A Outdoor Swim Spa WS-S10-T submittal is the package a buyer, architect or contractor reviews before a swim spa is released for production and shipment. For a ten-metre unit that has to clear a site door, a pool deck and a main electrical panel, the paperwork decides far more than the brochure photo does. A complete submittal answers four questions in one pass: will it fit, will it connect, who owns each piece of equipment, and what happens when something is missing on site.

1. Dimensional drawings with clearances, not just outer size

The catalogue lists the WS-S10-T at 10000 × 2200 × 1420 mm. Those are shell dimensions. A submittal should restate them on a dimensioned drawing and then add what the site actually needs: the access path from the delivery vehicle to the final position, working clearances around the plant room or equipment compartment, and the space required for any optional steps.

Two checks belong in this section. First, compare the 2200 mm width against gates, side passages and lift openings on the site; a ten-metre shell that fits the plot can still fail to reach it. Second, confirm the water line and overflow arrangement relative to the surrounding paving or deck finish, because that level is set by the site, not by the factory.

2. The equipment schedule, stated as included or optional

The captured specification for this model shows one control system, one swim training system, two water pumps, one filter pump, a jet total of 76 pieces, and lighting described as one LED light together with 40 small LED lights. The features shown on the page are water jets, LED lighting, ozone and a swim training system.

The same catalogue also lists options across the range: control systems, UV sterilization, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model. So the submittal must not simply copy the option list. It should be a two-column schedule — included in this order, quoted as an option — with each line naming quantity and model reference. Anything that appears only in the option column is something nobody will install if it is not purchased.

The swim training system deserves its own line, because it is what separates this unit from a shorter hydrotherapy spa of the same footprint. The non-swim version in the same range shares the outer dimensions and much of the jet package; the difference sits in that system and in how the swimming lane is used day to day.

3. Electrical load and the point of connection

The catalogue figure for total power on this model is 7.65 kW. Treat it as a starting number for electrical coordination, not as the final one. The submittal should show the connected load, the supply arrangement the unit expects, protection and isolation requirements, and where the local electrician's responsibility begins and the supplier's ends.

This is the section most often left open at tender stage and most expensive to fix later. If a heat pump or sand filtration has been added as an option, the connected load changes with it, and the site supply must be sized after the final equipment schedule is agreed — not before.

4. Water treatment and daily operation

Ozone is shown as a feature on this model; UV sterilization appears in the optional list. A submittal should state which treatment is being supplied, how filtration is arranged through the filter pump, and what routine maintenance the owner is expected to carry out. Buyers who receive a long spa with a swim lane often plan for daily use, so the maintenance expectation belongs in the same document as the equipment list.

5. Site preparation and installation responsibilities

State plainly which party prepares the base, drainage and supply runs, and which party sets and connects the unit. For a villa or resort project, this is where a swim spa becomes part of a wider package: paving and decking around it, loungers and shade at the poolside, and sometimes pergolas or cabanas on the same terrace. Coordinating those items with one supplier keeps levels, finishes and delivery dates in one conversation instead of several.

6. Packaging, shipping and handover

For an imported unit, the submittal should be followed by a packing list matched to the equipment schedule, so the person receiving on site can tick off pumps, jets, lighting and controls against the same references used at tender. Santerson describes freight forwarding by sea, air and rail with customs paperwork and door-to-door delivery, plus installation support, inspection and snags, spare parts and ongoing maintenance after handover. Confirm terms, scope and response commitments for your own project before writing them into a contract.

7. What still needs confirming before you submit

The catalogue note on this product is worth repeating to every party in the review: included equipment and electrical requirements must be confirmed for the selected configuration. A submittal that carries forward unconfirmed options creates a false sense of completeness. Better to close those items with one short query round before production release.

A practical way to use the submittal

Read it as a checklist rather than a brochure. If a line cannot be traced to either the site works or the supplier's scope, it is unfinished. When the drawings, equipment schedule, electrical load and handover terms all agree with each other, the order can be released with far less risk of variation later.

Santerson supplies Swimming Pools and Swim Spas alongside the rest of its furniture and building materials range, and works on villa, hospitality and office projects from design and specification through production, logistics and installation. For a project enquiry around this model or the wider outdoor range, send the site drawings and your proposed configuration and we will return a confirmed equipment schedule and electrical figures for review.

Explore the wider product catalogue to see how poolside and outdoor items can be specified together with the interior package.