Flush interior doors look effortless once a project is handed over: a flat, wall-aligned leaf, a slim shadow gap, no visible frame fuss. That quiet result is the part that gets photographed. What rarely shows in the photograph is the sequencing behind it — when the doors are measured, how they travel from the factory to site, and which trades have to be finished before the leaves can safely arrive. If you are specifying Santerson Flush Interior Doors for a villa or apartment package, delivery and installation planning is worth treating as its own line item, not an afterthought at the end of the programme.

Why flush doors reward early planning

Santerson Flush Interior Doors sit within the interior doors range and are made to measure: dimensions, layout, material and finish are specified per project rather than picked from a stock size list. Made-to-measure work removes the option of a last-minute substitution. If an opening changes after production has started — a wall moved out by a few centimetres for insulation, a screed level raised, a door hand reversed on site — the leaf and its lining have to be re-specified, and that correction sits on the critical path.

The same is true of the finish. A flush door is judged by how it disappears into the wall plane, so the surrounding surface has to be set out before the door is fitted. Where the design calls for a concealed or handleless detail, as in Santerson Handleless Concealed Doors or Flush Wall Aligned Doors, the ironmongery and hardware pockets are built into the leaf. Hardware choices therefore have to be frozen at the same time as the door specification, not when the installer arrives on site.

Read the door schedule against the wall schedule

Before anything is ordered, put the door schedule next to the wall and finishes schedules and check them as one document. For every opening, confirm:

  • the finished floor level on both sides of the opening, including screed, adhesive and floor build-up
  • the completed wall thickness — plasterboard layers, insulation, backing timber, and any services run inside the wall
  • door hand, swing direction and which way the leaf reveals
  • opening width and height measured to the finished surface, not to the structural line
  • handle, hinge and closer selection, and whether the leaf is specified handleless or concealed
  • the agreed finish — paint, veneer, lacquer — and whether that finish is applied in the factory or on site

Where a door is intended to read as part of a panelled surface rather than as a separate opening, review it alongside Integrated Door & Paneling so the panel layout and the door reveal are resolved together. Two different suppliers setting out against two different wall lines is the most common way a flush detail fails.

Sequence production with the wet trades

A practical rule for ordering: measure after the openings are permanently fixed and the finishes around them are defined. In practice that means the structural walls, the studwork lining, the services and the floor build-up are all settled before final site dimensions are signed off.

Santerson's stated workflow runs from consultation and design through production, logistics, installation and after-sales support. The logistics and door-to-door delivery service describes global freight forwarding by sea, air or rail, packaging and container loading, customs paperwork and shipment tracking. Ask for the doors to be packed as a labelled set per room or per floor, with the schedule number on each package rather than only the carton count. On a multi-floor project, unlabelled crates turn into doors landing on the wrong level and being stored where they will be damaged.

Two scheduling points matter more than the transit time itself:

  • Arrival after the messy work is done. Plastering, painting, tiling and floor installation all generate dust, moisture and impact risk. Flush leaves delivered early tend to be stored in corridors and get knocked, scraped or swollen.
  • Arrival with enough time before handover. Fitting, adjusting and signing off snag items takes longer than the fitting itself, particularly where a shadow gap or a concealed hinge has to be adjusted repeatedly.

For an international package, agree the delivery address, who signs for the consignment, and which party is responsible for the last leg from port to site. Those answers change if the site is a secured apartment block or an occupied residence rather than an open villa plot.

Prepare the openings before the doors land

The most useful thing a main contractor can do for a flush door package is complete the openings in advance. Before the leaves arrive, the lining or frame should be fixed and aligned to the finished wall line, the floor levels should be at final height with protective covering in place, and the wall surfaces around the opening should be ready to receive the door without further wet work.

A short pre-delivery check on site is worth writing into the programme:

  • linings fixed, plumb and set to the finished wall face
  • finished floor levels confirmed and protected at the threshold
  • opening dimensions re-checked against the signed-off schedule
  • hardware positions and any concealed ironmongery confirmed against the approved detail
  • dry, secure, covered storage nominated, with racks for vertical storage of leaves
  • clear access route from the delivery point to the storage area

If the design also calls for sliding or folding variants in the same development — Santerson Flush Sliding Doors, for example — those need their track and pocket provisions built in even earlier, because they are embedded in the wall build-up rather than fixed into a finished opening.

Install in one controlled pass

Santerson lists installation and after-sales support, which the service page describes as on-site installation, inspection and snagging, spare parts and replacement, and ongoing maintenance. Whichever party fits the doors, treat fitting as one controlled pass rather than a rolling job: hang, adjust, then inspect the whole set in a single visit so consistency of gap and reveal can be judged across rooms.

Walk the set with the same checklist every time:

  • leaf sits flush with the finished wall face, with an even reveal on both sides
  • consistent gap at head, lock edge and threshold across the whole package
  • the leaf closes under its own weight and stays where it is left, within the design intent
  • hardware operates smoothly, and handleless or concealed details are consistent with the approved sample
  • finish is free of transit damage, with any touch-in agreed rather than improvised on site

Record snags against schedule numbers, not room names. A snag list keyed to the door schedule can be matched to the production order, which is what makes spare parts and replacement straightforward later.

What to agree with the supplier before production starts

A short written confirmation protects both sides. Before the doors go into production, we recommend agreeing:

  • the signed-off door schedule, with every dimension taken to finished surfaces and initialled by the person who measured
  • a sample leaf or finish board approved before the full package is made
  • the packing and labelling method, per room or per floor
  • delivery address, receiving party and Incoterms for the consignment
  • who fits the doors, and what access and conditions they need on site
  • the snagging route and who is responsible for adjustment after handover

Materials, dimensions and finish selections need to be confirmed for each project before manufacture, so a change that arrives late is expensive in both money and programme. Everything that can be decided on paper — hands, hardware, finishes, packing — should be closed out before the first cut.

A simple timeline to work from

  • Design stage: fix door types, finishes and hardware; decide which openings are hinged, sliding or concealed.
  • Tender stage: issue the door schedule with the wall and floor schedules so contractors price the same set-out.
  • Pre-production: site re-measure after walls, services and floor levels are final; approve a sample before release.
  • Production: manufacture with agreed packing and labelling; confirm shipping documents and tracking.
  • Site preparation: linings fixed and aligned, wet trades complete, storage nominated.
  • Delivery and fitting: doors arrive after the risk of damage has passed; one controlled fitting pass across the set.
  • Handover: inspection against the schedule, snags logged by schedule number, maintenance and spare-parts route confirmed.

Planning the package with us

Flush interior doors are usually ordered as part of a wider fit-out — joinery, wall panelling, flooring and ironmongery from the same package. Working with a one-stop project furnishing supplier keeps those setting-out decisions in one place instead of splitting them across three trade packages.

If you have drawings or a door schedule ready, send them over with your programme dates and we will review the openings, confirm the specification options available for Santerson Flush Interior Doors, and come back with a proposal covering production, delivery and installation support. You can reach us through the contact page.

Dimensions, materials and finish selections shown in this article are project-specific and must be confirmed for each order before manufacture.