Product Specification / Outdoor Furniture Procurement

A curved outdoor sofa set with a marble coffee table is one of the easiest hospitality patio pieces to specify badly. The silhouette sells the space, but the frame finish, fabric specification, stone selection and dimensional tolerances are what decide whether the set still looks right after two seasons on a pool deck. Below is the specification structure we use when buyers send drawings for our Curved Outdoor Sofa Set with Marble Coffee Table, Hospitality Patio Lounge, and the same structure works for any curved lounge group you are sourcing.

Start With the Configuration, Not the Style Reference

Most enquiries arrive as a photograph of a hotel terrace. A photograph tells you the mood but not the build. Before we quote, we need the configuration written out: how many seats in the curved sofa, how many single armchairs, whether the coffee table is one unit or a nested pair, and what sits on either side of the group. Our standard arrangement for this model is a three-seater curved sofa, two single armchairs and a marble top coffee table. Project teams frequently change that split — a four-seater curve with one armchair for a longer terrace, or two curved sofas facing each other across a lobby garden.

Write the configuration as a numbered list in your specification document, with an overall footprint dimension for the group and a clear seat count. That single change removes most of the back-and-forth later, because seat count drives frame size, cushion cut, packing volume and container loading.

Specification LineWhat to StateWhy It Matters at Production
Set compositionSofa seat count, number of armchairs, coffee table quantityFixes frame dimensions, cushion count and carton plan
Overall group footprintLength × depth of the layout, plus clearance for circulationConfirms the curve radius fits the terrace or pool deck
Seat height and depthTarget seat height, seat depth, back heightCurved seating must match adjacent lounge chairs in comfort
Coffee table top sizeDiameter or length × width, plus top thicknessStone slabs are cut to a blank; the size drives yield and cost

Frame and Finish: Specify the Coating System, Not Just "Metal"

The frame of this set carries an anti-rust powder coating. In a specification document, that phrase is not enough. State the substrate, the coating method and the colour reference, and say which surface the reference applies to — the visible curved arm caps and the underside age differently.

  • Substrate: confirm the frame material and section size for the curved arms. Rounded arms need a continuous bend; a specification that only says "round arm" invites substitutions.
  • Coating: name the finish system (powder coating) and the sheen, because a matte bronze and a gloss bronze read completely differently under pool lighting.
  • Colour reference: give a RAL or Pantone code, or send a physical sample. Screen views on a spec sheet are not colour proof.
  • Hardware and feet: note levelling feet where the patio surface is uneven — pool decks rarely sit flat.

We produce this model with custom metal colour for bulk orders, so a colour code in your document avoids a sample round that costs two weeks. If your project has a powder-coated aluminium pergola, gazebo or screen already specified, ask us to match the coating family rather than the exact code; matching across two different substrate types is where colour drift shows up.

Fabric: Write the Performance Requirements as Testable Items

This set uses outdoor-grade performance fabric. For a hospitality patio, translate that into requirements your team can actually check on a sample: cleanability, colour fastness to light, and how the fabric behaves after repeated wetting and drying. A specification line such as "outdoor fabric, dark grey" tells the factory nothing about whether the fabric is suitable for a sun-facing deck or a shaded courtyard.

In our own specification sheets we record four items for every curved outdoor lounge group: the fabric type and construction, the colour reference, whether the cushion covers are removable, and the foam density used for seat and back. Removable covers matter on hotel patios — housekeeping needs to rotate and clean them, and a fixed cover becomes a maintenance problem within a year of opening.

Custom upholstery is available on this model. If you are specifying fabric across several product lines in one project, send the same fabric code to us for the sofa, the armchairs and any outdoor sectional sofa set with marble coffee table you are also ordering. One fabric across the whole terrace reads as a designed scheme; two similar-but-not-matching fabrics read as two purchases.

