Partition sliding systems are one of the few built-in elements in a villa or apartment that have to do three jobs at once: divide space, store things, and look like part of the wall when they are closed. Because they are made to measure, almost everything about them is decided before production starts — and most of those decisions are locked in once the panels leave the factory. The conversation you have with the manufacturer matters more than the catalogue page.

Our Santerson Partition Sliding Systems are built for residential wall system projects, with finish, layout and dimensions specified per project. Below is the practical list of items we ask buyers, designers and builders to settle during enquiry, so that a quotation matches what actually arrives on site.

Send more than a room length. For each opening we need the clear width and height at several points along the run, the finished floor level, and whether the ceiling is level or set out with a fall for drainage or lighting. Sliding panels ride on a track, so any variation in the floor or head runs straight into the reveal at the top of the panel. We deal with it either by scribing the panel to the wall or by setting out a deliberate shadow gap — but only if the site levels are known before production.

  • Clear opening width and height — measured to the finished surfaces, not the structural shell.
  • Panel stack zone — where the panels park when open, and what sits behind that zone (a door swing, a radiator, a wardrobe return).
  • Head and jamb detail — exposed track, recessed track into a bulkhead, or face-fixed to an existing wall.
  • Threshold decision — floor track or ceiling-hung. Floor tracks collect debris in bathrooms and laundry areas; top-hung systems need a structure above that can carry the panel weight.

Tell us what you want the wall to do on a normal weekday, not only when guests arrive. A single bi-parting pair behaves very differently from four or six panels that all stack to one side, and from a system where half the panels are fixed and only two move.

  • Panel count and stacking direction — single-side stack, centre bi-parting, or panels split both ways.
  • Fixed versus moving panels — fixed bays are cheaper and stiffer; specify them where you never intend to open the wall.
  • Panel width — wider panels look cleaner but need stronger hardware and more clearance to operate comfortably one-handed.
  • Return ends — whether the last panel returns into a perpendicular wall, which changes both the track and the finish detail.

The face is where the system either disappears into the joinery or becomes a design feature. We produce these systems to the same specification discipline as our wider wall ranges, so you can carry a finish across the partition, the wardrobe fronts and the surrounding panelling.

  • Timber and veneer faces — matched to on-site cabinetry by sample; grain direction and panel-to-panel matching should be agreed before production.
  • Textured faces — our Santerson Textured Sliding Panels suit a wall you want to read as texture rather than as a flat surface.
  • Painted and laminated faces — practical for hallways and children's areas; specify scrub resistance and edge treatment, since panel edges take the knocks.
  • Integrated detailing — grooves, fluting, inlay lines or a concealed handle profile. Each of these has to be drawn, because it cannot be added after the panel is pressed.

Where a partition has to keep light in a room while still separating it — a study off a living room, a dressing area off a bedroom — specify the glazing at enquiry stage, not at the shop-drawing stage. Our Santerson Glass Sliding Panels are configured per project, and glass type changes both the frame build and the hardware loading.

  • Glass type and interlayer — clear, reeded, fluted, frosted or tinted; safety grade to be confirmed for the location and the users of the space.
  • Frame profile around the glass — slim metal, timber-matched, or a full-height butt-joint detail where structure allows.
  • Vision versus privacy — where glazing sits relative to the bed, bathroom or entry affects both opacity and cleaning access.
  • Cleaning and access — double-glazed or recessed panels need a stated method for cleaning the faces that face each other.

A sliding partition is a moving element, so its acoustic behaviour depends as much on the seal and the track as on the panel itself. If you need separation between two spaces — a home office off a living area, a guest suite within a larger floor plate — say so at the start, because it drives panel build, perimeter sealing and the stack detail. Our Santerson Acoustic Sliding Panels are configured for these situations, and the acoustic performance of the delivered configuration should be confirmed against your project requirement rather than assumed from a brochure figure.

Practical points to settle: whether panels overlap at the meeting stile, whether there is a perimeter seal to floor, head and jambs, and whether services run inside the cavity. A partition that carries pipework or cabling needs that coordination drawn before the panel build is fixed.

  • Track and runner quality — ask what the runners are, whether they are serviceable in place, and how the panel is removed for maintenance.
  • Handles or edge pulls — recessed pulls keep the face clean; surface handles are easier for children and older users to grip.
  • Soft-close and locking — specify per opening: not every panel needs a lock, but a bathroom or dressing partition usually does.
  • Operating force and panel height — full-height panels in a wheelchair-accessible route should be set out so the handle zone and the effort required work for all users.

Partitions rarely stand alone. Where the sliding wall also has to store things, we configure it as part of an integrated wall — see Santerson Sliding Storage Panels — with shelving, hanging zones or a concealed desk behind the panel face. Where it meets other finishes, decide early how the partition relates to skirting, cornice, flooring and adjacent Wall Panel Systems, so that junctions are drawn rather than patched on site.

Partition systems are late-trade items but early-decision items. Settle the specification before wet trades and floor finishes are finalised, then let us re-confirm dimensions against the completed room before production — a second site measure after flooring and ceiling linings are in place is standard practice and prevents most snags.

For international projects we handle the freight side as part of Turnkey Solutions: packaging sized for panel transport, container loading planned with the rest of the fit-out, customs paperwork, and delivery to site. Panels should arrive after the room they belong to is finished, so tell us your sequence, not just your budget.

  • Shop drawings — elevations of every opening, with panel numbering, stack zones and track sections.
  • Finish schedule — physical samples signed off, referenced by panel number, not just a colour name.
  • Hardware schedule — track, runners, handles, locks and soft-close units listed per opening.
  • Interface details — head, jamb, floor and return conditions, agreed with the builder or site foreman.
  • Installation responsibility — who sets out, who fixes, who adjusts after handover. We provide installation support and follow-up on delivered projects; the split of duties should be written into the order.

If you send these six items with your enquiry, we can usually come back with a meaningful quotation instead of a range: (1) room drawings or measured dimensions at finished level; (2) what the wall must do day to day; (3) panel face preference with a reference image or sample; (4) glazing and acoustic requirement, if any; (5) hardware and accessibility needs; (6) your site programme and delivery address. The more of these you can attach, the closer the first number will be to the final one.

Because these systems are made to measure, the buyers who get the smoothest result are the ones who treat the specification meeting as part of the design stage rather than as a purchasing formality. Send us your drawings and finish references at Contact Us, and we will confirm dimensions, hardware and configuration for each opening before production begins.