A classic paneled solid wood wardrobe is one of the longer-lived pieces of joinery in a bedroom scheme. The panel mouldings, the door construction and the carcass dimensions all stay visible for years, and unlike loose furniture it cannot be swapped out when something looks wrong. That is exactly why buyers who order these wardrobes straight from a catalogue page tend to run into trouble later: the drawing was never confirmed, the finish was never sampled, and the internal layout was decided by whoever drew the shop detail rather than by the people using the wardrobe.
Before you place an order, work through the questions below with your supplier. Each one is a decision that changes price, lead time or the finished result, and each one is far cheaper to settle on paper than on site.
1. What exactly is the door made of, and how is it built?
"Solid wood" gets used loosely in quotations. Ask what the stile, rail and centre panel are each made from, how the panel sits in the frame, and whether the construction allows for seasonal movement in a heated or air-conditioned room. A paneled door is assembled from separate parts precisely so that the wood can move; a poorly detailed version is what later shows up as a gap at a joint or a panel that rattles.
Also confirm which species you are buying and whether the same model is offered in more than one. In our Classic Paneled Solid Wood Wardrobes, for example, sizing, material and finish are specified per project rather than fixed to one option, so the species question is genuinely open at quotation stage. Ask for the species to be named in writing on the order, not just described as "oak tone" or "walnut effect".
2. Which panel profile will you actually receive?
"Classic paneled" covers several different door designs, and they read very differently once installed next to your skirting and doors. A raised panel throws a shadow line and suits a more formal room; a recessed panel sits flatter and reads quieter; an arched or moulded panel changes the whole character of a wall.
Send the supplier a photograph of the room and ask them to confirm which profile matches what you have in mind. Our Classic Paneled range is split into separate profiles for exactly this reason, including Raised Panel Wardrobes and shaker panel wardrobe designs. Ask for a sample of the door you are ordering, not a generic moulding off the shelf — the profile depth and the width of the stile are what make the difference on site.
3. What finish, and how many coats?
Ask for the finish system in plain terms: stain or paint, open or closed pore, sheen level, and whether the interior faces are finished to the same standard as the exterior. A wardrobe with a raw carcass interior and a painted exterior is not automatically wrong, but you should know which one you have paid for.
Then ask how colour is confirmed. A named colour code is not enough on wood, because grain absorbs pigment differently across a panel. Insist on a physical sample of the actual species in the requested finish, signed off before production starts. If you are matching existing joinery, send a swatch or a photograph taken in daylight and ask the workshop to match against that.
4. Who measured the opening, and against which drawing?
Made-to-measure only pays off if the measurements are trustworthy. Establish who is supplying them, whether they are site-verified or taken from architectural drawings, and at what point in the building programme they were taken. Floors are rarely level and ceilings rarely square; a wardrobe ordered to nominal dimensions will need scribing on site, and that work has to be agreed and priced before it happens.
Ask for a dimensioned elevation showing the wardrobe against the finished floor and ceiling levels, plus a note of where skirting, architrave, light switches and door swings fall. Our built-in furniture range is specified per project on this basis — dimensions, layout and finish are set for the individual space rather than picked from a fixed size list.
5. Is the internal layout designed around how the room is used?
The carcass is the expensive part; the internals decide whether the wardrobe works. Before you sign off, walk through a normal day: what hangs long, what hangs short, what folds, what lives in drawers, what comes out once a year and needs a shelf above the door line. Count the items rather than guessing.
Then check the practical details on the drawing — hanging heights, drawer widths against the door opening, whether anything behind the doors fouls the handle, where lighting sits, and how deep the shelves are relative to the doors. Ask for the internal layout as a separate drawing with dimensions, and read it yourself rather than accepting a generic interior.
6. What hardware, and who supplies it?
Hinges, slides, handles and any soft-close gear are frequently quoted as provisional items and then upgraded later at your cost. Ask which brand and model of hinge and runner are included, whether the doors will sag over time at their stated width, and whether handles are supplied or sourced locally. Confirm what arrives pre-fitted and what is fitted on site.
7. How does it get from the workshop to your room?
A wardrobe that cannot be carried through the doorway or up the stair has to be assembled in the room, which changes both the packing and the on-site time. Ask whether sections are knocked-down or pre-assembled, how they are packed for ocean or road freight, and who is responsible for each stage of delivery to the room of installation. If you are buying alongside other joinery and finishes from one source, ask whether everything ships together on one consignment or arrives separately — split deliveries create storage and damage risk that nobody wants to pay for twice.
8. What happens when something is wrong?
Before ordering, ask in writing what the warranty covers, how a fault is reported, who pays for replacement parts and their freight, and whether missing or damaged components can be remade quickly rather than requiring a whole new unit. This matters most on made-to-measure work, where a single wrong panel cannot simply be replaced from stock.
9. What is included in the price?
Compare quotations line by line rather than on the total. Confirm whether scribing, plinths, cornices, end panels, interior lighting, installation and packing are inside the figure or extras. Ask what triggers a variation — a change of finish, a revised opening, a moved socket outlet — so that you know what costs money to change after production has begun.
10. What do you need to send before production starts?
A reliable supplier will not start cutting until they hold a confirmed drawing, an approved finish sample and a signed purchase order. Ask what they require from you and in what order, so the approval stage does not eat into your programme. If your project also needs other joinery — vanities, sideboards, media walls or cabinetry for the rest of the floor — decide early whether one supplier is drawing all of it, because matching finishes across different pieces is much easier when one workshop controls the specification.
A short list to keep beside you on every wardrobe enquiry: door construction and species; panel profile with a physical sample; finish system and signed-off sample; site-verified dimensions against finished levels; dimensioned internal layout; named hardware; packing and delivery responsibility; warranty terms; the exact scope of the price; and the approval sequence before production.
SANTERSON manufactures classic paneled solid wood wardrobes and other built-in joinery to project-specific dimensions, layouts and finishes, as part of a wider range of furniture and building materials supplied for villa, hotel and office projects. Send us your drawings, photographs of the space and the finish you are working to, and we will quote against that rather than against a standard size.