A swim spa proposal is easy to approve on the strength of one good render and a single bottom-line price. It is much harder to defend later, when the plant room turns out to be undersized, the electrical supply on site cannot carry the load, or two bidders have quoted different equipment sets against the same model code. If your project team has received a quotation for Outdoor Swim Spa WS-PC07ST-L — whether for a resort wellness deck, a serviced-apartment amenity, a villa development or a sports and rehabilitation facility — the notes below show what a complete, comparable proposal should contain, and which questions to put back to the supplier before anyone signs.

Start With the Shell Footprint, Not the Model Name

Model codes in a configurable range are shorthand. They tell you which family of cabinet, glazing and equipment layout is being quoted; they do not automatically tell your architect or M&E consultant what has to be built around it. The catalogue entry for this model lists an overall shell of 7490 × 2400 × 1470 mm. Treat that as the starting point for coordination, and ask the supplier to confirm three separate dimensions in writing:

  • The external cabinet envelope, including any plant compartment, steps or automatic-cover option, since these change the pad and clearance required.
  • The water level and overflow arrangement relative to finished deck level, which drives drainage falls and any recessed or semi-recessed installation detail.
  • The access route for delivery and installation — door widths, lift dimensions, crane or rigging points, and whether the unit ships as one assembled shell or in sections.

A proposal that gives only the catalogue number, with no dimensioned general arrangement drawing, is not yet a proposal you can price against. Ask for a dimensioned drawing to scale, plus a plant and equipment schedule, and make both part of the contract document rather than an attachment that disappears at order confirmation.

Read the Equipment Schedule Line by Line

The specification published for this model lists one control system, one swim training system, one filter pump, six jets in total, four LED lights and a total power figure of 6.55 kW. That last line is where most commercial proposals go wrong, so check it against your own electrical design rather than accepting it at face value.

Item on the scheduleWhat to verify before you accept it
Total power (6.55 kW as listed)Confirm whether a heat pump, water pump or insulation package is included in that figure or excluded from it. Compare like for like when you have more than one bid.
Filter pump — 1 pcAsk for flow rate and run-time control settings, and how filtration cycles are scheduled when the facility is unoccupied.
Jets — 6 pcs totalRequest a jet layout plan showing position and function, so hydrotherapy zones can be checked against the operator's intended programme.
Swim training system — 1 setAsk what flow or current arrangement is provided and how it is adjusted, since swim performance drives user satisfaction in a commercial setting.
Ozone and optional UV sterilizationConfirm which sanitisation method is quoted as standard and which are priced options, plus consumable replacement intervals.
Heat pump and insulation optionsGet the heating capacity and the expected energy behaviour for your climate zone; a unit quoted without a heat pump is not comparable to one supplied with it.

Where a line reads "not listed" or is simply absent — as the water pump is in the captured specification for this model — do not assume it is included. Put it in writing as an exclusion or an inclusion, and have both bidders answer the same question.

Match the Configuration to How the Facility Will Actually Be Used

The same shell can be quoted for very different purposes, and a sensible evaluation weighs configuration against operating intent rather than against a brochure.

Hospitality and resort wellness

Guest-facing installations need to hold water quality with minimal disruption. Prioritise the filtration and sanitisation specification, service access that does not run through guest areas, and lighting control that can be set for evening ambience as well as cleaning. If your brief also covers poolside lounging, coordinate the swim spa layout with the wider outdoor furniture collection at the design stage so deck levels, drainage and wind exposure are resolved once.

Multi-unit residential and serviced apartments

Here the deciding factors are usually running cost, noise, and how many residents can use the unit at once. Ask for the filtration cycle logic, sound behaviour of pumps and jets at full load, and a control system that lets facilities staff lock temperature and schedule presets.

Rehabilitation, training and sports use

Programme-driven use puts weight on the swim training system and jet layout. Specify the current arrangement and jet positions against the coaching or therapy protocol you intend to run, and confirm that the control system supports repeatable presets between sessions.

