A wall-mounted bar unit looks simple on a drawing: a run of cabinets floating above the floor, glass shelving, maybe a wine rack and some concealed lighting. In practice it is one of the tighter joinery items in a villa or apartment fit-out, because everything about it has to be resolved before production starts — the fixing method, the service runs behind it, the exact height at which the countertop sits, and how the finish ties into the kitchen cabinetry beside it. That is why we ask buyers to send a proper enquiry rather than a one-line "price please". This guide walks through exactly what to send when you want a quotation for our Santerson Wall Mounted Bar Units, and what you get back.

First, confirm that a wall-hung unit is the right format

Our Bar Cabinets collection covers four layouts, and they solve different problems. A wall-mounted unit frees up floor area and works best along a solid wall where the load can be carried by the substrate. If the bar sits in the middle of an open-plan kitchen, an island bar unit is usually the better answer. Where the bar is part of a full-height wall of joinery, an integrated bar system keeps the appliance housings, display niches and storage in one run. For a study, media wall or pantry corner with limited width, a compact bar cabinet gives you the same function in a much smaller footprint.

If you are unsure which format fits, send us the floor plan anyway. Our team will tell you when a wall-hung unit is the wrong call, and that kind of honest feedback is worth more than a fast price.

What the product actually is: Santerson Wall Mounted Bar Units is a made-to-measure item in our Built-in furniture / Bar Cabinets collection. Dimensions, materials, finishes and internal layout are specified per project — there is no single catalogue size or fixed price to quote from.

What to send in your enquiry

The more complete the first message, the fewer rounds of questions we need before we can price the job. Here is the information that lets us move straight to a quotation.

  • Location and substrate. Tell us the country or city, and what the bar will be fixed to — masonry, stud wall with noggin blocking, or an existing joinery run. Wall-hung units depend on the wall behind them, and this determines both the fixing detail and whether reinforcement is needed.
  • Overall width and height of the intended run, plus the finished floor level and where the power and water services sit. If you have a marked-up plan or elevation, attach it; a sketch with dimensions is enough to start.
  • Layout intent. Open shelving for glassware, closed cabinets for bottles, a wine rack, a fridge drawer, a sink, or a dry bar with no services. Say which you want and which you do not.
  • Countertop preference. Engineered stone, marble or another surface — and whether the top continues the material used in the adjacent kitchen.
  • Finish direction. Send a finish sample reference, a photograph of an existing kitchen, or the colour system your designer is working to (for example RAL). We work with wood, metals, engineered stone and laminates, and can match an existing cabinet door.
  • Hardware and lighting. Soft-close hinges, push-to-open fronts, integrated LED in the niches or under the cabinets — list what you expect to be included so it appears in the price rather than appearing later as an extra.
  • Quantity and project type. One unit for a private villa, or repeat units across an apartment or hospitality development. Multi-unit work is quoted differently from a single piece.
  • Delivery destination and any site access limits. We arrange freight by sea, air or rail with customs paperwork and door-to-door delivery, so we need the delivery address to price the full package.

How the quotation is prepared

Once your enquiry reaches us, the process follows the same steps we use for every custom job. We review your drawings and requirements first, then come back with questions on anything that affects price — typically materials, hardware, and the fixing detail for the wall in question. After those points are settled we produce a quotation covering the unit itself and the delivery scope you asked for.

Stage What happens What we need from you
1. Brief review We read your plan, dimensions and finish references, then confirm the format is suitable. Plan or sketch, dimensions, substrate details.
2. Specification We agree materials, finishes, hardware, lighting and internal layout, and confirm the fixing method for your wall. Answers to our queries; approval of any alternative we suggest.
3. Quotation Priced specification, with the delivery and packaging scope you requested. Delivery address and preferred Incoterms.
4. Detail confirmation Shop drawings for sign-off before production begins. Written approval of the final drawings.
5. Production and shipment Manufacturing, packaging, container loading and freight to site. Confirmation that site preparation is complete before arrival.

For buyers who want the bar coordinated with other work rather than bought as an isolated item, we can also quote it inside a wider package — kitchen cabinetry, wardrobes, vanities, wall panelling and flooring from the same production run. Coordinating those items in one order is how the finishes actually match, and it reduces the number of separate deliveries landing on site.

Questions worth asking us directly

A few things buyers routinely leave out of an enquiry, and then discover during installation. Ask about them up front:

  • Whether your wall needs blocking or a steel backing frame before the unit can be hung, and who carries out that work.
  • How the countertop overhang is supported at the front edge, and what load the top is specified for.
  • Whether lighting transformers and any appliance housings are included in the unit or supplied separately.
  • How the units arrive — fully assembled or flat-packed — and what on-site installation support we provide.
  • What the warranty covers and how spare parts are handled after handover.

We do not publish a standard price list for these units, because the specification drives the number. Two runs of the same width can differ substantially depending on the stone, the hardware set and whether an appliance is built in. Tell us what you want and we will tell you what it costs.

Santerson Wall Mounted Bar Units, made-to-measure wall-hung bar cabinet
Santerson Wall Mounted Bar Units — configurable layout, finish and dimensions, produced to project specification.

Getting in touch

Send your drawings and requirements through our contact page, or reach us directly on WhatsApp at +86-13928214007. The more detail you include in that first message, the faster we can return a quotation you can take to your client or builder.

Preparing a villa, apartment or hospitality project and need a wall-mounted bar quoted alongside kitchen cabinetry or other built-in joinery? Send us the plan and finish references — we will come back with a specification and price rather than a guess.