A single line on a drawing — "decorative screen, lobby partition" — is where most reception screens go wrong. The panel arrives too small for the opening, the pattern reads as flat decoration instead of light and shadow, or the finish clashes with the brass and stone already specified in the schedule. Below is the enquiry route we use at SANTERSON to turn that one line into a custom laser cut metal screen that fits the opening, matches the interior scheme and arrives on site ready to install.
Step 1: Send the drawing you already have
You do not need a finished detail. A marked-up plan elevation, a PDF section, a sketch with dimensions written on it, or a photograph of the wall with measurements is enough to start an enquiry. What we need from your side:
- The opening — clear width and floor-to-ceiling height, plus whether the screen sits on a finished floor or is set into a reveal.
- Panel layout — one fixed feature wall, or a multi-panel run across a wider lobby. Panel count is adjustable to suit the span and the site's lifting access.
- Pattern reference — your own vector artwork, or a mood image you want adapted. We cut to your drawing or to your reference image.
- Application — hotel reception, clubhouse, villa entrance, office lobby or commercial fit-out. This drives frame and fixing choices.
Step 2: We quote a specification, not a catalogue item
Nothing in this range is stocked to a fixed size. The quotation reflects what your project needs, and four variables are yours to set:
- Material — stainless steel for high-traffic hospitality interiors; aluminium for lighter decorative profiles.
- Finish — brushed gold, matte black and antique bronze are the finishes we work with most often on reception screens.
- Thickness and size — set to panel height and to how open or solid the pattern must read at viewing distance.
- Frame style — framed, edge-return or full-height, matched to the surrounding wall finish.
Two references from our own range show how far the specification can move. A gold stainless steel laser cut decorative screen partition is usually specified as a mirror-finish accent behind a reception desk, while an antique bronze screen in a multi-panel configuration is built for wide feature walls where a single panel would be unmanageable on site.
Step 3: Confirm the pattern before cutting starts
Precision laser cutting is what separates these screens from printed or etched panels. The hollow cut-outs let light pass through, so the screen casts a shadow pattern onto the floor and wall behind it — that effect is what you are specifying, not just the front face. Because the result depends on open area, we review pattern density and viewing distance with you before production and confirm the drawing with your team first. Approval at this stage is what stops the workshop cutting a panel to the wrong detail.
Step 4: Production, packing and delivery
Once the drawing is approved, panels are cut, finished and framed in our own factory. As part of our custom and OEM service, finishes and textures are matched to an existing joinery or metalwork schedule rather than offered as a standalone colour choice.
Freight is arranged through our logistics and door-to-door delivery service, covering sea, air and rail with the export paperwork handled on our side. Give us your port or site address at enquiry stage and we will quote delivered, so the screen lands where the installer is waiting rather than at a terminal.
Step 5: Installation and what happens afterwards
These screens act as both space divider and decorative feature, so the fixing detail matters as much as the pattern. We provide installation and after-sales support, including on-site guidance, inspection alongside your contractor, and spare panels or replacement parts if a panel is damaged during the wider fit-out.
What to put in your enquiry
Send the following and you will get a usable quotation back rather than a round of questions:
- Marked-up elevation or section with the width and height of the opening
- Pattern artwork or reference image, and whether the pattern must repeat across panels
- Preferred material and finish, or the finishes already used in the scheme
- Panel quantity and delivery address or port
- Project type — hotel, resort, clubhouse, villa or office
SANTERSON has been making furniture and building materials since 2008 for hospitality, villa and office projects. If your screen is already drawn, send the detail; if it is still an image on a mood board, send that — either is enough to open an enquiry.
Send your drawing and dimensions to SANTERSON for a quotation on a custom laser cut metal screen for your reception or lobby.