A swim spa is one of the few outdoor products that behaves like a pool, a spa and an electrical appliance at the same time. That is exactly why the ordering conversation matters more than the brochure photo. If you are evaluating Outdoor Swim Spa WS-S38 for a villa terrace, a resort garden or a private wellness area, the questions below are the ones worth putting to your supplier before a proforma invoice is issued.
1. What exactly does the standard configuration include?
The published specification for WS-S38 lists a control system, three water pumps, one filter pump, 51 jets with six water columns, four LED lights with twelve small LED lights, and a total power figure of 14.05 kW. Features shown on the page are water jets, LED lighting, ozone and a waterfall.
Ask your supplier to restate that list in writing as the standard delivery scope, item by item, and to mark clearly what sits outside it. Jet counts and pump counts read impressively in a table, but they only mean something once you know which of them are included at the quoted price and which belong to an upgraded package.
2. Which options are available for this model, and which do we actually need?
The catalogue lists optional accessories across the range — control systems, UV sterilisation, additional water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so the right question is not "do you offer a heat pump?" but "which heat pump, filtration and insulation options are compatible with WS-S38, and what does each one change about running cost and installation?".
For year-round outdoor use in a cooler climate, heating and insulation usually decide the practical season length far more than jet count does. For a resort or hotel setting, water treatment options such as ozone and UV affect daily maintenance routines, so get the maintenance procedure described before you choose.
3. Will the shell fit the slab, and what does the site need to do?
The catalogue dimensions for WS-S38 are 3760 × 2080 × 1110 mm. Compare that footprint with your available area including clearance for access, maintenance hatches and steps, then confirm the required supporting structure and drainage with your own engineer or contractor.
A swim spa shell arrives as a manufactured unit; the base, load path, drainage and services around it are local works. Ask what the supplier needs from your side — level tolerance, access width for delivery, crane or forklift requirements — and who is responsible for each item.
4. What electrical supply does the selected configuration require?
The 14.05 kW figure published for WS-S38 is a specification shown on the site, not an installation instruction. Electrical demand depends on the final configuration: heat pump, additional pumps and lighting options all change the load. Ask for the required supply voltage, phase, breaker rating and cable sizing for the exact build you are ordering, and hand that sheet to a qualified local electrician.
Do not assume your existing outdoor circuit will carry it. Getting this requirement early also prevents a second visit by the electrician after delivery.
5. How does WS-S38 compare with other models in the range?
The Swimming Pools and Swim Spas category covers many configurations, and the numbers differ considerably. WS-S12, for example, is a much longer shell at 11740 × 2200 × 1470 mm with 73 jets and a published total power of 7.65 kW.
| Item | WS-S38 | WS-S12 |
| Catalogue dimensions | 3760 × 2080 × 1110 mm | 11740 × 2200 × 1470 mm |
| Jet total | 51 pcs, 6 water columns | 73 pcs |
| Water pump / filter pump | 3 pcs / 1 pc | 2 pcs / 1 pc |
| Published total power | 14.05 kW | 7.65 kW |
| Features shown on site | Water jets, LED lighting, Ozone, Waterfall | Water jets, LED lighting, Ozone |
A shorter shell with more installed power and a longer shell with less are different products serving different habits. Decide first how the space will be used — short high-intensity hydrotherapy sessions, or long lap-style swimming — and let that drive the model choice rather than the reverse.
6. Can the shape or finish be customised?
Where a fixed shell does not suit the plan, part of the range supports customised shapes such as square, round, oval and curved designs, with an acrylic shell and structural reinforcement for garden, terrace and leisure installations. If your project needs a non-standard geometry or finish, raise it at quotation stage, because custom work changes drawings, production sequence and lead time compared with ordering a catalogue model.
7. How is it packed, shipped and delivered?
SANTERSON handles freight forwarding by sea, air and rail, together with packaging, container loading, customs paperwork and door-to-door delivery. For a swim spa specifically, ask how the shell is protected against cracking in transit, what the receiving party must check on arrival, and how damage claims are handled. Also confirm who clears customs at destination and which import documents you will receive.
Import terms, duties and transit time vary by country, so treat these as project-specific items to be confirmed in writing for your delivery address rather than assumed from marketing material.
8. Who installs, commissions and maintains it?
The services offered include on-site installation, inspection and snag lists, warranty coverage, spare parts and ongoing maintenance. For a swim spa, ask specifically who performs commissioning — filling, balancing the water treatment system, testing jets and heating — and what documentation is handed over at completion.
Also ask which wear items are considered consumables, how spare pumps, jets and LED modules are supplied later, and what information you need to keep so a replacement part can be identified years afterwards.
Before you send the enquiry
Have these ready so the quotation comes back usable:
- A dimensioned plan or photo of the intended location, including access route from the delivery point.
- Intended use: private family use, resort guest use, or wellness/therapy use, and expected season of operation.
- Local supply details: available voltage and phase at the installation point.
- Your preferred Incoterms and destination address for delivery.
- Any local permit or inspection requirement your authority imposes on outdoor water installations.
SANTERSON is a China-based manufacturer and one-stop supplier of furniture and building materials working on villa, hospitality and office projects worldwide, with custom/OEM service, logistics and installation support. Send the questions above with your site information and the specification for Outdoor Swim Spa WS-S38 will be confirmed configuration by configuration before production begins.