A proposal for a full-height media wall can look complete on paper and still leave the people who build and maintain it guessing. Panels appear in a render, finishes are named, and a price is attached — yet the dimensions that meet an uneven floor, the wiring behind the screen, and the hardware carrying a heavy door are usually settled later, on site. The checklist below sets out what a manufacturer’s proposal for our Santerson Full Height Media Walls should state before you accept it, and which points belong in the order rather than in a variation claim.

What “full height” commits you to

Full-height media walls run floor to ceiling and combine the screen position with surrounding storage, display niches and panelling. Because the wall is measured for one opening, it cannot be re-cut on site without visible consequences at the ceiling line. Our listing for this collection states that finish, layout and dimensions are specified to suit each space, and asks buyers to confirm dimensions and storage configuration for each project before ordering. Treat any proposal quoting a “standard” width or height for this collection as incomplete.

For comparison, the same brief handled as a wall-mounted media wall sits clear of floor and ceiling, so it is less sensitive to floor levels but more dependent on what the substrate can carry. Choosing between the two is a site question first and a design question second.

Six items a complete proposal should name

1. Measured dimensions against finished surfaces. Ask for the height taken to the finished ceiling and the width at skirting level, not the drawing dimension. Note which face of the wall is being measured, and whether the floor screed or topping is included in the stated level.

2. Storage configuration drawn, not listed. A line item reading “open shelving plus closed cabinets” does not tell you shelf spans, drawer positions or where tall units sit. Request an elevation with openings marked, so you can see what is behind each door before production starts.

3. Screen fixing and service zone. The proposal should state how the display is supported, where the recess or panel sits, and how connections stay reachable once the wall is closed. If it is silent on this, the wall will be built around somebody’s assumption.

4. Materials, finishes and hardware by name. Substrate, surface finish, edge treatment and ironmongery should each appear in writing. Where a sample has been approved, it should be referenced by code so the delivered panels and the approval can be matched.

5. Interface conditions. Record what the wall meets on each side — plasterboard, masonry, adjacent joinery, flooring — and who prepares those substrates. Interfaces are where site delays start, because neither trade assumes responsibility for them.

6. What is confirmed with you before production. A sound proposal lists the items needing your sign-off, such as final dimensions and configuration. If nothing is listed, expect changes to be priced later.

Related wall systems worth pricing together

Media walls rarely appear alone in a villa or hospitality package. Where lighting is carried into the joinery, Santerson Backlit Feature Walls and Santerson Integrated TV Panels belong to the same Media & TV Walls collection, while storage-only elevations are covered by full-height storage walls in our integrated storage wall range. Grouping these on one enquiry keeps finishes consistent across rooms and puts matching panels on a single production schedule.

If the screen needs to be hidden when not in use, Santerson Sliding Panel TV Systems is the variant to specify. Sliding systems add a mechanism and a track detail that must appear on the drawing — confirm panel materials and mechanism requirements instead of accepting the panels as a design option.

How our procurement route changes what you receive

SANTERSON has manufactured furniture and building materials in China since 2008, supplying both from one factory for villa, hospitality and office projects. As a one-stop project furnishing supplier, the same team handles the media wall alongside cabinetry, doors, wall panelling and loose furniture, which cuts the number of drawings that have to be reconciled between separate suppliers.

Our custom and OEM service covers bespoke finishes and dimensions, so a proposal can be written around your approved sample rather than a catalogue option. For buyers coordinating from overseas, freight by sea, air or rail with door-to-door delivery is arranged under logistics and door-to-door delivery, with installation and after-sales support listed separately on our services pages.

Australian work is a regular part of this — villa fit-outs in Sydney, Melbourne, Perth, Willoughby and North Turramurra appear among our project cases. Import terms, duties and site access conditions still need agreeing with your own agent for each project, since they vary by state and by building.

Questions to put to the manufacturer before signing

  • Which dimensions are fixed at order, and what happens if the on-site measurement moves by a few millimetres?
  • Are panel joints, shadow gaps and ceiling transitions shown on the drawing or left to the fitter?
  • What is provided for cable routing behind the screen, and who supplies the power and data points?
  • How are doors and drawers supported under repeated use, and which hardware is specified?
  • Which finish samples are approved, and how will you confirm the delivered panels match them?
  • What lead time runs from signed approval to despatch, and what sits outside it?

When a proposal answers these six points in writing, the wall arrives as an assembled system rather than a set of parts with the difficult decisions deferred to site. When it does not, ask for the missing detail before the order — that is where the real cost of a media wall is decided.

Send us the elevation, the room dimensions and the finishes you are working to, and we will price the full-height media wall against them. Contact SANTERSON with your drawings and delivery location for a proposal written around your project.