A flat panel European kitchen looks simple on paper. That is exactly the problem. With no mouldings, no raised panels and often no visible handles, there is nowhere for a vague drawing or an unfinished specification to hide. Every dimension, every finish edge and every door alignment is on show once the cabinets are installed.
If you are specifying flat panel European cabinets for a villa, an apartment block or a hotel fit-out, the quality of the finished kitchen is decided long before production starts. It is decided by the brief you send to the manufacturer. Below is the information we need from project buyers, contractors and designers to quote accurately and build once, correctly.
Start with the room, not the door style
Send us the measured drawing of the kitchen space, or the architectural drawing if the walls are still to be built. We need overall lengths and heights, the position of windows, doors, ducts, risers and any beam that affects a tall unit, plus floor-to-ceiling height at more than one point in the room if the slab is not level.
Tell us which wall the run starts from and how you want corners resolved. A straight run is straightforward; an L-shaped or U-shaped layout needs decisions about corner units, blind corners and whether an appliance column sits at the end of a run where a scribe panel would be visible.
Specify the door construction and the finish
Flat panel is a door profile, not a material. Tell us both parts separately:
- Substrate and construction. The core board, its thickness, and whether the panel is single-piece or framed. If you have a required board grade for the project, name it in the brief rather than expecting us to guess.
- Surface finish. Matte, high gloss, acrylic, lacquer, melamine, wood veneer or a wood-effect laminate. Our Modern European Kitchen Cabinet collection covers these across matte, high gloss and two tone schemes.
- Colour reference. A RAL number, a Pantone code, a supplier's laminate code, or a physical sample posted to our Foshan workshop. Screens do not carry colour reliably; a named reference does.
- Edge treatment. On flat panel doors the edge is the visible face on three of four sides. Say whether you want matching edge banding, a wrapped edge or a lacquered edge, and who decides the radius.
Where a project calls for a handleless look, say so in the first message. Handleless European work changes carcass clearances, door sizes and the plinth detail, and it is far cheaper to design in than to convert later.
Send the appliance schedule early
Appliances set the module widths. Send the model numbers, or at least the cut-out dimensions and door-hinging direction, for the oven, cooktop, dishwasher, refrigerator and any wine column or microwave drawer. We need to know which appliances are integrated, because an integrated door is a cabinet door with a fixing kit on the back, not a decorative panel.
If appliances have not been chosen yet, tell us that too. We will design the tall and base units to standard cut-outs and flag where the design has to be revisited.
Count the interiors and the hardware
The quote follows the internal layout, not just the door count. For each run, list what is behind the doors:
| Item to specify | Why it matters |
| Drawers, pull-out trays or shelves | Drawer stacks cost more than shelf bays and change the run height plan. |
| Hinge type and opening angle | Soft-close, concealed or inset hinges affect the carcass boring pattern. |
| Slide rails and load rating | A pantry loaded with dry goods needs a different runner than a cutlery tray. |
| Corner solutions | Lazy Susan, pull-out carousel or plain shelf corner — pick one and we build to it. |
| Integrated lighting and profiles | Cabinet lighting needs channels, transformers and a switch point decided at design stage. |
| Support legs, brackets and fixings | Matching hardware can be supplied with the order so nothing is sourced locally on site. |
Our custom built-in kitchen cabinets are supplied with the supporting hardware set — hinges, drawer slide rails, support legs and connecting brackets — so a complete brief lets us pack everything together for the site.
State the project context and quantities
A single villa kitchen and forty identical apartment kitchens are quoted differently. Tell us:
- the number of kitchens or units, and whether layouts repeat across floors;
- the delivery address and whether the goods go to site, to a warehouse or to a joiner for on-site fitting;
- who is doing the installation, so we know how much assembly to complete in the factory;
- the required handover date, working backwards from any site freeze.
For hospitality and multi-unit work, ask us to keep one approved reference sample per finish. That sample becomes the yardstick for every batch, which is how a project keeps its colour consistent across floors and phases.
What we confirm back to you
Once your brief arrives, our team returns shop drawings showing dimensions, door elevations, appliance cut-outs and hardware schedules. Nothing enters production until those drawings are signed off. That step is where a good brief pays for itself: corrections are made on paper, not on site.
A short brief checklist
- Measured or architectural drawings, with levels noted
- Door profile and finish, with a colour reference
- Handleless or handle detail confirmed
- Appliance schedule with cut-outs
- Internal layout per run: drawers, shelves, corners
- Hardware preference and lighting requirement
- Quantities, delivery address, installation responsibility
- Target handover date
Ready to send your brief?
SANTERSON is a China-based furniture and building materials manufacturer supplying custom cabinetry for residential, villa and hospitality projects worldwide. Send us your drawings, finish references and quantities, and we will come back with shop drawings and an itemised quotation.
Contact: PHILLIP
Phone / WhatsApp: +86-13928214007
Email: santerson@qq.com
Workshop: Longjiang, Shunde, Foshan, Guangdong, China
Enquiries receive a response within 24 hours (Monday–Saturday, GMT+8).