A stacked laundry unit looks simple on a drawing and complicated on site. Two appliances, one cabinet, a small room. But if the request for quote only says "one stacker, 600 mm wide", the quotation that comes back rarely matches what the builder has already framed, plumbed and tiled. What follows is variation orders, re-made panels, and an appliance that cannot be pulled out for servicing without removing the enclosure.

A good request for quote does not have to be long. It has to answer, up front, the questions a manufacturer would otherwise guess at. Here is what we ask project buyers to send when they are pricing stacked laundry units for villas, apartment bathrooms and hospitality fit-outs.

1. The opening you are actually building into

Give the finished structural opening, not the nominal module size. State width, height and depth as clear-opening dimensions, and say whether they are measured to the face of the finished wall or to substrate. A 10 mm difference in tile thickness decides whether a door clears the wall.

  • Finished opening width, height and depth, with the measurement reference stated.
  • Wall build-up: substrate, waterproofing membrane, adhesive and tile or panel finish, with thicknesses.
  • Whether the unit sits on a finished floor, a raised floor, or a plinth, and the floor finish level.
If the opening is not fixed yet, say so. We will quote to design intent and flag which dimensions must be confirmed before production starts.

2. The appliances you intend to install

Stacked units are built around the machines. Give brand and model, or at least the appliance category with external dimensions, door swing direction, and whether the dryer vents or is a condenser type. If the model is not decided, send the size envelope you want the cabinet designed to and we will design for that range.

  • Washer and dryer external dimensions, weight, and door opening direction.
  • Stacking arrangement: washer below dryer or the reverse, and whether that order is fixed.
  • Service access: does either appliance need to slide out fully for repair?

This is also where washer dryer cabinets and stackers part company. A side-by-side cabinet has different ventilation and door-clearance requirements, so name the configuration type in the first line of the enquiry instead of leaving it to be inferred.

3. Services: water, waste, power and ventilation

Send a services sketch with positions marked. Cold and hot inlets, waste outlet height and centre line, power outlet location, and any exhaust requirement for the dryer. State whether pipework runs within the cabinet zone or behind it, because that determines how much usable depth is left and whether a service void has to be built into the carcass.

  • Inlet, waste and power positions with heights from finished floor and offsets from a common datum.
  • Stop valves or taps inside or outside the cabinet, and whether an access panel is required.
  • Dryer exhaust route if applicable, including duct size and where it terminates.

4. Moisture exposure and the material you expect

Stackers are often located inside a bathroom rather than in a separate laundry, which puts them in a wetter environment. Say plainly whether the unit sits in a shower-adjacent wet zone, in a drier bathroom corner, or in a dedicated laundry room. That one line determines the board substrate, edge treatment and finish system we specify.

Name the finish you want to match too: laminate, lacquer, veneer, or a colour reference from your own schedule. Our compact laundry solutions are made to measure with material and finish options selected per project, so the finish system belongs in the request rather than being settled later.

5. Storage and internal fit-out

Specify what has to live in the unit. Detergent storage, an ironing board, hanging rails, baskets and hampers each need different internal dimensions and hardware. If you want pull out laundry hampers or a laundry & storage combo arrangement, name it and give the number of compartments so runners and basket sizes are priced from the start.

  • Internal layout: shelves, drawers, rails and hamper bays, and which side each sits on.
  • Door type: hinged, sliding, bi-fold or pocket, plus handle or handleless preference.
  • Hardware grade for the setting, particularly where humidity is high.

Where the room is narrow and storage has to run to the ceiling, multi function tall cabinets usually answer better than a short stacker with a shelf above it. Flag the room constraint and we will price both so you can compare.

6. Quantity, unit of measure and project schedule

Give quantities per type rather than one lump figure. "Six stackers in apartment Type B, four in Type C, two laundry and storage combos" produces a quotation you can line up against your bill of quantities. Add the required delivery window, the phase sequence if units ship in stages, and the date on which site dimensions must be frozen.

Item to stateWhy it changes the price
Quantity by unit typeRepeated identical carcasses are produced differently from one-off sizes.
Number of distinct sizesEach unique dimension carries its own drawing and panel set.
Site address and delivery accessAffects packaging, crate size, and whether units can be delivered assembled.
Required site dateDetermines the production slot and the shipping mode available.

7. Drawings, documents and approvals

Attach what you already hold: bathroom elevations, the joinery schedule, the finish schedule, and any consultant comments received so far. If your client requires shop drawings for approval before manufacture, state that in the request so the drawing stage is included in the price rather than added later as an extra.

8. What a complete quotation should return to you

Judge the reply against your own request. A usable quotation itemises the carcass specification and board type, the finish system, hardware make and grade, ventilation and service provision, packaging, delivery terms, and the drawings included. It should also state which dimensions are assumed and which must be site-verified before production.

If a supplier quotes from a two-line enquiry without asking for opening sizes or appliance details, treat that figure as an estimate rather than a price you can build on.

How we handle these enquiries

SANTERSON has been manufacturing furniture and building materials since 2008, supplying project customers in hospitality, villa and office work. Laundry integration is produced alongside the rest of the interior fit-out package — vanities, tall cabinets, wall panelling and sanitary fixtures — so one request can cover the whole bathroom joinery scope instead of being split between several suppliers. As a custom furniture manufacturer we work to your dimensions, materials and finishes, and through our one-stop furniture and building materials supplier service the same package can also be quoted for freight and door-to-door delivery.

Send opening dimensions, appliance details and a services sketch, and the quotation we return will state its assumptions instead of hiding them.

Common questions

Do I need the appliance model before requesting a quote?

No. An envelope of acceptable external dimensions is enough to price the cabinet, provided you accept that final internal clearances are confirmed once the appliance is selected.

Can a stacked unit be built inside a bathroom rather than a separate laundry?

It can. Tell us how close it sits to the shower or bath so substrate, edges and hardware are specified for that level of moisture exposure.

Should I price stackers and side-by-side cabinets together?

Yes, while the layout decision is still open. Pricing both configurations against the same room dimensions makes the trade-off between storage volume and service access visible before drawings are frozen.