Joinery is frequently the line item that arrives late on a villa or apartment programme. Wardrobes sit between three trades — framing, flooring and electrical — and any wardrobe whose size, glass type or opening direction has not been fixed will hold up the rooms around it. Aluminum frame glass wardrobes can be brought into a whole-project materials schedule without that friction, provided they are specified on the same terms as every other long-lead fixture: exact dimensions, a named finish, a defined internal layout and a stated interface with the floor, wall and ceiling.

The wardrobe range SANTERSON lists under built-in furniture is the worked example below. Its product pages state made-to-measure sizing, material and finish options and a layout tailored to the project; every dimension, finish and specification still has to be confirmed per project before anything goes into production.

Why this wardrobe type behaves like an interior fixture

Aluminium-framed glass fronts are built from a frame profile, an infill panel and hardware — hinges, slides or a sliding gear set. That is the same construction logic as custom built-in kitchen cabinets, which is why both belong to interior fixtures and built-in furniture rather than to loose furniture on a bill of quantities. Loose furniture can be substituted at short notice. Framed glass wardrobes cannot: the carcass dimensions are taken from the finished room, and the glass colour has to match the glazing used elsewhere in the same unit.

Two consequences follow for procurement. First, wardrobe schedules have to be frozen before floor finishes are laid, because a made-to-measure carcass is dimensioned against the completed surface. Second, the front finish is a design decision that travels — it reads against engineered wood flooring, beside bathroom glazing and under the ceiling line — so it should be signed off in the same meeting as those finishes, not in a joinery-only review.

Where wardrobes belong in the schedule structure

A materials schedule that groups purchases by supplier is easier to manage than one grouped by room. For framed glass wardrobes, four columns do most of the work:

  • Reference and location. One line per wardrobe run, keyed to the room number on the drawing set, with the elevation reference so site can check the opening against the right sheet.
  • Specification status. Whether dimensions have been re-taken on site, whether the glass and frame finish are approved samples or still provisional.
  • Interface notes. Skirting treatment, floor build-up height, ceiling junction, and whether a light rail needs power at the carcass head.
  • Release date. The date the order is placed, working backwards from the installation window rather than forwards from the design stage.

Grouping wardrobes with other built-in items — kitchen cabinetry, vanity units, shelving and panelling — lets one package be released, shipped and installed together. That matters on multi-unit projects, where a single joinery container is easier to track than three separate consignments.

Reading the collection before you schedule it

The wardrobe range is organised by front type, and that structure maps directly onto how a schedule should be written. Framed glass variants sit in their own group: clear glass aluminium frame wardrobes, and frosted fronts for bedrooms where reflections are unwanted. Glass doors in sliding and hinged configurations, corner runs and walk-in layouts are listed separately, so the same bedroom can be scheduled with one front finish and two different door mechanics without inventing a new product.

When you copy a line from the catalogue into a schedule, keep the collection name as the reference and put the variable decisions in the specification column. The catalogue page defines what the item is; the project document defines what will actually be built. Mixing those two up is how schedules end up with entries that no supplier can price.

Sequencing: four gates a wardrobe line has to clear

Gate one — design freeze. Fix the front finish and door mechanic while other finishes are still open. Aluminium frame colour and glass tint should be approved alongside joinery, glazing and ironmongery, so a single approval sheet covers all of them.

Gate two — site verification. Made-to-measure sizing means the opening governs. Take dimensions after floor finishes, wall linings and ceiling set-out are complete, and record out-of-plumb conditions rather than assuming the drawing set is right. Any deviation found here changes the carcass, not just the trim.

Gate three — production release. Only release once dimensions, finish, internal layout and hardware are all confirmed in writing. Internal layout is where projects lose time: hanging heights, drawer stacks, shelf spacing and any lighting provision should appear on the same approval sheet as the front elevation.

Gate four — delivery and installation window. Built-in wardrobes are usually one of the last items in before handover, but they need a clear path to the room. Confirm lift and corridor access, storage location, and which trade carries the snag list for glass inspection after fitting.

Coordination points that keep the line on programme

  • Flooring first. Engineered flooring runs under or up to a carcass depending on the detail chosen. Decide it before the floor order is placed, because reversing the sequence later means cutting finished boards.
  • Electrical second. Interior lighting, a mirrored front with its own circuit, or a power point inside a dressing run all need cable pulled before the carcass closes. Put wardrobe lighting on the electrical drawing, not only in a joinery note.
  • One finish board. Show the wardrobe front against flooring, wall panelling and bathroom glazing on a single board. Tinted glass shifts colour with light, and a sample judged alone rarely matches what it looks like installed.
  • Consistent naming. Use one reference for each wardrobe across the materials schedule, the shop drawings and the delivery paperwork. Different names in different documents is a frequent cause of wrong-glass deliveries.

Working with a single supplier across the package

SANTERSON supplies furniture and building materials from one base, with custom and OEM work covering bespoke sizes, finishes and layouts, plus logistics, door-to-door delivery and installation support. For a wardrobe line inside a larger schedule, that structure has a practical benefit: the same team is pricing the wardrobes, the cabinetry, the flooring and the wall finishes, so interface questions have one owner instead of three. It also means the wardrobe specification can be checked against what was actually supplied for the rest of the unit — frame colour against ironmongery, glass tint against shower screens, carcass decoration against doors.

Scope on services such as design coordination, freight and after-sales support is described on the site's service pages; treat those descriptions as the starting point for a project conversation and confirm what applies to your units, in your market, before it appears in a contract document.

Checklist before the schedule goes out

  • Every wardrobe line has a room reference and an elevation reference.
  • Front type, frame finish and glass tint are named, not left as "to be advised".
  • Internal layout is drawn, with hanging, drawer and shelf dimensions.
  • Site-verified dimensions replace drawing dimensions before release.
  • Flooring sequence and electrical provision are recorded as interface notes.
  • Release dates work backwards from the installation window.

Wardrobes stop being a programme risk when they are specified like fixtures rather than furniture. Once the aluminium frame glass wardrobe lines carry verified dimensions, a named finish and clear interface notes, they can sit in a whole-project materials schedule alongside cabinetry, flooring and wall finishes — released once, delivered together, and fitted without holding up the rooms around them.

Send your room drawings and finish preferences to SANTERSON for a project-specific wardrobe specification. Phone / WhatsApp: +86-13928214007 (PHILLIP) · Email: santerson@qq.com