Marble Top: Name the Stone, the Finish and the Edge

The coffee table is where specifications go vague fastest. "Marble top" is not a specification. Write four things:

  • Stone name and origin block: marble is quarried in bands, and two slabs of the same commercial name can look quite different. Ask for slab selection from one batch for all tables in a project.
  • Surface finish: honed or polished. On a pool deck, a high-polish surface shows water spots and reads slippery underfoot light; honed finishes are the usual choice outdoors.
  • Edge profile: eased, bullnose or mitred. A rounded sofa usually sits better with an eased or bullnose edge than a sharp arris.
  • Thickness and support: state the top thickness and how it fixes to the base, including whether a base frame is supplied with the stone.
If your project uses marble or engineered stone elsewhere — reception counters, bathroom vanities, wall cladding — send us those stone references with the furniture specification. Coordinating the coffee table top against the stone already specified for the building avoids the common case where the patio stone and the interior stone look like two different materials under daylight.

Site Conditions Belong in the Specification

A curved lounge group on a hospitality patio is exposed to conditions an indoor sofa never meets. Add a short site-conditions block to the document: exposure hours of direct sun, whether the set sits under a pergola or hardtop, distance from splashing pool water, and the finished floor level. Those four answers change fabric choice, coating specification and foot detail.

Where the terrace is partly covered, specify the two zones separately. A sofa half in sun and half in shade will age unevenly if a single fabric reference covers both positions, and that becomes a warranty conversation rather than a design decision. Our outdoor furniture for villas and resorts range includes sets built for covered loggias as well as open decks, so splitting the zones is straightforward when it is decided at specification stage.

Custom Dimensions: What We Need Before Cutting a Curve

Dimensions are customisable on this model, and curved frames are where dimensional changes have the largest cost effect. A straight sofa can be shortened by cutting a section; a curved frame needs the bend re-made. Send us:

  • A dimensioned sketch of the terrace with the intended seating position, not only a mood image.
  • The maximum overall width and depth the layout allows, taken from site measurements.
  • Any fixed obstruction — planters, balustrades, downlights in the floor, drainage channels.
  • Whether the set must pass through a doorway, lift or gate on the way to the terrace.

That last item is missed more often than any other. A one-piece curved frame that cannot clear a service lift gets dismantled on site at your cost, and it is avoidable with two lines on the drawing. Where access is tight, we plan knock-down joints and a heavier cover detail at the joint so the seam does not read as a compromise.

Sample Approval: Put the Sequence in Writing

For hospitality quantities we work through a defined sequence, and your specification should mirror it so sign-off responsibilities are clear:

StageWhat Is ConfirmedWho Signs Off
1. Brief and drawingsConfiguration, footprint, site conditionsBuyer / designer
2. Material proposalFrame section, coating system, fabric and stone referencesBuyer / designer
3. Sample or mock-upColour, hand, edge profile, seat comfortBuyer with operator input
4. Detail confirmation and quotationFinal dimensions, packing plan, quantitiesBuyer
5. Production, inspection, shipmentAs-built against the approved sampleBoth parties

Record the approved sample as a physical reference held by both sides, with the fabric code, coating code and stone batch noted on it. Production is then checked against that object rather than against an email thread.

Specify Delivery and Installation at the Same Time

A patio set that arrives in pieces with no installation plan costs more in site labour than the freight saving was worth. State in the specification whether you want the sets assembled on arrival, the packing method (carton, crate, or sea container consolidation with other project items), and who handles on-site placement. Our hospitality project furnishing service covers door-to-door delivery and on-site installation for projects where furniture is ordered together with other fit-out items, which also lets the curved lounge group ship alongside lighting, carpets and wall finishes in one consolidated consignment.

A Checklist to Paste Into Your Specification

  • Set composition and seat count, with overall footprint dimensions
  • Frame substrate, coating system, sheen and colour code per surface
  • Fabric type, colour reference, cover removability, foam density for seat and back
  • Stone name, finish, edge profile, thickness and fixing method; single slab batch across all tables
  • Site conditions: sun exposure, cover type, splash zone, finished floor level
  • Access route to the terrace, with knock-down joints noted if required
  • Sample approval sequence and who signs each stage
  • Packing method, delivery point and installation responsibility

Send that list with your drawings and a quotation comes back against a defined build rather than an interpretation. If you are specifying curved lounge seating for a resort terrace, hotel pool deck or villa patio, our team can review your document and flag the lines that will cause substitutions in production.

To specify this set for a project, send the configuration list, site conditions and stone or fabric references to SANTERSON — we manufacture curved outdoor sofa sets with marble coffee tables for hospitality and villa projects, with custom upholstery, metal colour and dimensions for bulk orders. Contact details are on our contact page.