A decorative moulded paneled wardrobe looks simple on a drawing: a run of doors, each with a profiled frame and a shaped centre panel. In production it is one of the less forgiving items in a joinery package, because the moulding, the panel fit and the finish all have to match across every door in the set. That is why buyers usually approach these wardrobes as an OEM order rather than a catalogue purchase. Below is how that process actually runs at SANTERSON, what we need from you, and where orders most often go wrong.

The short answer: you supply the room dimensions, the appearance intent and the door operation; we return shop drawings, a physical sample for sign-off, then production to that approved sample, with freight arranged to site. The wardrobe is built to your project, not selected from stock.

What "decorative moulded paneled" means in the workshop

Our Decorative Moulded Paneled Wardrobes sit within the Classic Paneled Wardrobes collection. The defining feature is the moulded profile on the door frame — the shape that catches light along the edge of each panel and gives the piece its character. Two practical consequences follow from this.

First, the profile has to be consistent across the whole run. Doors machined in separate batches can differ slightly in how sharp the moulding reads, which is only visible once everything is hung side by side on site. Second, panel movement has to be engineered into the joint. A centre panel locked rigidly into a frame will show cracks at the moulding line as humidity changes; the joint detail matters more than the board material.

Related models in the same family let you dial the look up or down without changing the construction logic: Raised Panel Wardrobes for a more pronounced profile, Recessed Panel Wardrobes for a flatter, quieter face, and the Shaker Panel Wardrobe where the moulding is deliberately restrained. Comparing these three against your render usually settles the specification faster than describing it in words.

The OEM sequence, step by step

Custom & OEM Service at SANTERSON covers custom furniture design and prototyping, bespoke material finishes and textures, OEM manufacturing, flexible minimum order quantities, and brand customisation such as engraving or private labelling. For a paneled wardrobe order, that breaks down into six stages.

  1. Brief. Room dimensions and ceiling heights, the elevation you want, door operation (hinged, sliding, corner), interior layout — hanging rail heights, drawer banks, shelving — and the target finish. A sketch or a reference photograph is enough to start.
  2. Shop drawings. We draw the wardrobe to your openings, showing door sizes, moulding profiles at full scale, panel thicknesses and the interior configuration. This is where dimension errors get caught, before any board is cut.
  3. Sample and finish approval. Where the profile or colour carries the design intent, we produce a sample so you can judge the moulding and the finish in the hand rather than from a photograph. Approving at this stage prevents disputes later.
  4. Quotation and specification lock. Pricing follows the approved drawings and selected materials — board material, door facing, finish system, hardware, glazing if any. Once signed, changes to profile or finish are treated as variations.
  5. Production and inspection. Doors for one room are machined as a set so the profiles match, finished in a controlled environment, then inspected and packed panel by panel.
  6. Delivery and installation support. Freight is arranged under Logistics & Door-to-Door Delivery, with on-site installation, inspection and snags handled through Installation & After-sales Support.

If your project needs more than wardrobes — kitchen cabinetry, vanities, doors and wall panelling from the same joinery team — the One-stop Furniture and Building Materials Supplier route keeps those items on one set of drawings, one production schedule and one shipment.

What to specify before you request a quotation

The following list is what our team asks for. Having it ready shortens the drawing cycle considerably.

  • Verified dimensions. Finished floor to finished ceiling, wall to wall, plus the position of skirting, architraves, switches and any services that the carcass has to clear. Give us the as-built figures, not the design-stage ones.
  • Profile reference. A drawing at 1:1 scale for the moulding, or a physical sample you already hold. Written descriptions of a profile are unreliable.
  • Finish system. Painted, lacquered, veneered or foil-wrapped, with a colour reference such as a RAL code or a sprayed sample. Moulded edges read darker under spray than flat faces do, so judge the colour on a profiled sample.
  • Interior configuration. Long-hang and short-hang heights, trouser pull, drawer count and depth, shoe or accessory shelving, and integrated lighting if wanted.
  • Hardware and operation. Hinge type and soft-close requirement, sliding track system for wider openings, handle or integrated finger pull.
  • Site conditions. Floor levelness, wall plumb, and the room's position in the building — a top-floor bedroom and a ground-floor guest room are not treated the same way when it comes to panel movement allowance.

Our product pages state made-to-measure sizing, material and finish options, and layout tailored to the project. Dimensions and selected specifications are confirmed with you for each project before production begins, so nothing here is fixed until your drawings are signed.

Where these orders typically go wrong

Ordering to design-stage dimensions. A wardrobe run measured off architectural drawings rather than the finished room is the most common cause of rework. Plasterboard, screed and skirting change the numbers by enough to matter once moulded doors are involved.

Approving a flat colour sample for a profiled door. Spray pools in the moulding line and thins on the arrises. A flat swatch that matched your specification can read two shades heavier once machined. Always approve a sprayed, profiled sample.

Splitting the joinery package across suppliers. Wardrobes ordered separately from doors, vanities and panelling means three different interpretations of the same finish and three delivery windows. Coordinating them under one Turnkey Interior Project Solutions scope removes that mismatch.

Treating the interior layout as fixed later. Drawer banks and lighting change carcass depths and require blocking for fixings. Settle the internal configuration at drawing stage, not after production starts.

Questions buyers ask us most often

Can you match a wardrobe we have already specified from another supplier?

Usually yes, provided you can send the profile drawing and the finish reference. Where only a photograph exists, we machine a sample door for approval before committing the full run.

What is the minimum order quantity?

Our OEM service works with flexible minimum order quantities, so single-apartment and multi-unit villa orders are both workable. The practical threshold depends on the profile tooling and the finish system you specify — tell us the unit count and we will confirm.

Can our brand or the developer's logo be applied?

Yes. Brand customisation including engraving, embossing, logos and packaging is part of the OEM scope, which matters for developers furnishing show units and for contract furniture programmes.

Do you ship a full wardrobe kit to site?

Freight by sea, air or rail is arranged with customs paperwork, packing lists and container loading plans prepared on our side, delivered door-to-door. Panels are packed so that moulded edges are protected in transit.

If you have a bedroom or dressing-room package to price, send the room dimensions and one reference image of the profile you want. We will come back with shop drawings and a sample plan, and you can judge the moulding before anything goes into production.