Two tone acrylic cabinets usually arrive on site long before the kitchen is ready to receive them. The doors, carcases and worktops come from different production lines, travel in different crates, and are fitted by tradespeople who are not the people who made them. That is where problems start: a scratched high-gloss panel, a door that opens into a handle-less drawer run, or a colour split that lands on the wrong side of the island. None of these are cabinet faults. They are coordination faults, and they are almost entirely preventable before the container is loaded.
This guide walks through the sequence we follow on residential and apartment projects for Two Tone Acrylic Cabinets — from the drawing that locks the two-tone break, to crate labelling, delivery windows and the snag list at handover.
Start with the finish schedule, not the delivery date
Every coordination problem on a two-tone kitchen traces back to an ambiguous finish call. Acrylic fronts are specified by surface type — gloss, matte or metallic — and two finishes can look identical under a showroom lamp but very different once one is catching window light and the other is in shadow. Before anything is scheduled for production, confirm three things in writing:
- which panels carry which finish — upper doors, lower doors, carcass edges, drawer fronts and any tall-unit panels listed separately, not grouped as "kitchen doors"
- where the two-tone break physically falls on each run, marked on the elevation drawing rather than described in a note
- the direction of any grain or directional effect on textured and metallic acrylic, since a panel rotated 90 degrees during fitting reads as a different colour
Our Custom & OEM service covers this specification stage: material and finish options are set against the project drawings, and made-to-measure sizing is confirmed panel by panel. That record becomes the reference for packing and for installation, which is why it has to be precise before production starts.
Work backwards from the site handover date
Delivery planning fails when it is anchored to a factory completion date instead of a site condition. Built-in cabinetry needs a room that is watertight, with a level floor and first-fix services in place, and plaster finished. Painters and electricians then need access around the fitted carcases. That gives you a narrow window, so build the schedule backwards from it.
| Milestone | What must already be settled at this point |
|---|---|
| Production release | Final elevations, finish schedule, appliance schedules and cut-out dimensions signed off by the client or builder |
| Packing and loading | Crate list matched to room and run, not to production batch; hardware separated from panels |
| Freight booking | Incoterms, port of discharge and inland delivery address confirmed; site able to take the vehicle |
| Arrival on site | Dry, secure storage allocated; floor protection laid; crates kept unopened until fitting |
| Installation start | Walls and floors signed off level; services pressure-tested; worktop template date agreed |
| Handover | Snag list closed, doors re-adjusted, protective film removed, care instructions issued |
Freight mode is part of this arithmetic, not an afterthought. Our Logistics and Door-to-Door Delivery service arranges sea, air and rail forwarding with customs paperwork, packing lists, certificates of origin and container loading plans, and the mode you choose changes how much buffer you need between arrival and fitting. For a two-tone acrylic kitchen on a fixed handover date, we normally plan sea freight with slack for inland delivery rather than the tightest possible transit.
Pack to the installation sequence
A crate list organised by production batch is efficient in the factory and chaotic on site. Organise it by where the panels get installed. On a two-tone kitchen this matters more than usual, because an installer opening four crates at once will mix gloss and matte fronts that share the same dimensions.
- Label every crate with room, run and elevation number — "Kitchen / Island west run / Elevation 3" — and repeat the label on each bundle inside.
- Mark left-hand and right-hand doors on the interior face so the front is never handled more than necessary.
- Keep acrylic fronts edge-supported and face-to-face with interleaving, with corner protectors on gloss panels; edges are where impact shows first.
- Pack hinges, runners, handles and adjustment hardware in a separate, clearly marked box that will not be thrown out with the packing material.
- Include a copy of the finish schedule and the labelled elevations inside the first crate the installer opens.
Ask us for the crate list before loading, check it against your elevations, and photograph each crate on arrival before opening. If a panel is damaged in transit, that record is what turns a claim into a replacement instead of an argument.
Site preparation checks the installer will ask you to sign
Most installation delays are discovered on the first morning on site. Run these checks before the fitter arrives:
- Floor level across the full run, not at one point — a few millimetres over three metres is taken up by adjustable plinths, but more than that means packing and scribing on site.
- Wall plumb and square at each carcase position, with the plaster fully dry.
- Water, waste and electrical outlets positioned to the final drawing, tested and documented before the cabinets hide them.
- Appliance dimensions confirmed against the cut-outs specified on the approved layout, including door swing clearances.
- A clear route from the delivery point to the kitchen that takes full-length panels through doors and around corners without dragging them.
Where we are involved beyond supply, this is also the point at which Installation and After-sales Support begins: on-site fitting, inspection with a snag list, spare parts and ongoing maintenance. Whoever fits the cabinets should be briefed from the same drawing set the factory worked to — a site-updated sketch that never made it back to production is a common cause of a replacement panel arriving in the wrong finish.
Fitting order for a two-tone kitchen
The order of work affects how much handling the visible acrylic fronts get:
- Set and level the base carcases along the longest run first; everything else is dimensioned off this line.
- Hang wall units with the tall units checked for plumb before fixing, so the two-tone break aligns across heights.
- Fit worktops and scribe to the walls, then template any cut-outs.
- Attach hinges to doors off the bench where possible, hang doors from one end of a run to the other, and adjust as you go rather than at the end.
- Fit handles and drawer fronts last, after door alignment is set, so gaps are consistent before fronts are fixed.
- Remove protective film only once all trades have finished in the room, then clean edges with a soft cloth.
Two-tone layouts make misalignment obvious: a gloss panel next to a matte one shows every uneven shadow gap. Check alignment at the end of each run, not only at the end of the job.
Handover and the snag list
Walk the kitchen with the client or the builder's site manager against the approved elevations, and record everything on one document:
- Door and drawer gaps measured at the top and bottom of each opening, not judged by eye.
- Finish continuity across the two-tone break, checked in daylight as well as under the kitchen lighting.
- Every panel inspected for transit or fitting damage along edges and corners.
- Soft-close mechanisms, runners and any integrated lighting tested with appliances connected.
- Care instructions issued for acrylic fronts — cleaning agents matter on gloss surfaces, and the wrong product leaves marks that cannot be polished out.
Anything unresolved goes on the snag list with a named owner and a date. Spares are ordered against the finish schedule, so an exact match is possible even weeks later.
What to send us when you enquire
The faster we can plan around your site, the fewer revisions you pay for. Send:
- kitchen elevations and floor plan, with the two-tone break marked
- the finish preference for uppers, lowers and tall units stated separately
- appliance schedule with dimensions
- delivery address, access notes and the target site-ready date
- who is doing the fitting on site — us, your own fitter, or the builder's subcontractor
With those details we can confirm dimensions and selected specifications for the project, quote against a defined scope, and set a delivery window that matches when your kitchen will actually be ready for cabinets. If you are also sourcing Custom Kitchen Cabinets for Residential and Hotel Projects alongside wardrobes, doors or flooring, coordinating them on one crate list and one delivery removes a whole layer of site scheduling.
Send your elevations and target dates to SANTERSON and we will return a specification check, a crate plan and a delivery sequence for your two-tone acrylic kitchen.