — where finish options and quantities are locked so the quotation is comparable between suppliers.

The custom and OEM service covers bespoke finishes, prototyping and flexible order quantities, which helps when one bedroom in a villa scheme needs a different run from the rest. It also means your drawing set is the controlling document for both production and delivery — treat it with the same care as the contract.

A short checklist before you place the order

  • Final dimensions signed off, including skirting, cornice and any uneven walls.
  • Finish schedule written out per module, with hardware specified.
  • Incoterm, delivery address and importer of record agreed in writing.
  • Packing method agreed: assembled or flat, palletised by room.
  • Named receiving contact and inspection window booked at destination.
  • Spares strategy decided for high-use drawer fronts and shelf pins.

Open wardrobes reward planning. Get the measurement and finish decisions right, pack the modules by room, and put one name against every delivery date, and an international order of Minimalist Open Wardrobes arrives as a set of ready-to-fit components rather than a problem to solve on site. For project enquiries, drawings review and a delivery route quoted for your address, contact the SANTERSON team through the contact page.