A request for quote for wooden sliding door wardrobes usually comes back with a number, not a price. Two suppliers can quote very different totals for what looks like the same wardrobe on paper, because one has priced the track, the panel construction and the site conditions you never described, while the other quietly left them out.
Sliding wardrobes make that gap obvious. The doors carry their own weight on a rail, they overlap the opening, and the carcass has to be square for the panels to run cleanly — so details the buyer never mentioned end up as extras or as a door that will not close. A quote request that reads like a catalogue order gets you a catalogue answer. Here is what belongs in the enquiry if you want a quotation you can actually compare.
Start with the opening, not the wardrobe
Send the wall-to-wall and floor-to-ceiling dimensions of the recess or the run, measured at several points, and say which finish lines already exist. Sliding panels need an overlap allowance and clearance for the track; a single measurement taken at mid-height will not tell a manufacturer whether the floor is level enough to sit a bottom rail on.
State the room type and how the wardrobe is used — guest bedroom, main bedroom, staff accommodation, serviced apartment. That single line changes what a supplier assumes about panel thickness, hardware duty and interior fit-out, and it costs nothing to include.
Specify the door system you actually want
"Sliding" covers several different mechanisms with different price consequences. In the enquiry, name:
- The number of panels and how they stack — two panels on a twin track, three or four panels for a wide run, bypass or single-stack.
- Track position — top-hung or bottom-rolling — and whether a floor rail is acceptable in that room.
- Panel construction — timber-framed with infill, or a full-height panel — and the edge detail you expect where panels meet.
- Handles, soft-close or catch details, and whether any panel is fixed rather than moving.
If you are open to alternatives, say so and ask for the lower-cost option to be described as well as priced. A quotation that offers one configuration only cannot be compared line by line against another supplier's.
Name the material and finish, or ask for the shortlist
Wood is a category, not a specification. In the RFQ, identify the substrate you expect for the carcass and shelves, and the surface you want on the doors — a painted or lacquered panel, a melamine decorative surface, a wood veneer, or solid timber. Each behaves differently at a door edge, and each wears differently in a heated bedroom.
Give the colour reference properly: a manufacturer's code, a RAL number, a physical sample you can post, or a photograph of an installed reference. "Light oak" means three different things to three factories. If you have not decided, ask for two or three finish options with their differences explained — custom furniture materials and finishes are where a made-to-measure supplier earns its place, rather than simply matching a drawing you already have.
Send the interior layout, not just the elevation
The doors are visible; the interior is where cost creeps up. Include hanging rail lengths and heights, drawer counts and widths, shelf spans, any full-height or mirror panel behind a door, lighting provisions, and what happens at the ends of the run — returned panels, skirting cut-outs, or scribed to the wall.
If you have no layout yet, say so in the enquiry and ask for one. A supplier who plans interiors routinely will propose a layout from your dimensions, and you can then price two versions against each other instead of guessing at quantities yourself.
Attach drawings and photographs
A sketch with dimensions beats an email description. Attach the architectural elevation or joinery drawing if one exists, plus photographs of the wall, floor and ceiling from both ends of the run. Note obstructions: air conditioning returns, downlights, skirting, cornices, uneven plaster, doors or switches that swing into the wardrobe line.
For a multi-unit job — an apartment block, a villa with several bedrooms, a serviced-apartment fit-out — list each unit and its run length in a table. Identical-looking rooms often differ by tens of millimetres, and one price for "as per drawing" hides that.
State the delivery and installation arrangement you expect
Say where the goods must land: port, warehouse or site, and whether your own fitters will install them. Sliding wardrobes are made-to-measure, so who sets the tracks and aligns the panels matters more than it does for a loose piece of furniture.
If you want supply-and-fit, ask how it is covered: site survey before manufacture, panel protection on site, adjustment after fitting, and what happens if an opening moves out of square while other trades are working. Ask the same questions of every bidder so the comparison stays honest.
Ask for the quotation to be broken down
Request that each quote itemise carcass, doors and hardware, interior fit-out, finishing, packaging, freight terms and any site work separately. A single lump sum cannot be compared line by line, and it makes later changes hard to price.
- Ask what is excluded as clearly as what is included — tracks, scribing, cornices, lighting, on-site protection.
- Ask which figure is firm and which is provisional pending a site measurement.
- Ask how much of the price changes if a run lengthens by 200 mm or one drawer is added.
- Ask for the lead time from confirmed drawings, not from the date of order.
Confirm what happens before manufacture starts
Made-to-measure joinery is only as good as the approval stage. In the enquiry, ask for shop drawings or a confirmation sheet with final dimensions, finish references and interior layout, and make it clear that production begins after you sign it. That clause settles most disputes on sliding wardrobe orders, because the measurements become somebody's responsibility rather than an assumption carried by both sides.
Also ask what tolerance applies between drawing and installation, and how a site discrepancy is handled if it surfaces after manufacture. A supplier who answers that question directly is usually the safer one to brief.
Where a made-to-measure supplier changes the answer
If the wardrobes are part of a wider fit-out — bedroom joinery, built-in furniture, wall panelling, doors and flooring coming from more than one vendor — the RFQ should say so. Coordinating finishes across trades avoids the familiar problem of a wardrobe panel that matches the sample but not the installed floor beside it.
For villa and apartment projects in Australia, SANTERSON supplies wooden sliding door wardrobes to project-specific dimensions, with material and finish options and an interior layout set out for each space. The same made-to-measure approach covers the rest of the joinery package, from customized furniture through freight and installation, so the wardrobes are quoted in the context of the whole fit-out rather than as an isolated line.
Before you press send — check these are in the enquiry
- Multiple measurement points for width, height and depth of every run
- Panel count, track type and stacking arrangement
- Carcass substrate and door surface, with a colour or sample reference
- Interior layout, or an explicit request for one
- Drawings plus photographs of the actual opening
- Delivery point and who installs
- Itemised pricing, exclusions, and lead time from approved drawings
- A written approval step before manufacture
If the wardrobes are one line in a longer joinery schedule, send the whole schedule. Matching finishes across bedrooms, doors and panelling is easier to hold together when one supplier prices them.