A wall-hung basin looks simple on a drawing. It is one rectangle of ceramic floating above the floor, with a tap hole and a waste. The reason project teams still stop and ask questions before placing a bulk order for Wall Hung Ceramic Basin 1004B, Modern Wall Mount Bathroom Sink is that everything difficult about this product happens behind the tile line: what carries the load, where the waste drops, and which version of the suite each room is actually getting. Confirming those items before production starts, rather than after containers are booked, is what separates a smooth handover from a site variation.

1. Confirm the wall that will carry the basin

Model 1004B fixes to the wall through its back panel, so the substrate behind the tiles decides how the job goes. Before production, agree with the site team what each bathroom wall is made of and whether it can take a wall-hung fixture at the agreed mounting height.

  • Load-bearing masonry or concrete generally accepts back-panel fixing directly; timber stud or steel stud partitions normally need noggins, a reinforcing frame or a concealed cistern structure to carry basin plus faucet load.
  • Confirm the finished tile build-up. Adhesive plus tiles can shift the basin face by 15–25 mm from the substrate dimension, which changes where the tap hole and waste land relative to the mirror, vanity light and splashback joint.
  • Where a wall-hung WC shares the same wall, decide early whether one supporting frame carries both fixtures, so the ceramic front line stays flush.

2. Confirm the rough-in before the basin is fired

Ceramic is not a material you re-drill on site. The tap hole and the waste position are fixed at production, so the plumbing drawing has to match the product drawing line for line.

Overall size510 × 420 × 380 mm (width × projection × height), trapezoid form. Use this as a space-planning dimension, and re-check it against the current technical data sheet for the order in hand.
Tap holeSupplied with a tap hole for single-faucet installation. Confirm the faucet spout reach and handle clearance you intend to install, plus whether the pillar tap or a wall-mounted mixer is being used.
Waste and trapConfirm the waste outlet position and whether a bottle trap or concealed P-trap is specified. Bottle traps suit tight wall conditions and are easier to service in hotel rooms; concealed traps change the wall chase.
OverflowState clearly in the order whether an overflow is required, since this changes the moulding and the waste set.

The practical rule: send one combined dimension drawing that shows finished floor level, finished wall face, water supply outlets, waste outlet and mounting height. A separate sanitary ware drawing and a separate plumbing drawing is where most discrepancies come from.

3. Confirm the material specification you are buying against

The 1004B is made from vitreous ceramic with a dense glossy glaze, which resists water stain, limescale and yellowing — the properties that matter most in high-turnover hotel bathrooms and public washrooms where cleaning happens daily on a fixed schedule.

  • Agree glaze colour and finish against an approved physical sample, not a screen image. Off-white shades differ noticeably between production lots.
  • Agree packaging for the shipment. Wall-hung basins with a projecting back panel are the items most often damaged in the last leg to site, so specify individual cartons with corner protection and pallet strapping, and confirm who inspects on arrival.
  • Order a small quantity of spares with the main order. Guest-room replacement stock ordered years later may not match the original glaze batch.

4. Confirm which suite pairing each room type gets

1004B belongs to a matched sanitary series, and mixed specification across a project is a common source of complaints. The same series covers different installation conditions, so the choice should follow the room, not the other way round.

  • Washdown One Piece Toilet 1004A pairs with the basin for a coordinated look, and supports both P-trap wall drain and S-trap floor drain rough-ins — useful when a renovation keeps existing pipework.
  • Freestanding Ceramic Pedestal Basin 1004S suits rooms where the wall cannot take a wall-hung fixture, keeping the same styling with a floor-standing footprint.
  • For other room types in the same building, Wall Hung Basin 1038WB gives a wall-mounted alternative with its own shape and dimensions, which is worth comparing where guest bathrooms differ in size.

Where the project calls for a different look or size, Custom & OEM Service covers bespoke specification and prototyping. Confirm the tooling implications, minimum order quantity and lead time in writing before any sample is approved.

5. Confirm the commercial and handover details

  • Fix the unit count per room type and lock one specification code per type, so purchase orders, packing lists and site installation instructions all reference the same item.
  • Agree delivery terms and who handles customs clearance on arrival. Logistics & Door-to-Door Delivery covers freight, packaging and container loading, but duties, import conditions and site access should be settled per project.
  • Agree the snag process. Installation & After-sales Support covers on-site installation, inspection and spare parts; confirm which items apply to your site and in what scope before handover.
  • Keep the approved sample, signed dimension drawing and packing list together as one document set. That file is what resolves a dispute six months later.

One point worth being blunt about: do not let a wall-hung basin be produced from a rendering. The mounting height, waste position and trap type should be signed off against the technical data sheet for the specific production run, because those three items are the ones that cannot be corrected on site.

Start with your drawings

Send the bathroom layout, the room-by-room fixture schedule and the target delivery window, and we will confirm fit against the 1004 series — including rough-in compatibility, packaging plan and unit pricing for the full quantity. Contact PHILLIP at santerson.com/contact to begin specification review.