A mixed open and closed wall looks simple on a drawing. One elevation, some shelves, some doors, a recess for the television. Then it goes into procurement, and the drawing turns out to be only half of the conversation. The other half is who decides what sits where, how the openings are sized, which doors close which services, and who signs off the dimensions before panels start being cut.
That second half is where design intent and purchasing reality usually drift apart. This article sets out what interior designers and project buyers should agree on, item by item, when they specify Santerson Mixed Open & Closed Systems — the modular living system that combines open elements with closed ones, made to project dimensions with material and finish options.
Why designers and buyers read the same elevation differently
Designers work from appearance. They decide where the eye rests, how much of the wall reads as open shelving, how the grain of a door lines up with the panel beside it, and how the piece relates to the sofa in front of it. Buyers work from buildability and cost. They need a bill of quantities, a fixed size per module, a defined hardware set, and a lead time they can commit to on site.
Both readings are correct. The problem is that a mixed open and closed system sits exactly on the line between them: it has no single standard size, its doors and shelves are proportioned per project, and its finish has to match joinery produced elsewhere in the same building. If the two sides do not align before production starts, the result is either a wall that looks nothing like the drawing, or a wall that looks right but cannot be installed on the agreed date.
What this system actually covers
Santerson Mixed Open & Closed Systems belongs to the Modular Living Systems collection and is intended for residential living projects. Its configuration options are made-to-measure sizing, material and finish choices, and a layout set for each space. That wording matters when you write a specification: the system is not a catalogue item in three widths. It is built around the room.
The same design logic appears across several related collections, which is worth knowing before you decide which one to buy:
- Open Modular Units — shelving-dominant modules for living spaces, no enclosed fronts.
- Closed Modular Units — the opposite end of the range, where storage sits behind doors.
- Floor to Ceiling Modular Systems — full-height configuration for living projects.
- Mixed Open & Closed Storage — the same open-and-closed combination within the Integrated Storage Walls collection, for residential wall systems.
- Open & Closed Combo Units — a lower media-unit format where open and closed storage share one run.
Designers often mix these in one scheme. That is legitimate, but it has to be specified as separate systems with separate dimension sets, not treated as one product family with interchangeable parts.
Seven points that need agreement before production
1. Which items stay visible, and which must be hidden
Start here, not with dimensions. Ask the client what they will actually leave on show: books, ceramics, a turntable, boxes of documents. Then ask what has to disappear — cables, chargers, board games, cleaning supplies. The answer decides how much closed frontage the elevation needs. A wall designed around display first and storage second usually ends up with too little door area; one designed around storage first tends to read heavy.
2. Module width and vertical rhythm
Open bays and closed doors should share a grid. If the designer wants a 400 mm shelf bay next to a 600 mm door, someone has to decide how that joint is expressed and who absorbs the difference. Confirm the module widths on the drawing and have the buyer price against those exact widths, so the quotation matches the elevation rather than an approximation of it.
3. Shelf depth versus carcass depth
Open shelves that are too shallow look decorative and get abandoned; too deep and they swallow the circulation space in front of a sofa. Set the depth from what will be stored, then carry that depth through the closed sections so the reveal line stays consistent. State the internal depth, not just the external one.
4. Door type and clearance
Hinged doors need swing clearance in front of the wall; sliding fronts need a track zone and an overlap allowance. A designer will often draw a flush elevation without indicating which is intended. Buyers should insist that the door type appears on the drawing before it is quoted, because hardware and the surrounding frame detail both change with it.
5. Television position, cable routes and sockets
Where a media zone sits inside the run, the wall has to be coordinated with first-fix electrical work: socket heights, a drop for cables, ventilation behind any enclosed equipment bay. If a lighting layer is part of the design — shelving lighting or an integrated system — the driver and its access point need a location too. Buyers should treat this as a services interface and get it on the same drawing set that governs the joinery.
6. Finish, and what it has to match
In villa and apartment projects this system rarely stands alone. It sits beside wardrobes, a media wall in another room, or kitchen fronts. Specify the finish against the other joinery on the project, not from a sample photo, and confirm that the same material and finish code is used across those items. Santerson's product listings for these modular systems state material and finish options as configurable; the exact board, veneer or lacquer for a given project should be confirmed in writing with the supplier before production.
7. Site conditions and the survey
Made-to-measure only works if the measurement is taken at the right moment. Confirm who surveys, when, and against which finished levels — screed, floor covering, ceiling set-out. Walls are rarely square and floors rarely level, and a full-height run will show both. Agreeing this in advance prevents a perfectly good set of panels arriving for an opening that no longer matches them.
How the specification moves through a project
Santerson's interior design service covers space layout planning, concept design and mood boards, furniture layouts with 3D visual renderings, whole-space indoor and outdoor furnishing schemes, and project design coordination including drawings, production coordination and on-site guidance. Its stated cooperation steps run from project brief and design proposal to quotation and detail confirmation, then production, shipment and follow-up.
For a mixed open and closed system, the useful moment in that sequence is the second one — quotation and detail confirmation. That is when the module grid, door types, internal depths, finish codes and survey data should be locked. Anything agreed later becomes a variation.
Where a project needs dimensions or detailing outside the standard configurations, custom furniture design and prototyping is the route to use: bespoke sizes, material finishes and textures, with 3D modelling and prototyping before production. For buyers running several fit-outs, one-stop furniture and building materials supply keeps this system on the same order as the flooring, wall finishes and lighting around it, which removes one set of interface risk between trades.
A short pre-production checklist
| Item to confirm | Owner | Agreed before |
|---|---|---|
| Display list and hidden-storage list | Designer with client | Layout drawing |
| Module widths and shared vertical grid | Designer, checked by buyer | Quotation |
| Internal shelf depth and carcass depth | Designer | Quotation |
| Door type, hinge side, clearance zone | Designer and buyer together | Quotation |
| Media zone, cable routes, socket set-out, lighting driver access | Buyer / M&E coordinator | First fix |
| Finish code and the joinery it must match | Designer, confirmed with supplier | Production release |
| Final survey against finished levels | Buyer / site team | Production release |
Delivery, installation and the handover snag list
A modular wall is only finished when it is level, anchored and free of transit damage. Santerson's service pages describe freight by sea, air and rail with customs paperwork, packaging and container loading, shipment tracking and door-to-door delivery, followed by on-site installation, inspection and snagging, spare parts and ongoing maintenance. Confirm the freight terms, the delivery point and who carries out the fixing for your own site before you rely on any of it — duty arrangements and installer availability vary from project to project.
Write the snag list against the agreed drawing: door alignment and gap consistency, shelf level across the run, visible fixings, finish continuity where the system meets plaster or flooring. That is the document both sides should sign at handover.
Getting it right
The reason mixed open and closed systems cause more back-and-forth than a standard cabinet order is that every decision in them is visible. A wrong depth is obvious; a misaligned joint is obvious; a door that swings into a sofa is obvious. The fix is not more detail on the drawing but fewer open questions at quotation stage — the display list, the module grid, the depths, the door type, the services interface, the finish code and the survey date, all settled in one pass.
If you are specifying mixed open and closed modular systems for a villa or apartment project, send the elevation and the room dimensions together with the two lists — what shows and what hides — and ask for the module grid to be confirmed back before you release production. That single exchange usually removes most of the arguments that follow.
SANTERSON — furniture and building materials manufacturer, one-stop project supply. Contact: PHILLIP, Phone/WhatsApp +86-13928214007, Email santerson@qq.com. Enquiries: https://www.santerson.com/contact/