A glass partition quote is only as good as the information behind it. Two projects that look identical on a drawing can carry very different costs once frame profile, glass type, opening mechanism and site access are fixed. The sequence below is how we specify glass partitions for residential and project work, and what we need from you to return a quotation that does not move after the drawings are approved.
Start with the function, not the glass
Before any measurement is taken, state what the partition has to do. A screen that separates a bedroom from an ensuite behaves differently from one that closes off a study or divides a living area. Our Glass Partitions sit in the Custom Partitions & Paneling collection and are made to measure, so the intended use drives the layout, the frame section and whether a fixed panel, a hinged leaf or a sliding arrangement makes sense. Tell us the room, the wall it sits on, and what needs to be visible or hidden from each side.
Send the dimensions that actually matter
A single length and height is rarely enough. For each opening, provide:
- Floor-to-ceiling height at more than one point along the run — slabs and ceilings are seldom level.
- The full length of the run, plus any return, niche or obstruction such as a downlight, bulkhead or skirting.
- Clear floor space for a sliding leaf, including where the panel will stack when open.
- Finished floor level and finished wall surfaces, since partition frames are set out against finishes rather than structure.
Where a door is part of the same opening, our glass sliding doors are specified on the same made-to-measure basis, so track position and overlap need to be resolved at the same time rather than after the partition is drawn.
Choose glass and frame before the drawing is issued
Finish and glazing selection changes both appearance and price, so it belongs in the enquiry rather than in a later revision. The options we work with on this collection include:
- Clear, frosted, smoked or bronze-tinted glass — the same profile carries all of them.
- Framed and frameless-look details; aluminium-framed glass is used across our built-in ranges, including aluminium frame glass wardrobes, so matching a partition to existing joinery is a straightforward finish comparison.
- Frame colour and surface treatment, matched to ironmongery and door hardware on site.
Send a finish reference or a photograph of the joinery the partition must sit against. Where you want the whole wall resolved — panelling, niches, an integrated door — we quote those as one package under the same collection.
Say how it opens, and what carries it
Fixed panels are the simplest line on a quotation. Sliding systems add track, hardware, floor guidance and clearance, and the ceiling or header above must be able to carry the run. If you already have a preferred system, send a section detail; if not, tell us the opening width and how often it will be used, and we will propose the configuration. For full-height sliding runs, our partition sliding systems are configured per project, with track, hardware and opening dimensions confirmed against the site conditions.
Cover delivery, access and installation in the same request
Glass partitions are large, heavy and fragile, so logistics belong in the quotation. For enquiries outside China, include the delivery address, floor level, lift or stair dimensions, and whether panels can be brought in whole or need to be split for access. We arrange freight by sea, air or rail with door-to-door delivery, and installation is handled on site with inspection of the finished work. If your programme has a fixed handover date, state it — production sequence and shipment are planned around it.
How our quotation comes back
Send the brief and dimensions and you will receive a specification sheet listing panel sizes, glass type, frame finish, hardware and configuration, with the price against it. Once you confirm the specification, drawings are issued for sign-off before production starts. For projects where partitions are one part of a wider fit-out — joinery, wardrobes, bathroom fixtures, flooring and wall finishes together — one-stop furniture and building materials supply lets the whole package be quoted, produced and shipped under one programme instead of several separate orders.
Questions that decide the price
Can you quote from a floor plan alone?
We can give an indicative range from a plan, but the firm price needs heights at several points along the run and confirmation of the finished surfaces the partition meets.
What if my ceiling is sloped or has a bulkhead?
Send a photograph with a tape measure in frame and note the slope. Made-to-measure frames are cut to the site condition, and a scribe or fixed head detail is drawn for approval.
Can the partition match my existing wardrobe fronts?
Yes, when you give us the frame finish and glass reference of the existing joinery. Aluminium-framed glass appears across our built-in ranges, so matching is a matter of comparing finishes rather than changing systems.
Do you supply partitions only, or the whole wall?
Both. The same collection covers panelling, niche paneling and integrated doors, which are usually quoted together with the glazing so that reveals and junctions resolve cleanly.