A wardrobe quotation goes wrong long before the first panel is cut. It goes wrong on the enquiry, when a buyer writes "oak wardrobe, 3 metres" and leaves everything else open. Two suppliers then price two different products, and the difference surfaces at handover — as a change order, a delayed site programme, or a door that fouls the skirting.
Our Oak Solid Wood Wardrobes are made to measure for residential wardrobe projects, with finish, layout and dimensions specified per space. That flexibility is exactly why the specification has to be explicit: what you write down is what gets manufactured. The checklist below is the one we use internally when a bedroom joinery package comes through our custom and OEM service, and it works just as well when you are comparing two quotations side by side.
Start with the room, not the door style
Solid timber wardrobes are built to fit an opening, so the opening has to be described before anything else is. Record finished floor level and finished wall face — the surfaces the wardrobe will actually meet after screed, plaster and tiling, not the structural shell. Note out-of-plumb and out-of-square conditions, and state which way you want them handled: scribed filler to the wall, a shadow gap, or a boxed carcass that hides the deviation.
Then fix the three controlling dimensions — width, height and depth — and say what each one includes. Depth is where buyers lose usable space: carcass depth and internal hanging depth are not the same number once doors, hinges and any sliding track are accounted for. If the design runs to the ceiling, state whether the top is closed with a pelmet, a filler panel, or left as a dust shelf.
Name the material in layers
"Oak" on its own can mean several different build-ups at very different prices. In a written specification, split the product into the parts that carry cost and performance, and describe each one separately:
- Door and drawer fronts — solid timber or an engineered substrate with an oak face, and which edge treatment applies (mitred, square, rounded, or a routed profile).
- Carcass and boxes — the board used for cases, shelves and drawer sides, and how exposed edges are finished.
- Back panels — thickness and fixing method, which matters more on tall runs than buyers expect.
- Finish system — clear, stained or painted, sheen level, and how the finish is applied and cured. State the reference you are matching to, not a colour name.
- Visible hardware — hinges, slides, handles or a handleless route, plus brand or grade where one is required.
Wood moves. A specification that names the construction of each component, rather than trusting one word, is what lets you compare an oak solid wood wardrobe against a veneered alternative honestly — and lets the supplier flag where the two behave differently over a heating season.
Specify the interior as a layout, not an adjective
"Lots of storage" is not a specification. Draw the internal elevation for every bay and label it: hanging zones with rail heights (double hang, short hang for shirts, long hang for dresses), shelf runs with spacing, drawer banks with count and front height, and any dedicated slots for a safe, an ironing board, a laundry hamper or lighting.
Two details on this page save real money later. First, mark which compartments are fixed and which are adjustable, and give the pitch of the adjustability. Second, list the items you actually intend to store — long garments, suitcases above the door, a vacuum in a tall bay — because those drive the dimensions far better than a generic layout does.
Lock the interface with the surrounding build
Built-in wardrobes sit against floors, walls, ceilings, cornices and sometimes skirting. Every junction is a decision, and each one should be written into the specification rather than resolved on site:
| Interface | What to state in writing |
|---|---|
| Floor | Wardrobe on the finished floor or recessed into it; whether skirting is cut away or the carcass is scribed around it. |
| Wall | Filler width, shadow gap, or flush finish; who supplies and finishes the filler. |
| Ceiling | Full-height carcass or pelmet; whether cornice continues over the doors. |
| Electrical | Internal lighting, switch or sensor position, cable route, and which trade makes the final connection. |
| Adjacent joinery | Where the wardrobe meets a vanity, niche paneling or a door opening, and who owns the transition detail. |
Put the doors on paper before production
Door type governs clearance, cost and how the room feels. Hinged doors need a swing arc kept clear of beds and vanities; sliding doors need track depth and a wall or panel to travel into; folding and pocket routes each have their own hardware demands. Our catalogue carries these as distinct product families — hinged, sliding, corner and walk-in configurations among them — so the specification can name the family rather than describe it loosely.
Whatever you choose, ask for a door elevation with the vertical break of every door marked, and check that the breaks line up across a run. On a long wall this single drawing is the difference between a composed façade and a set of panels that read as separate purchases.
Fix the process around the specification
A clear document only pays off if the sequence around it is fixed. Our cooperation steps follow a simple order — project brief and design proposal, then quotation and detail confirmation, then production, shipment and follow-up — and each stage has a defined sign-off.
For multi-bedroom packages, specify room by room but issue one schedule with sequential item numbers, so each unit can be tracked through logistics and door-to-door delivery and matched to the correct room on site. Marking every carcass and door with its schedule number turns an unpacking day into a half-day.
A pre-production checklist
- Finished-level dimensions for width, height and depth, with what each measurement includes.
- Material build-up stated separately for fronts, carcass, back and drawer boxes.
- Finish system named with sheen level and a physical reference to match against.
- Internal elevation per bay, with rail heights, shelf pitch and drawer counts.
- Door elevation showing every break, opening direction and clearance.
- Hardware schedule: hinges, slides, handles or handleless detail, with grade stated.
- Interface details for floor, wall, ceiling and electrical, each assigned to a trade.
- One approved drawing set, dated and signed, as the only production reference.
If you are specifying joinery for a villa or apartment package, send us the room dimensions and the layout you want, and we will price against that document rather than a description — with a specification sheet you can hand to any other trade on site. As a China-based furniture and building materials manufacturer working on residential and hospitality projects, we handle made-to-measure wardrobes alongside the rest of the fit-out, which keeps cabinetry, doors, flooring and finishes coordinated through one production and delivery programme.