Flush interior doors look simple on a drawing. A clean, flat leaf sits level with the wall, no raised mouldings, no visible frame shadow — and that is exactly why they are easy to get wrong once they reach site. If you are buying them for a villa, apartment or hospitality fit-out, OEM sourcing is usually the route that keeps the joinery, the wall finish and the hardware in one controlled package. This article walks through how that process works for Santerson Flush Interior Doors, from the first drawing to the delivered crate.

What "OEM sourcing" actually means here

OEM (original equipment manufacturer) supply means the doors are produced to your specification rather than picked from a stock catalogue. For flush interior doors, that covers the leaf size and thickness, the core construction, the surface finish, the edge detail, the hinge preparation and the cut-outs for locks, closers or access hardware. The same principle applies across the wider door range — flush hinged doors for standard room entrances and flush sliding doors where a swing leaf would eat into floor area.

SANTERSON is a China-based manufacturer and one-stop supplier of furniture and building materials, operating since 2008 and serving project customers in hospitality, villas and offices. That one-stop scope matters for OEM door work: the same factory that produces the door leaves also produces wall panelling, cabinetry and built-in joinery, so a flush door that has to disappear into a paneled wall can be specified against the same material batch and the same finish schedule instead of being reconciled between two unrelated suppliers.

Stage 1 — Send drawings, not just a door schedule

The first exchange should be drawings. A door schedule that lists only "813 x 1981 mm" is not enough for flush work, because the visible result depends on how the leaf meets the wall: whether the frame is recessed or sits proud, whether architraves are omitted entirely, and how the reveal is closed at the plasterboard edge. Send plans, elevations and, if you have them, a detail section through the door head and jamb.

What we need back from you at this stage:

  • Opening sizes for every leaf, with the floor finish level noted — flush leaves are usually specified as made-to-measure to suit the finished floor, not the structural slab.
  • The wall build-up on both sides: plasterboard, masonry, timber stud or a steel-frame partition. This determines the frame and lining detail.
  • The finish you want on the leaf — painted, laminate, veneer or matched to adjacent panelling — and where that finish is applied in your schedule.
  • Hardware intent: concealed or surface hinges, whether a closer is required, lock or privacy set, and any access-control cut-out.
  • Quantity by size, plus the storey or unit each leaf belongs to, so the schedule can be crate-labelled.

The product pages for this collection describe exactly that configuration model — made-to-measure sizing, material and finish options, and a layout tailored to the project. Dimensions and selected specifications are confirmed per project rather than assumed from a standard size.

Stage 2 — Specification and quotation

Once the drawings are read, we return a specification sheet and a quotation. This is where OEM decisions become concrete and where most buyer-side risk is removed. Read it line by line before approving production:

  • Leaf size and thickness for each code, with tolerance noted.
  • Core and substrate as specified for the use — a guest-room leaf and a back-of-house service leaf do not need the same build.
  • Finish system and the reference you approved. Where a flush door must sit in a paneled wall, the panel and leaf finishes should carry the same reference on the sheet.
  • Frame, lining and architrave treatment — including where the design calls for no architrave at all.
  • Prepared hardware positions, and whether mortising is done in the factory or on site by your installer.

Our custom & OEM service covers bespoke finishes and textures, prototyping where a finish needs to be seen before it is repeated across a whole floor, flexible minimum order quantities, and brand marking such as engraving or logos on leaf edges and packaging. For buyers who resell under their own label — joinery contractors, developer-facing merchants, design-build firms — that last point turns OEM furniture manufacturing into a delivery you can hand to your own client without re-branding at the dock.

Stage 3 — Production and the finish sample

Production starts only after you sign off the specification. For projects with a repeated finish across many leaves, ask for a first-article sample: one leaf in the approved finish, photographed or shipped, before the batch runs. That single step prevents the classic flush-door complaint — twenty identical leaves arriving where the sheen reads slightly warmer or cooler than the wall they were designed to vanish into.

Quality control during production covers panel flatness, edge condition, finish coverage and the accuracy of hardware preparation against the approved schedule. Door codes are checked against the project package they belong to — joinery, wall finishes and fixtures included — rather than tracked as an isolated order.

Stage 4 — Packing, freight and arrival

Flush leaves are the items most likely to be damaged in transit if packing is treated as an afterthought, because a flat surface shows every chip. On our projects doors ship alongside cabinetry, flooring, lighting and wall finishes, so they are packed edge-supported and separated, with corner protection, then loaded against the container plan for the rest of the fit-out package. Our logistics and door-to-door delivery service covers freight forwarding by sea, air and rail, commercial invoices, packing lists, certificates of origin and other customs paperwork, container loading and shipment tracking.

Two practical points for buyers:

  • Confirm the delivery address and the unloading arrangement before the container moves. A flush door crate that cannot be manhandled up a stairwell needs a different packing configuration and a tail-lift on arrival.
  • Check import terms, duties and Incoterms for your country on the order itself. Transit time, insurance and delivery scope are agreed case by case, so treat the paperwork as part of the specification rather than something settled at the port.

Stage 5 — Installation handover and after-sales

The OEM package is not finished at the delivery note. Our installation and after-sales support covers on-site installation, inspection and snag lists, warranty coverage, spare parts and replacement, and ongoing maintenance. For flush doors specifically, the snag list should be checked with a straightedge along the leaf-to-wall line under raking light — that is where a poorly set frame shows up, and it is far cheaper to correct while paint and finishes are still being touched up.

Order spare leaves against the same code and finish reference at the time of the original order if your project will be handed over in phases. A replacement leaf matched months later, from a different material batch, is where colour drift becomes visible.

A worked example: specifying one villa floor

Take a typical villa floor where the design language calls for concealed openings. The owner's suite and two secondary bedrooms use flush hinged leaves; the laundry and study entries use sliding leaves because swing clearance would clash with built-in storage; and the store cupboard disappears into a paneled wall using integrated door and panelling detailing. All three sit on one schedule, under one finish reference, produced by one factory and arriving in one shipment.

Compare that with sourcing each element separately: three quotations, three finish references, three delivery windows, and a snag list that nobody owns. The OEM route moves the coordination cost from your site team to the production schedule, where sizes are checked against drawings before anything is cut.

What to send us to start

If you are scoping flush interior doors for a project, the fastest way to a real price is a single email with: the door schedule or room-by-room sizes, plans and elevations, your finish preference, hardware intent, quantities by size, and the destination port or site address. With those in hand we can return a specification sheet, confirm what needs a first-article sample, and quote the doors as part of the same package as your joinery, wall finishes and fixtures.

SANTERSON has been manufacturing furniture and building materials for international projects since 2008, with offices in China, Vietnam, Singapore and South Africa. Send your drawings and schedule to our team and we will come back with a specification you can check line by line before production begins.