A corner wardrobe with hinged doors looks like a small line item on a joinery schedule until it arrives on site and the doors will not clear a bed, a skirting return or an out-of-plumb wall. The gap between what designers draw and what buyers procure is where most of that trouble starts. Below is the alignment we ask for on every Hinged Door Corner Wardrobe we build, and the same checklist works as a procurement brief whatever supplier you are dealing with.
Start from the corner itself, not from the door elevation
Corner units fail for geometry reasons before they fail for finish reasons. Before any door schedule is issued, both sides should agree on:
- The internal angle of the corner — nominally 90 degrees, but verified on site, because a two-degree deviation changes how each leaf sits against its neighbour.
- Which leg of the corner carries the return, and where the carcass stops: at the wall, at a column, or short with a scribe panel.
- Clear floor-to-ceiling height at both ends of the run, plus the position of beams, bulkheads, AC lines and light switches.
- Skirting, architrave and finished-floor levels, since a made-to-measure carcass is dimensioned to the finished condition, not the structural one.
Our Hinged Door Corner Wardrobes are made to measure, with the layout and dimensions set per project. That flexibility only pays off when the site dimensions reach us before the drawing is frozen.
Swing clearance: the item designers and buyers most often miss
Hinged doors need a swept arc in front of them. Sliding alternatives such as Sliding Door Corner Wardrobes avoid that requirement entirely, so the choice of opening type is really a room-planning decision. To keep hinged doors workable, fix these numbers on the drawing:
- Door leaf width per opening, and whether the corner is closed by one leaf on each leg or by a bank of leaves with a false post.
- Handle and knob projection, added to the swept arc — a protruding handle eats clearance that a flush pull does not.
- Furniture swing zones: bed door, wardrobe access aisle, bathroom entry, and any hinged window or balcony door in the path.
- Adjacent returns. Where a run turns into an alcove, an L Shaped Corner Wardrobe layout is often the honest answer rather than forcing single leaves onto a tight return.
If the room cannot give the clearance, say so at design stage. It is cheaper to change a door type on paper than to re-hang an installed unit.
Interior layout: what the buyer has to specify, not assume
The carcass is only half the order. The internal configuration drives cost and delivery timing, so it belongs in the buyer's scope, confirmed in writing:
- Shelf, hanging-rail and drawer positions, including whether the corner bay gets a rotating or pull-out access fitting or plain fixed shelving.
- Rail heights for long-hang and double-hang zones, checked against the occupant profile of the project — a serviced-apartment fit-out is not a family villa.
- Integrated lighting, mirror panels and any glass-front sections, which affect both hinge loading and the wall build-up behind them.
- How the corner unit ties into neighbouring storage. Where open display is wanted at one end, Open Corner Wardrobes can be matched to the same carcass system and finish.
Materials, finishes and tolerances: agree the language
Designers specify a look; buyers specify a build. Those have to be reconciled on paper before production. Our wardrobe range is offered with material and finish options selected per project, so we ask for both references in the same enquiry:
| Design intent | What the buyer should confirm |
| Matte, handleless frontage in a warm neutral | Board substrate, surface system, edge treatment, and whether integrated or routed handles are acceptable in that colour |
| Full-height seamless elevation with concealed hinges | Leaf weight limits, hinge specification, door gap tolerance, and opening clearance against the adjacent wall |
| Warm woodgrain to match the flooring | Veneer or laminate construction, grain direction across leaves, and an approved physical sample rather than a screen render |
One physical finish sample approved by both parties removes more disputes than any number of emailed colour codes.
Documentation, sequencing and site readiness
Built-in joinery sits on the critical path of most bedroom fit-outs. Before a wardrobe order is released to production, we want the following closed out:
- Approved shop drawings signed by the designer, with dimensions taken from site, not from architectural models alone.
- Wall build-up confirmed — plasterboard, block or clad — so fixings and scribe details are correct.
- Wet trades finished and floors level, since moisture and uneven substrates cause failures that later get blamed on the joinery.
- Delivery route checked: lift dimensions, stair widths and corridor turns for the largest pre-assembled module.
For projects that need joinery coordinated alongside flooring, wall panelling, doors and lighting rather than ordered trade by trade, our Turnkey Interior Project Solutions cover design coordination through production and site installation as one package.
SANTERSON manufactures custom built-in furniture for villa, hospitality and office projects, with made-to-measure wardrobe layouts, project-selected finishes, door-to-door delivery and installation support. Send us your corner dimensions and elevation intent, and we will return a buildable proposal rather than a catalogue substitution.