A round outdoor hot tub is one of the few exterior products where a single missing dimension can turn a confirmed order into a site problem. The shell, the cabinet, the jet layout and the lighting all have to clear the same opening, the same slab and the same power position. Before we quote our Round Outdoor Hot Tub Spa with Hydrotherapy Jets & Underwater LED Lights, we ask buyers and project teams for a specific set of measurements and inputs. This article lists exactly what to measure, what drawings to send, and what decisions those inputs drive.
1. The clear opening and the route to it
Start with the path, not the pit. A spa assembled in one piece has to travel from the delivery vehicle to its final position, and that route decides whether we ship it as a single unit or in sections.
- Narrowest point on the route: gate width, side-door width, garden gate, any corridor or turning between the kerb and the slab. Measure the clear opening with the door leaf open, not the frame width.
- Overhead clearance: pergola beams, eaves, low branches, overhead power lines along the route and above the final position.
- Final footprint: length and width of the level area where the cabinet will sit, plus how much working space you want around it for entry steps and for access to the equipment when servicing is needed.
- Turning space: a round shell cannot be walked around a tight corner the way a long cabinet can. Note every 90-degree turn on the route and the space available at each one.
Send photographs of the route as well as the numbers. A phone photo from the kerb to the position, taken at three or four points, usually answers questions that a sketch leaves open.
2. The base, drainage and structural support
The cabinet needs a continuous, level, load-bearing base. Tell us what you have or what you plan to build:
- Base type: reinforced concrete slab, compacted hardcore with a concrete topping, pedestalled deck on a slab, or timber frame deck.
- Level tolerance: confirm the slab is level in both directions. A round shell transfers its load evenly, and an out-of-level base shows up as stress on the shell and on the cabinet joints.
- Drainage: how water leaves the area around the spa — falls away from the cabinet, a channel drain, or a gully. Note whether any water will run under the cabinet.
- Access panel: if the spa sits inside a deck or a raised surround, mark where an access panel will be left for the pumps and controls.
If the base does not exist yet, send the slab layout drawing with its dimensions. We work to it, and we tell you where it conflicts with the unit.
3. Power and services
This is where an incomplete enquiry most often causes a delay on site. Please provide:
| Input | What to send |
|---|---|
| Supply | Single-phase or three-phase, and the available supply capacity at the panel. |
| Voltage and frequency | The destination country's nominal voltage and frequency (for example 220–240 V / 50 Hz). |
| Circuit position | Distance from the distribution board to the spa, and where the isolator or disconnect will be placed relative to the cabinet. |
| Protection | Breaker rating you intend to use and whether an RCD/RCBO is available; our wiring layout follows the destination-market arrangement. |
| Conduit route | Where the cable is buried or run, at what depth, and whether it shares a trench with other services. |
| Water fill and drain | Location of the fill point, and how the spa will be drained — to a gully, a channel drain, or by pump. |
Our Square Luxury Hot Spa with Waterfall Feature & LED Lighting uses an isolated power layout and a sealed base, and the same discipline applies to the round model: the electrical arrangement is planned around where your isolator sits, so the position matters before production, not after.
4. Jet and lighting configuration
The round shell carries hydrotherapy jets and underwater LED lights, and both are configurable. Send us:
- Seating count: how many people you expect to sit in the spa at one time, and whether you want bench seating all round or a deeper recliner position.
- Jet zones: which body areas should be targeted — lower back, calves, feet. This determines jet count and placement around the seat ring.
- Air treatment: whether you want an air blower in addition to the massage pump and circulation pump. On our square model the air blower is an option rather than standard, and we treat it the same way here.
- Lighting: number of underwater LED points and whether you want colour-changing or a fixed warm tone, plus any control preference for lights and pumps.
If your project also needs a pool or swim spa alongside the hot tub, our Swimming Pools and Swim Spas range covers both, and we coordinate the two on one layout drawing.
5. Shape, finish and whether round is right for the site
Round is a choice, not a default. Where the plot is narrow, or where the spa has to sit against a wall or inside a rectangular deck recess, another plan form uses the space better. Our Customizable Shape Outdoor Spa is built in square, round, oval and curved forms, so we can match the shell to the space instead of forcing the space to fit the shell.
For the round model itself, send finish preferences for the acrylic shell and the wood-look cabinet — including whether the cabinet tone should be matched to nearby pergola, lounger or dining pieces. Where a villa project has an outdoor furniture package running through the same garden, we coordinate those finishes together under our Turnkey Interior Project Solutions so the spa does not arrive in a cabinet tone that clashes with the terrace furniture already specified.
6. Site context and access for delivery
- Exposure: is the position open to wind, sheltered by a wall, or under a hardtop or pergola? This affects cabinet and finish selection.
- Freezing conditions: tell us whether the site sees frost or freezing nights, so the insulation and drainage arrangement is specified for it.
- Delivery vehicle access: street width, whether a crane or tail-lift is needed, and any permit requirement for kerbside unloading.
- Project stage: send the site plan or landscape drawing if one exists. A spa specified before the deck is built costs far less to place than one specified after.
7. What we return once you send these inputs
With the opening dimensions, base arrangement, power position and jet/lighting preferences in hand, we come back with a specification for your approval: shell form and size, seat and jet layout, lighting count, cabinet finish, and the equipment position drawn against your isolator. Where the project calls for it, we also flag conflicts early — an opening too narrow for a one-piece delivery, or a deck surround that leaves no servicing access.
That specification then feeds into our Custom & OEM Service, so dimensions and finishes can be adjusted before production starts rather than on site. For buyers coordinating several exterior elements at once, we are a one-stop furniture and building materials supplier, which means the spa, the pergola, the loungers and the poolside paving are quoted and shipped on one schedule instead of four.