A glass-front dining cabinet rarely fails on looks. It fails on the paperwork: one unit ordered twice, a second run quoted at a different price, or a glazed door that arrives after the wall it was meant to sit between. If you are specifying Santerson Glass Front Dining Cabinets for a villa, apartment or hospitality fit-out, the quantity list and the coordination sheet are what decide whether production runs smoothly. This guide walks through both, using the dining-room family on our site as the worked example.

Start with rooms, not pieces

Counting cabinets before you have settled the room layout is how duplicate orders happen. Walk each space and record the wall run, the clear floor width, the ceiling height where the unit will be built in, and what sits next to it — a door opening, an appliance, a radiator, a skirting return. Every one of those constraints changes a made-to-measure carcass.

Our glass front dining cabinets are configurable rather than fixed: each product page lists made-to-measure sizing, material and finish options, and a layout tailored to the project. That flexibility is useful only if the dimensions you send match the opening on site, so the room list comes first and the unit count follows from it.

Build the quantity list in four columns

Buyers who order custom joinery usually lose control at the schedule stage, because quantities are quoted without finishes or dates attached. Keep one table with four columns and fill every cell before you request a quotation.

  • Reference — room code plus item type, for example LR-GLF-01 for the first glass-front unit in the living/dining area. Never order by product name alone.
  • Quantity and size — number of units with width, height and depth per unit, taken from site measurements, not from a typical drawing.
  • Finish and glazing — carcass material, door finish, glass type and frame detail. One reference should carry one finish; if a room needs two, create two references.
  • Required on site — the date each block must land, split by phase rather than one single delivery date for the whole project.

Send that table as it is. A quantity list with references, sizes and dates lets us quote a production schedule; a list of names alone forces a second round of questions and delays the order.

Coordinate the dining wall across the collection

A dining wall is usually a mix of types, and mixing them is where coordination pays. Within the same built-in furniture range you can pair glass-front units with closed storage so display and everyday items sit in one continuous run:

Group these by phase, not by product. Units that share one wall must be produced to one setting-out drawing and delivered together; units in a guest suite or second apartment can follow later. Splitting by phase protects both the site programme and your cash flow.

Lock the details before production starts

Custom joinery is unforgiving after sign-off. Before you approve production, confirm in writing:

  • Final site dimensions for every reference, including floor-to-ceiling height where the unit is built in.
  • The finish and material selection for each reference, matched against a sample rather than a screen image.
  • Glass type, door orientation and handle or handleless detail on glazed doors.
  • Internal layout — shelf heights, drawer stack, and where display lighting is required, with the wiring point agreed before the carcass is built.
  • Wall condition and fixing method for wall-mounted items, confirmed with your site team.

Where a run continues into the kitchen, coordinate it with the custom built-in kitchen cabinets on the same drawing. Matching carcass material, door finish and hardware keeps the joinery reading as one design instead of two separate purchases.

How our process supports the order

SANTERSON has operated since 2008 as a China-based manufacturer and one-stop supplier of furniture and building materials, with turnkey delivery from design through production to door-to-door shipping. For a dining-wall package that means one party holds the drawings, the finishes and the schedule.

Our interior design services cover space layout planning, furniture layouts and 3D renderings, plus drawing and production coordination with on-site guidance. Cooperation runs from the project brief and design proposal to quotation and detail confirmation, then production, shipment and follow-up. If you need sizes or finishes beyond the published options, our custom and OEM service covers bespoke design, prototyping and material selection.

Delivery is arranged as freight forwarding with customs paperwork, packaging and container loading, and door-to-door delivery. Split your quantity list by phase so each shipment matches a site sequence. On arrival, installation and after-sales support cover fitting, inspection and snags — send your site contact and access details with the order so the fitters are booked against real dates.

A short pre-order checklist

  • Every reference has a quantity, size, finish and required-on-site date.
  • Units sharing a wall are on one setting-out drawing and in one shipment.
  • Finish samples approved before production sign-off.
  • Glazing, door orientation and lighting wiring confirmed in writing.
  • Adjacent trades — flooring, plastering, electrical — scheduled around the installation window.

Send us your room list and reference table and we will return a specification and production schedule you can put straight into the programme. Contact PHILLIP on +86-13928214007 (phone/WhatsApp) or through our contact page to start the quotation.