A quotation for Santerson Integrated Media Storage is not a price sheet for a box you drop into a room. It is part of a built-in wall system, specified to your opening and your layout, so the number on the page only means something once the line items behind it are clear. The checklist below follows the order most buyers work in: scope first, then materials, then hardware, then logistics, then terms.
1. What is actually being quoted
Integrated media storage sits inside the furniture series as a configurable storage wall, and it is usually built to the width and height of the wall you are working with. Before comparing prices between two quotations, confirm both are quoting the same thing:
- Overall run length and height, plus how the unit meets the skirting, cornice and ceiling line.
- The split between open display areas, closed cabinets and the media zone where the screen and equipment sit.
- Whether returns, niches and any full-height full height storage walls in the same run are included, or priced as extras.
- Whether site measurements were taken by your team or supplied to the factory, and who carries the cost of a re-measure.
A quotation that reads "1 set, media wall" tells you nothing. Ask for a dimensioned elevation drawing with each module identified, so later variations can be priced against a fixed reference.
2. Materials and finishes in writing
Material and finish options are specified per project, so the quotation should name them rather than describe them. Look for the board substrate behind each visible surface, the edge treatment on doors and shelf edges, and the finish system by name — lacquer, veneer, laminate or glass — with a sample reference code. Vague wording such as "premium wood finish" cannot be inspected on delivery.
Two practical points matter more than most buyers expect. First, ask which surfaces are the same material throughout and which are wraps over a different core; both are legitimate, but they age differently and should not be quoted as if they were identical. Second, request a physical finish sample before production release, because a screen colour is not a finish.
3. Media zone details that get missed
The part of the unit people argue about after installation is usually the media zone, and it is cheap to settle at quotation stage:
- Screen fixing method and the backing structure the bracket bolts into, with the maximum screen size and weight the wall carrier is designed for.
- Cable routes and where the access panels sit, including space for a soundbar, set-top box or console.
- Ventilation for equipment that runs warm, and whether equipment doors are solid, glass or louvred.
- Whether integrated lighting is included, and if so which components come pre-wired versus what your electrician completes on site.
4. Hardware and moving parts
Hinges, runners, lifts and handles are where a modest unit and a serious one separate. The quotation should state the hardware type for each door and drawer bank, soft-close or not, and whether concealed or surface-mounted. If push-to-open or pocket and sliding elements appear in your design, ask what clearance they need to operate and whether that clearance is allowed for in the drawing.
5. Custom work, prototyping and minimums
If your design steps outside standard modules — a curved end, an arched niche, a bespoke handle detail, or matching joinery repeated across several rooms — the custom furniture design and prototyping route is what covers it. Confirm in the quotation whether prototyping or a mock-up is included or charged separately, what the minimum order quantity is for that project, and who signs off the prototype before full production starts.
6. Freight, packaging and delivery terms
Built-in units arrive as panels and modules, so logistics belong in the same conversation as price. The quotation should state the Incoterm and what it covers, the packaging standard for glass and finished panels, container loading arrangements, and the named delivery point — port, depot or the property itself under logistics and door-to-door delivery. Import duties, local taxes and any permit handling should be shown separately so you can see your landed cost rather than guess at it.
7. Installation, snags and after-sales
Decide now who fits the unit. If installation is included, ask what it covers: levelling and fixing to wall, making good around the opening, glass and hardware adjustment, and a snag list signed off at handover. Installation and after-sales support terms should be written into the quotation with what counts as a warranty claim, how replacement panels or hardware are supplied, and what is excluded — usually site movement, ground conditions and damage caused by other trades.
8. Commercial terms worth reading twice
- Validity period of the price, and what triggers a re-quote.
- Payment stages tied to design approval, production release and shipment — not one lump sum.
- Production lead time stated from design sign-off, not from order date.
- Change-order rules: what can still change after drawings are approved, and at what cost.
- What happens if a module arrives damaged or short — replacement, credit, or a later shipment.
A simple way to compare two quotations
Put both offers into the same table: scope, dimensions, substrate, finish code, hardware schedule, media-zone provisions, freight term, delivery point, installation scope, warranty, price validity and payment stages. Two quotations that look different in price often turn out to be identical once one of them has been quietly excluding site measurement or door handles. Where the specification genuinely differs, you can then decide whether the difference is worth paying for.
If you want a single supplier handling the media wall alongside the rest of the joinery and finishes on the same project, that coordination is what turnkey interior project solutions are set up for — one specification, one production schedule, one delivery window.
Send us your wall dimensions, a photo of the space and the screen or equipment you plan to house, and we will return a dimensioned layout with a line-item quotation covering materials, hardware, freight and installation scope. Contact PHILLIP on +86-13928214007, email santerson@qq.com, or use the form on our contact page.