A flush sliding door looks simple from the finished side: a clean panel that disappears into the wall when it is open and sits almost invisible when it is closed. That simplicity is exactly why these doors are easy to under-specify. Sliding doors in particular leave very little room for guesswork, because the opening, the pocket, the track and the finish all have to agree with each other before production starts. If you are ordering Santerson Flush Sliding Doors for a villa, hotel room or apartment package, the quality of your brief decides how smoothly the order runs.
Start with the door schedule, not the product page
Product listings show what a collection can do. Your job is to say what your project needs. Before you contact us, put together a simple door schedule — one line per opening — and send it with your enquiry. For each opening, note the room or zone, the quantity, and whether the door slides into a wall pocket or slides across a fixed face.
A schedule does not need to be a full architectural drawing set. A spreadsheet is enough. What matters is that every opening has its own row, so nothing gets averaged out or assumed.
Give dimensions the factory can actually build to
These doors are made to measure, so approximate openings cause the most rework. For each opening, provide:
- The clear structural opening width and height, plus the wall thickness.
- Whether the dimension you measured is the rough opening or the finished opening after plaster, screed or cladding.
- The finished floor level, and whether the track sits at that level or is set into it.
- How much of the panel should be exposed when the door is open, if it slides on a face rather than into a pocket.
If your drawings show more than one wall build-up — for example a masonry wall in wet areas and a framed partition elsewhere — say so. The pocket detail changes with the wall type, and telling us early avoids a second round of shop drawings.
State the finish and how it must relate to the wall
A flush door is judged by how well it disappears. So specify the finish in relation to the surrounding surface, not on its own:
- The panel finish — paint colour and sheen, veneer species and cut, laminate or lacquer — and whether it should match or deliberately contrast with the wall.
- Whether the panel is intended to be over-coated or wallpapered on site, or delivered pre-finished.
- Edge detail: shadow gap, flush trim, or a square edge that runs into the wall finish.
- Handle strategy. If you want no visible hardware, tell us — our handleless concealed approach exists for exactly this detail, and it affects the leaf construction and the pull provision.
Send finish samples or reference images where you have them. A RAL number or a paint code is useful; a photograph of the actual wall finish is more useful still.
Confirm how the door will be used, by whom, and how often
The same opening detail behaves differently in a private bedroom and in a hotel corridor. Tell us the setting: residential, hospitality, office or mixed-use. Then tell us about use — daily traffic, whether children or housekeeping carts pass through, and whether the door needs to close quietly.
For guest rooms and bathrooms, also mention acoustic expectations and privacy requirements at the brief stage rather than at handover. Where a room needs a sliding separation that can also absorb sound, our acoustic sliding panels are a different system from a residential flush sliding door, and choosing the right one early saves redesign later.
Say what else in the project must match
Doors rarely sit alone. If your flush sliding doors need to align with other joinery, say which items and where. Common cases we handle together with doors:
| If the door must match… | What to send us |
|---|---|
| A wall of cabinetry or a media wall | Finish reference, panel layout drawings, and the alignment line you want carried across (reveal, handle line or panel joint) |
| Wardrobe fronts in the same room | Wardrobe elevation, door schedule, and whether both elements are on the same delivery phase |
| An integrated storage wall with sliding fronts | The use case for the front — access to stored items or a display reveal — so the track and travel can be set correctly |
| Other openings in the same development | Your full door schedule, so panel thickness, edges and finishes stay consistent across units |
Where a whole floor or villa is being fitted out, ordering doors alongside the rest of the joinery usually keeps finishes and timing together. Our custom furniture and OEM service covers bespoke materials, finishes and textures across a package, which is how projects keep one look across doors, wardrobes and cabinetry.
Set out the delivery and installation reality
Sliding doors need a level, stable opening and a track that is set correctly before wall finishes close up. In your brief, tell us:
- Which trade builds the pocket and sets the track — ours or yours — and at what stage of site works.
- The delivery address, access route and lift or stair constraints for long panels.
- Your required on-site date, working backwards from your programme rather than forwards from today.
- Who inspects on handover, and how snags are reported.
We handle freight, packaging and container loading, and provide door-to-door delivery as part of our one-stop project service. Import terms, duties and transit arrangements are confirmed per project, so raise them in the first exchange rather than after production.
What a good brief looks like, in one view
Door schedule with one row per opening · structural and finished dimensions with wall build-ups · pocket or face-slide stated for each opening · finish references and edge detail · hardware decision made · setting and expected traffic level · items in the project that must match · site sequence, access and required on-site date. Send those seven things and shop drawings can start without a guessing round.
Check the brief before you send it
- Does every opening have its own row, with quantity and orientation marked on a plan?
- Are dimensions labelled as rough or finished?
- Is the wall type stated for each opening that has a pocket?
- Is the finish specified against the surrounding wall, not just as a colour name?
- Has someone on your side decided handle versus handleless?
- Have you named the other joinery items these doors sit next to?
- Is the required site date in writing, with the delivery address and access notes?
What happens after you send it
We review the schedule against the collection, flag any opening where the wall build-up or traffic level needs a different detail, and come back with questions on the specific rows rather than general ones. From there we confirm the specification, produce shop drawings for your sign-off, and move into production. Where the wider project is also being sourced, our interior design service can coordinate layout, material selection and production drawings so doors arrive in step with everything they have to match.
Send us your door schedule
Share your opening list, wall build-ups and finish references, and we will tell you which of our sliding and flush door details suit each opening — before anything goes into production.
Contact us to start the specification review.
Flush sliding doors reward a precise brief. The more of the above you can put in writing at the start, the fewer surprises there are on site — and the cleaner the finished wall looks when the door is closed.