A corner wardrobe with hinged doors rarely fails on the shop floor. It fails at the junction: a crate that cannot pass the site lift, a door handed to the wrong side, a wall that was never packed flat, or an installation crew booked for a date the freight has not reached. Because hinged door corner wardrobes are made to measure and assembled in place, delivery planning and installation planning have to be drawn up together, long before production starts. The steps below follow the sequence we use on residential and villa projects: lock the opening, split the shipment by room, fix the handover date backwards from site readiness, and keep one written record that both the freight desk and the fitters work from.

Start with the opening, not the order date

Corner units are sized to two walls meeting at an angle, so every downstream decision depends on dimensions that only a site survey can confirm. Before you commit to a production slot, have the following recorded and signed off:

  • Both wall runs measured at floor, mid-height and ceiling level, plus the actual corner angle rather than an assumed right angle.
  • Floor finish allowance — how much height the final flooring adds, and whether the carcass sits on the finished floor or is packed under it.
  • Skirting, architrave, radiator, door reveal and light switch positions that will be fitted after the wardrobe, and therefore must be set out around it.
  • Which wall the doors hang from and which way each leaf swings, checked against bed, door and bathroom traffic lines.
  • Services: sockets, spur outlets, downlights and any pipe or duct that must be chased before the carcass is closed in.

This list is also the specification we need to see. Our interior design services cover space layout planning, product specification and drawing coordination, so where a client sends drawings rather than measurements we can review them for clearance and door-swing conflicts before anything is cut.

Match the door type to the access route as well as the room

Hinged doors give a full, unobstructed opening onto the corner bay, which is why they suit bedrooms and dressing rooms where the frontage can be stood clear. The trade-off is real: a leaf needs a swing arc in front of it. If the room cannot give that arc, an sliding door corner wardrobe or an open corner unit is usually the better answer, and deciding that now avoids a change order after the carcass is machined.

The same frontage logic applies to the layout shape. An L-shaped run turns one corner; a U-shaped run closes two, which means more sections, more fixings and a longer install. Where the plan calls for L shaped corner wardrobes or U shaped corner wardrobes, count the sections and write the assembly order into the drawing, because it determines both the crate split and the number of fitter-days.

Split the shipment by room, not by purchase order

One wardrobe for three bedrooms arrives as one consignment but has to land in three rooms. We pack each unit as a labelled group — carcass panels, door leaves, shelves and drawers, hinges and fixings, decorative trims — with the room reference on every bundle rather than only on the outer crate. That single habit removes most of the wasted labour on site: fitters are not opening six cartons to build one wardrobe while three other rooms stay empty.

Three practical checks before the container or pallet is booked:

  • Longest single panel versus the lift, stair turn and doorway on site. A full-height side panel that clears the loading dock but not the second-floor landing has to be split into joined sections at the drawing stage.
  • Door leaves packed upright and protected separately from carcass panels; edges and finish faces are the parts most often damaged in transit.
  • Hardware kits bagged by unit with a spare allowance for hinges, shelf pins and cam fixings, so a lost bag does not stop an install day.

Our logistics and door-to-door delivery service covers freight forwarding by sea, air and rail, packaging and container loading planning, customs documentation and shipment tracking. For a multi-unit wardrobe package we plan the crate sizes against the site access route you send us, not only against the factory loading plan.

Fix the handover date backwards from site readiness

Built-in joinery is a follow-on trade. It can only be fitted once the room is wet-work free, floors are laid or protected, and electrical first-fix is complete and tested. Work the programme backwards:

  1. Site completion date for the room — fixed with the main contractor.
  2. Installation window booked against that date, allowing one clear day per bedroom run plus a snag round.
  3. Delivery set to arrive at least two working days before fitters start, so goods can be checked and moved to the correct rooms.
  4. Transit time and customs clearance counted back from the delivery date.
  5. Production start counted back from the dispatch date, with the confirmed survey drawings already in hand.

Where a project is being furnished as a package — wardrobes together with built-in furniture, cabinetry, doors and finishes — one shared programme beats separate schedules per supplier. The turnkey solutions we provide for villa and hospitality projects run consultation, design and planning, production, logistics, installation and after-sales on a single track, which is what keeps joinery from becoming the item everyone waits for.

Give the installers the same document you gave the freight desk

The drawing that drives production should be the drawing the fitters carry: section numbers, elevation with door handing marked, fixing method, pack list and assembly sequence. Before signing off a specification, confirm the dimensions and finish selections for each unit — made-to-measure sizing, material and finish options and a layout tailored to the space are all set per project, so nothing on site should be improvised.

On arrival we ask the site contact to check three things the same day: carton count against the packing list, no transit damage to door faces and edges, and hardware bags present. Anything missing is reported while the goods are still unpacked, which is far cheaper than discovering it on install morning.

Plan the snag round into the programme

Hinged doors need adjusting after the building has settled around them: hinges set so leaves hang parallel and close without touching, drawer runners checked under load, integrated lighting and sockets re-tested. Our installation and after-sales support covers on-site installation, inspection and snagging, spare parts and ongoing maintenance, so the final part of the install window is reserved for adjustment rather than left to a separate visit.

If you are planning wardrobes for a villa or apartment package, send us the room drawings with wall runs, floor finish allowance and door-swing clearances marked. We will confirm the layout, pack split and delivery sequence against your site programme before production starts.