A glass folding door is one of the few openings in a villa or hospitality project where the drawing, the opening and the hardware all have to agree before anything goes into production. Because our doors are made to measure rather than picked off a shelf, the quality of your enquiry information decides how quickly a workable quotation comes back. Here is exactly what we ask for on Santerson Glass Folding Doors, and what happens if some of it is still missing.

Every set of folding doors on this page is made to measure, with material, finish and layout selected per project. The figures below are the information we need from you, not fixed product specifications — confirm the final dimensions and selected specifications for your own opening before ordering.

The opening itself: what to measure

Send the clear structural opening rather than a nominal or rounded figure. For each opening we need:

  • Width and height of the structural opening, in millimetres, measured at several points across the span — floor slab to head restraint, and side to side at high, middle and low levels. Older villas rarely have square openings, and a 10 mm difference between top and bottom changes the leaf count.
  • Finished floor level. Tell us whether the recorded height is taken to the structural slab or to the finished floor, and what the floor build-up will be (tile, screed, underlay). Folding doors sit on a track, so the finish level decides the threshold detail.
  • Head depth and reveal. How much space is available above the opening for the header and track, and whether the frame is recessed into the reveal or face-fixed.
  • Obstructions near the opening — downlights, bulkheads, gutter lines, skirting, radiator or pipework runs, wall finishes that project past the structural face.
  • Adjacent glazing or walls. If the folding run meets a fixed glass panel, a sliding door or a window head, send the relative levels and set-out so the profiles can be coordinated.

Layout and operation: what to decide before you ask for a price

Folding doors are a system of leaves, hinges and a track, so the layout has to be chosen deliberately. The decisions that change both the price and the practical result:

InputWhy it matters
Number of leaves and the master (leading) leaf positionDetermines where the door stacks when open and which side the traffic flows to.
Folding direction — inward, outward or bi-folding to both sidesInward stacks take internal floor space; outward stacks need a clear external landing.
Stack side and whether the stack parks inside or outside the openingAffects clear passage width, furniture layout and any external paving line.
Threshold type — flush, low profile or raisedTies directly to the finished floor level and to drainage at an external threshold.
Sill and drainage arrangementExternal openings need a drainage strategy for the track; confirm what your site builder will provide.
Hardware preference — handle, lock points, keyless or keyedSet out with the leaf layout, since locking positions follow the master and bottom leaves.

If you are weighing folding doors against another opening type for the same wall, compare the stack behaviour rather than the brochure photo. Glass sliding doors keep their panels in line with the wall and need no folding clearance, while a folding run gives a wider clear opening at the cost of stack space. Our glass partitions work solves a different problem — zoning an interior without a door at all.

Glass, frame and finish selections

These are the specification choices we will confirm with you in writing. State your preference where you have one; where you do not, tell us the room type and location and we will propose options.

  • Glass build — single or double glazed, clear, low-iron, tinted, frosted or patterned, and any safety glazing requirement for the position (shower areas, low-level glazing, doors in traffic routes).
  • Frame material and colour — aluminium frame finish, anodised or powder-coated colour, and whether the internal face should match a different finish from the external face.
  • Profile style — slim sightline or standard profile, and the mullion rhythm if the run is being read against other joinery on the project.
  • Finish continuity with other joinery. If the folding doors are part of a wider package, we can carry the same finish across related pieces such as Santerson Wood Veneer Folding Doors or the classic range, so the folding doors, cabinetry and wall panelling read as one set.

Project documents that speed everything up

The enquiry moves fastest when we receive:

1. Room-by-room door schedule — opening number, width, height, quantity, folding direction, stack side.

2. Plans and elevations at the openings, marked with the finished floor levels and ceiling or bulkhead lines.

3. Sections through the threshold where an external opening meets paving or a deck.

4. Interior finishes schedule — flooring build-up, wall finish thickness, ceiling detail at the head.

5. Site photographs of the existing openings, including a scale reference in frame.

6. Project location, delivery address and the installation arrangement — who is fixing the frames on site.

A schedule without drawings still lets us price a first pass; drawings without a schedule usually generate questions. Sending both together is what removes the second round of correspondence.

Where we need to check with you before production

We will not lock a specification on assumptions. Before manufacturing we re-confirm the recorded dimensions against your drawings, the glass build for each position, the hardware set, and the packing and delivery plan for the site. For projects abroad, tell us the port or site address early so the freight and packaging approach can be planned around the door sizes rather than fitted to them afterwards.

If your project also needs the surrounding fit-out — cabinetry, wall panelling, doors and other interior fixtures from the same supplier — it is worth sending the whole joinery package together. Coordinated openings across one order avoid the situation where the folding door profile and the adjacent panelling are specified by different parties and never meet cleanly on site.

Send your opening sizes, a marked-up plan and the layout decisions above, and we can return a specification and quotation built around your actual openings. For the wider folding range, see Classic Folding Doors, and contact SANTERSON with your project location and drawings to start the specification.