When a specifier, contractor or procurement team reviews sanitary ware for guest rooms, the submittal package decides whether the product is approved on the first pass or sent back with comments. For the Two Piece Washdown Toilet 1038A, Dual S Trap & P Trap Ceramic WC Toilet for Hotel Bathroom, a complete submittal should answer three questions before anyone picks up a tool: which outlet direction the room actually provides, what rough-in dimension that outlet was set to, and who is accountable for supply, delivery and replacement parts across the life of the project. The sections below list exactly what to put in that package, using only the information published on our product page.

1. Product identification and scope

Start with an unambiguous reference so the item cannot be confused with the other ceramic WCs in the same order. The submittal should carry the model number 1038A, the full product name as it appears on the catalogue page, the product URL, and a single clear product image from the official gallery rather than a stock render. State the category — bathroom sanitary fixtures — and the intended use our page describes: home, apartment, hotel and commercial bathroom renovation.

Add one line naming the range this model sits beside on the site, because reviewers frequently approve a family of WCs rather than one SKU. Our catalogue also lists wall-mounted options such as the Wall Hung Toilet 1038W and floor-standing one-piece washdown models, so the submittal should say explicitly which model applies to which room type on the fixture schedule.

2. Construction and material statement

Our product page describes the 1038A as made of vitreous china ceramic with a smooth glazed surface that resists dirt adhesion and simplifies daily cleaning. Put that description in the submittal in plain words, and keep it aligned with the wording on the published page. Where a reviewer asks for test reports, water absorption figures or finish certifications, treat these as documents to be supplied from the current technical sheet rather than values to be typed into an email — our own source note states that dimensions, trap/rough-in details and product-standard claims must be verified against the final technical sheet before publication.

For hotel work this section is also where you record what housekeeping needs: a glazed surface that takes routine cleaning agents without dulling, and a two-piece construction in which the pan and the cistern are separate components that can be replaced independently if one is damaged during operations.

3. Outlet type and rough-in dimension — the part most often wrong on site

The defining feature of this model is that it supports both outlet directions, and the submittal must show which one is being ordered for each room type:

  • Floor outlet (S trap) — the page lists a 250 mm floor S-trap rough-in. Use this where the waste drops into the slab or floor structure below.
  • Wall outlet (P trap) — the page lists an 180 mm wall-mounted P-trap rough-in. Use this where the waste exits through the wall, which is common in partition and chase installations.

Both figures should be reproduced in the submittal with a simple dimension sketch showing the finished wall face, the centre line of the outlet and the measurement taken from it. That single drawing prevents the most expensive error in WC procurement: ordering the correct model with the wrong outlet, or the correct outlet at the wrong distance. Ask the site team to confirm the as-built rough-in for a sample bathroom before the bulk order is released, and record the confirmed value in writing.

Also state the supply assumption for parts that sit outside the ceramic itself — the flush mechanism inside the cistern, the seat cover, the floor fixings and the seal to the waste outlet. If these are included or optional, say which; a submittal that is silent on them reads as “not included” to most reviewers.

4. Flushing performance and water connection

The page describes a washdown flushing design that delivers strong cleaning performance. In the submittal, pair that description with the practical data an installer needs: the water inlet location and connection type, whether the cistern is supplied complete with its internal mechanism, and the flow or flush volume figure exactly as printed on the current technical sheet. Flush volume drives both pipe sizing and the building’s water target, so it belongs in the approved document set — but it should be quoted from the sheet that governs the order, not estimated.

5. Compatibility with the rest of the bathroom

Guest bathrooms are approved as a set, so show how the WC sits alongside the other fixtures in the same project package. Our catalogue carries matching ceramics such as the Wall Hung Basin 1038WB and the Floor Standing Bidet 1038F, together with vanities, mirror cabinets, shower systems and bathroom lighting. A submittal that groups these under one schedule lets the reviewer check style consistency once instead of room by room.

6. Project quantities, packaging and delivery

Bulk and project orders need their own page in the package: quantity per floor or room type, spares held for maintenance, carton dimensions and packing list, handling notes for ceramic goods, and the shipping route to site. As a one-stop furniture and building materials supplier, we handle production and door-to-door delivery within one turnkey scope, which means the same team coordinates ceramics with the joinery, flooring, lighting and outdoor furniture in the project — fewer separate submittals to track and fewer gaps between trades.

Include a breakage clause in plain language: how damaged units are reported on arrival, what photographic evidence is required, and how replacements are shipped. Ceramic goods travel long distances, and an agreed process written before dispatch settles disputes that would otherwise stall the wet-trade programme.

7. Installation sequence handed to the site team

Attach a one-page installation note covering the order of work: confirm the as-built outlet and rough-in, set the wax or rubber seal to the waste, position and level the pan, fix it to the floor, mount the cistern, connect the water supply, then flush-test and check for leaks before the floor finish is protected. Note that the finished rim height and the distance from the pan to the finished wall depend on the floor build-up, so these should be checked against the confirmed finished floor level rather than the drawing dimension.

8. Customisation and after-sales support

Our page states that bulk wholesale and project customization are supported. Record in the submittal which options apply to this order — quantities, mixed outlet types across room types, packaging requirements — and confirm anything not already published through our team before it is written into the document. After handover, list how replacement seats, cistern mechanisms and spare pans are ordered, since a two-piece WC stays in service for years and maintenance teams buy parts long after the original purchase order closes.

Submittal checklist

  • Model 1038A, full catalogue name, product URL and official image
  • Vitreous china body and glazed finish, described as published
  • Selected outlet per room type: 250 mm floor S trap or 180 mm wall P trap, with dimension sketch
  • Confirmed as-built rough-in from a sample bathroom before bulk release
  • Included and optional items named: seat, cistern mechanism, fixings, waste seal
  • Flush type, water connection and flush volume taken from the governing technical sheet
  • Matching fixtures grouped on one schedule
  • Quantities, spares, packing list, shipping route and breakage process
  • Installation sequence keyed to finished floor levels
  • Customisation options and spare-parts contact for the operating phase

Send that package as one document with a single revision number, and every question a reviewer can raise about outlet direction, rough-in and accountability is answered before the wet trades start. As a hotel furniture and fit-out supplier working on guest room and villa projects, we supply the technical information behind this model together with the rest of the bathroom and interior package — send us your fixture schedule and we will return a submittal set matched to it.