A floating modular system rarely fails on the shop floor. It fails in the approval chain: a wall layout signed off by one party, questioned by another, and corrected after the boards have been cut. Because Santerson Floating Modular Systems are made to measure for each project — with dimensions, layout, materials and finishes specified per space — every change has a cost in time as well as material. The plan below shows how we route approvals so the people who actually sign are the people who build, install and own the result.

Why wall-mounted joinery needs a different approval path

With loose furniture, an approval covers one item: a sofa, a chair, a table. A floating modular system is an assembly fixed to the structure of the building, and its neighbours in the wall are not ours alone. Concealed wiring, sockets, data points, light positions, skirting lines and floor levels all sit inside the same envelope. That means the approval package has to travel beyond the interior designer to the trades who prepare the wall.

Our workflow on these systems follows the stages we run on every project — consultation, design and planning, production, logistics, installation and after-sales. Approvals belong at the boundary of each stage, not inside it. When an approval is asked for while work is still in progress, the answer arrives too late to act on.

Who signs what: a responsibility map

Before any drawing goes out for signature, we agree a one-page responsibility map with the client. Five roles typically appear on a residential or hospitality fit-out:

  • Client or owner's representative — approves appearance, budget impact and handover. One named person, with authority to decide.
  • Interior designer — approves layout, proportions, finish combinations and how the system reads in the room.
  • Architect or structural engineer — confirms that wall fixings, loads and any change to the wall build-up are acceptable.
  • Main contractor or site foreman — confirms setting-out dimensions, completed floor and wall levels, and access for installation.
  • Electrical and services subcontractor — confirms the position of sockets, wiring routes and any lighting built into the joinery.

The map records one decision owner per question. Where two parties both think they own a dimension, that is the first thing to resolve — it is where rework starts.

Five approval gates, in order

Gate 1 — Brief and scope. Room by room: which walls are in scope, what the system must store or display, and who is using it. We record the use case plainly (media storage, books and display, crockery, linen, retail stock) because it drives door type, shelf depth and hardware before anyone discusses colour.

Gate 2 — Setting-out survey. Dimensions taken on site after the wall build-up, floor finishes and plasterwork are complete, not from design drawings alone. Floating systems hang off finished levels; a 15 mm difference in a finished floor line moves every bracket. The signed survey becomes the production dimension set.

Gate 3 — Layout and elevation approval. Elevations of each wall, with heights, module widths, open and closed sections marked. Our interior design service covers space layout planning, furniture layouts and 3D visual renderings at exactly this point, so the client is approving a picture of the finished wall rather than interpreting line work.

Gate 4 — Materials, finishes and services. Sample references for board, veneer or lacquer, edge treatment, hardware, plus the positions of sockets, switches and any integrated lighting. Lighting is approved with the electrician present in the exchange: cable routes and driver access have to be agreed together, not in two separate threads.

Gate 5 — Pre-production confirmation. One consolidated pack — survey dimensions, signed elevations, finish schedule, services positions — released for signature before cutting starts. This is the last gate where a change is cheap.

What each approval pack should contain

A pack that gets returned signed on the first pass usually has six items and nothing more:

  • Elevations with overall and module dimensions, plus the fixed hanging line height.
  • The survey sheet showing finished levels used for those dimensions.
  • A finish schedule naming each surface, edge and hardware item.
  • A services overlay marking sockets, data points and lighting positions.
  • Fixing notes for the wall construction on site, for the engineer or contractor to confirm.
  • An open-points list with a name and a date against every unresolved item.

Keep comments in one document rather than in email chains. When a designer's note and a contractor's note sit in different threads, both get implemented, and the wall receives neither.

Configuration decisions to settle before Gate 3

Floating systems are configured, not catalogued. Three choices change the approval route itself:

  • Load and wall type. A wall carrying books and glass behaves differently from one carrying display pieces alone. Where the substrate is stud partition, block or masonry, the fixing detail differs — and that detail needs the engineer's signature.
  • Open against closed proportion. Closed units hide storage but add doors, hinges and alignment checks at handover. If a project has a tight snag list tolerance, agree door gaps and opening direction now.
  • Integrated lighting. Any lit shelf needs driver positions that stay reachable after installation, plus an agreed switching arrangement.

Related collections in the same range help set expectations early: Santerson Floating Modular Shelves for display-led walls, and Santerson Closed Modular Units where storage needs to disappear behind doors. Reviewing two or three configurations side by side at Gate 1 usually removes a round of revisions later.

Change control after production starts

Changes do happen, so the plan should say what happens to them. We log every request against the signed pack and give the client a written answer covering three things: whether the affected components have already entered production, what the revised lead time is, and what the change costs. That converts an argument into a decision with known consequences.

Two rules keep this workable. First, no verbal instructions on site — a note to an installer still has to reach the project coordinator in writing. Second, one channel only: all approvals come back through the named client representative, so we never hold two conflicting versions of the same elevation.

Handover approvals and after-sales

At installation, approval shifts from paper to the wall itself. The walkthrough covers alignment of modules, door and drawer operation, finish condition after handling in transit, and confirmation that services positions match the approved overlay. Any item not accepted goes on a snag list with an owner and a target date, and we close it through our installation and after-sales support.

Handover is also when the client receives the as-built record: final dimensions, finish references, hardware specification and services positions. That file is what makes a later extension, relocation or spare-part request a quick job rather than a new survey.

Practical habits that save a production cycle

  • Name one decision maker per room, and confirm they have budget authority before Gate 3.
  • Survey after finished levels are in place — never produce from design-stage dimensions alone.
  • Send finish samples with the layout pack, not separately, so appearance is approved once.
  • Put the electrician in the same approval loop as the joinery layout.
  • Date every open point; an undated open point is an approval that has not started.

Getting started on your project

Send us the room drawings, the wall constructions and a short note on how each wall will be used, and we will return a setting-out survey sheet, indicative elevations and an approval schedule showing exactly who needs to sign at each gate. As a one-stop furniture and building materials supplier, we carry that pack through production, logistics and door-to-door delivery and installation, with the same coordinator holding the record from brief to handover.

Tell us which walls are in scope and the date your finished levels will be complete — we will build the approval schedule around it.