A glass walk-in wardrobe is one of the most specification-heavy items in a villa or hotel bedroom package. The glazing, the frame, the interior layout and the lighting all have to arrive as one coordinated set, and none of it comes off a shelf. That is exactly where OEM sourcing makes sense: the manufacturer builds your design, under your brand, to your dimensions. Below is how that process actually runs at SANTERSON, from the first drawing to the finished cabin.

What "OEM" Means for a Built-in Wardrobe

In this context OEM means the factory produces the wardrobe to your drawings and your finish schedule, rather than offering you a fixed model from a catalogue. You keep control of the design; the supplier supplies engineering, materials and production. For developers, contractors and interior firms ordering wardrobes across several units or guest rooms, this removes the compromise of trying to fit standard sizes into a room that was drawn independently.

Our Glass Walk in Wardrobes line is specified this way. Each unit is made to measure, with material and finish selected per project and a layout drawn around the actual room. There is no single "standard" dimension or glass type to quote, because the specification is written for the job.

Step 1: Send the Room, Not a Product Code

The enquiry starts with drawings and photographs rather than a model number. What we need from the buyer's side:

  • Floor plan and ceiling height for the wardrobe room, including skirting, columns and any services running through the walls
  • Which walls are load-bearing, since glass-fronted walk-in cabins often need a fixed frame that carries the doors
  • How many of each layout you need — one villa, or the same detail repeated across apartments
  • The finish direction: aluminium frame colour, clear / bronze / smoked / frosted glass, and carcass material

If your team does not have detailed drawings yet, our interior design service can work from the space itself — layout planning, concept boards and 3D renderings before anything goes into production. See Interior Design Services.

Step 2: Choose the Glazing and Frame, Then Lock the Specification

Glass is the visible decision, and it drives both appearance and cost. Within the same walk-in collection you can specify:

Glass optionWhere it works
Clear glassBoutique-style rooms where the interior display is part of the design; needs tidy internal organisation to look right
Bronze or smoked tintSofter reflection under warm hotel lighting; hides clutter while still reading as glass
FrostedPrivacy for shared family bathrooms and guest rooms without losing daylight into the room
Aluminium-framed glassSlim sightlines and a rigid edge for tall doors — see Aluminum Frame Glass Wardrobes

At this stage we confirm carcass board, edge treatment, hardware, drawer and hanging configuration, and any integrated lighting. Every item is written into a specification sheet that both sides sign off before cutting. That document — not a brochure — becomes the reference for the whole order.

One thing buyers should insist on: confirm the final dimensions and selected finishes in writing against your own site survey. Glass sizes cannot be adjusted on site, so measurement sign-off is the single most important checkpoint in the process.

Step 3: Prototyping and Your Brand

For repeat orders — a housing development, a hotel group rolling out a room standard — most clients ask for one prototype cabin first. We handle custom design and prototyping, bespoke finishes and textures, and OEM production under your own brand, including engraving, logos and packaging where required. Flexible minimum order quantities mean a single villa project and a multi-unit order are both workable.

Full details are on our Custom & OEM Service page.

Step 4: Production and Quality Checks

Once the specification is signed, production runs in our factory in China with quality control at each stage. For wardrobes this means checking panel sizes against the drawing, glass dimensions and edge finishing, frame squareness, and hardware function before anything is packed. Because a walk-in wardrobe arrives as a kit of panels, doors and fittings, packing is planned around the sequence of installation, with each bundle labelled to its room.

Step 5: Shipping to Site

Wardrobes travel by sea in most project orders, with air or rail available when a schedule demands it. We arrange freight forwarding, packaging and container loading, customs paperwork such as commercial invoices, packing lists and certificates of origin, shipment tracking, and door-to-door delivery to the site address. Import terms and duties are agreed per shipment rather than assumed — worth confirming early if your project is in Australia, where we have delivered villa work in Sydney, Melbourne, Perth, Willoughby and North Turramurra.

Logistics scope is described on the Logistics & Door-to-Door Delivery page.

Step 6: Installation and Snag Closure

A glass wardrobe is only as good as its installation: frames must be level, doors aligned, and glass handled properly on site. We provide on-site installation support, inspection and snag closure, then warranty cover, spare parts and ongoing maintenance afterwards. Details are on Installation & After-sales Support.

What to Ask a Supplier Before You Commit

  • Will you produce to my drawings, or only to your own models?
  • Who signs off the site measurements, and what happens if they change after production starts?
  • Which glass and frame combination is quoted — and is that written into the specification sheet?
  • Is a prototype available before the full order runs?
  • What exactly does the delivered price include: freight, insurance, customs clearance, installation?

A supplier who answers these in writing is running a real OEM process. One who answers with a catalogue price list is not.

Send us your wardrobe drawings

Share your floor plan, preferred glass and frame finish, and unit quantities, and we will return a specification and quotation for made-to-measure wardrobes under your own brand. Contact SANTERSON — Contact Us.