Check What Sits Outside the Shell

A swim spa is a small plant installation wrapped in a leisure product. The proposals that survive value engineering are the ones that already answer the supporting scope:

  • Foundation and structural support. Confirm the loaded weight with water, occupants included, and the point loads at the cabinet corners, so the slab or deck build-up is designed rather than assumed.
  • Electrical supply. Verify supply capacity, protection device ratings and cable routes against the quoted total power, including any heat pump option you are considering.
  • Drainage, overflow and primacy of the plant space. Confirm drain points, emergency overflow routing and clear access for maintenance without closing the facility.
  • Water fill and top-up. Identify the fill source, any softening or dosing requirement, and how the unit is drained for deep cleaning.
  • Surrounding finishes. Decking, cladding and steps are usually excluded from a spa quotation; list them explicitly so your main contractor prices them instead of leaving a gap.
A useful test: hand the proposal to your M&E consultant and ask whether they can design around it without further questions. If they come back with a query list, that list belongs in the tender clarification round, not on site.

Compare Suppliers on Delivery and Support, Not Only Price

For an imported installation, the commercial risk usually sits in logistics and commissioning rather than in the shell itself. Ask each supplier to state, in writing: shipping method and packaging arrangement for a unit of this size; who handles customs clearance and door-to-door delivery; which party is responsible for setting, connection and commissioning; and what happens when a component fails after handover.

SANTERSON works as a furniture and building materials supplier for hospitality, villa and office projects, with the service scope published on its site covering design coordination, custom and OEM work, logistics and door-to-door delivery, and installation with after-sales support. Where a project combines a swim spa with other fit-out elements — outdoor furniture, wall and ceiling finishes, lighting, cabinetry — sourcing those through one supplier reduces interface risk, but it does not remove the need to check each specification line as described above.

For projects where the standard shell does not suit the site geometry, ask whether a bespoke shape is available. The range includes options for customised configurations, and Customizable Shape Outdoor Spa covers square, round, oval and curved forms for gardens, terraces and leisure areas. Any bespoke design should come back with the same dimensioned drawings and equipment schedule as a standard model, otherwise you cannot compare it against the rest of the tender.

Ten Questions to Send Back With Your Clarification Request

  • Please confirm the full external envelope including steps, plant compartment and any cover option.
  • Please provide a dimensioned general arrangement drawing at scale.
  • Please state which items in the equipment schedule are standard and which are priced options.
  • Please confirm whether the quoted total power includes or excludes heat pump and water pump.
  • Please supply the jet layout plan with positions and functions.
  • Please specify filtration flow rate, cycle control and consumable intervals.
  • Please state loaded weight and point loads for structural design.
  • Please confirm shipping method, delivery responsibility and site set-up requirements.
  • Please identify who carries out commissioning and what handover documentation is provided.
  • Please list exclusions in full: foundation, decking, cladding, electrical works, water treatment chemicals.

If two bidders answer all ten in comparable form, the price difference usually explains itself. If one cannot, that is your answer as well.

Frequently Asked Questions

Is the published specification final?

No. The figures published in the catalogue describe the configuration as listed on the product page. Included equipment and electrical requirements depend on the configuration selected, so confirm them against your quotation.

Can this model be supplied for a commercial project rather than a private residence?

The shell and equipment set are configurable, and the range is used in hospitality, residential and leisure settings. What matters commercially is the confirmed specification, the supporting services scope and the maintenance plan agreed before order.

Should we tender several swim spa models against each other?

Only if they are tendered on the same basis. A shorter shell with a different jet count and a different heat pump option is not comparable to this model line by line, so fix your own equipment schedule first and ask every bidder to price against it.

Before you sign a swim spa contract, put the drawings, equipment schedule and service scope in front of the project team. Send SANTERSON your model reference, site condition and intended programme use, and request a written proposal with dimensioned drawings, a line-by-line equipment schedule and a clear list of exclusions — so the number you approve is the number you build.