A request for quote for mirrored hinged wardrobes usually comes back with two very different prices from two very different factories, and the gap is almost never about the mirror. It is about what the buyer left unsaid: opening clearances, door widths, frame material, interior layout, packaging and delivery terms. This guide walks through each item a purchaser should put in writing before asking for a number, so the quotation you receive can actually be compared with the next one.

Start With the Opening, Not the Wardrobe

Send a measured drawing of the room wall rather than a target wardrobe size. Give the overall length and height of the alcove or wall run, the depth available from finished wall face to finished wall face, and note every obstruction: skirting, architrave, radiator pipework, ceiling downlights, switch plates, door reveals and uneven plaster. Hinged doors need swing clearance in front of the carcass, so state the distance from the wardrobe line to the opposite wall or to the bed, and where the room door enters.

Say plainly whether the unit is built into a recess, fitted against a plain wall, or wrapped around a corner. If you have one, attach the architectural drawing with the relevant elevation marked. A supplier working from a proper elevation can tell you within days where the design will fight the building; a supplier working from three numbers cannot.

Specify the Doors Before the Mirror

On hinged wardrobes the door is the most expensive and most failure-prone component, so quote it in detail:

  • Door construction: framed mirror panel, full-height mirror leaf, or a mirrored panel set inside a wood or laminate frame.
  • Frame material and finish — timber, engineered board with laminate or veneer, lacquered or acrylic-faced panel. State which side of each leaf carries the mirror and which carries the facing panel.
  • Leaf width for each door and the total number of leaves. Narrower leaves swing more easily in a tight room.
  • Hinge type, whether soft-close is required, and who supplies the ironmongery.
  • Handle or pull detail, and whether the mirror edge is bevelled, polished or framed.

Ask the supplier to confirm safe handling details for the glass — mirrored leaves travel differently from solid panels, and packaging that suits a chipboard door will not suit a large mirror leaf.

Give the Interior Layout in Writing

Two identical-looking fronts can carry completely different interiors, which is why an apples-to-apples comparison needs the inside drawn out. State hanging lengths and heights, shelf counts and shelf depths, drawer numbers and whether they are internal or side-mounted, plus provisions for a shoe bay, trouser pull, safe, lighting in the carcass or an ironing board. If you want the layout mirrored left to right across a run, say so — it changes panel counts.

Where the project calls for more than one wardrobe type, list them together. A villa or apartment package often mixes hinged fronts with mirror sliding door wardrobes in rooms where the swing clearance does not work, and classic wooden hinged wardrobes where a matching timber elevation across several bedrooms matters more than a mirrored face. Quoting these together lets the factory balance materials and shipment.

State the Commercial Terms You Need

A quotation is only useful inside its commercial envelope. Include in your request:

  • Quantity of sets or rooms, and whether later phases will repeat the same specification.
  • Preferred Incoterms and the delivery address, plus the port or inland city you are comparing against. Our logistics and door-to-door delivery service covers freight forwarding, export paperwork and container loading plans.
  • Packaging standard — flat-pack, assembled carcass with doors packed separately, or crate for the mirrored leaves.
  • Required on-site date and any site sequence that forces staged delivery.
  • Payment terms and the currency you will pay in.
  • Whether installation, snagging and spare parts are inside or outside the price. Our installation and after-sales support service covers on-site fitting and inspection; ask each supplier to state what their price includes.

Ask For the Same Line Items From Every Supplier

Tell each factory how to structure its reply: carcass, doors, interior fittings, ironmongery, packaging and freight as separate lines. When those lines exist, you can see whether a low price came from a thinner back panel, a cheaper hinge brand or an excluded delivery, instead of discovering it after the deposit.

Also ask what is excluded in plain words. Common silent exclusions are site measurement, corner scribe pieces, plinth and skirting cuts, glass protection film, and replacement leaves for transit damage.

Send Drawings With the Enquiry

Attach a marked-up elevation, a plan showing swing clearance, a finish schedule with sample references, and photographs of the actual wall if the site is a renovation. If you have no drawings yet, say so and ask for design support first — our interior design services cover space planning, 3D renderings and production coordination, and our custom and OEM service handles bespoke finishes and prototyping when a project needs something outside the standard range.

Close your request with three explicit questions: what is the lead time from confirmed drawings, what would change the price most if adjusted, and which details still need confirmation before production. Those answers reveal quickly whether a supplier has read your drawings or simply run a template.

Send your drawings, quantities and delivery terms to SANTERSON for a line-item quotation on make-to-measure mirrored hinged wardrobes for villa, apartment and hospitality projects.