Folding doors rarely decide a hotel budget, but they decide how guest rooms, suites and meeting floors actually work. A set that opens cleanly turns a narrow service area into usable space; a set specified late becomes the item nobody wants to pay for twice. This guide walks through how we specify and supply Santerson Wood Veneer Folding Doors for hospitality projects, from the drawing stage to handover.
Why wood veneer folding doors end up on hospitality schedules
In guest rooms and serviced apartments, folding doors are usually the closure between a bedroom and its wardrobe run, or between a suite's living area and a study alcove. In meeting floors they close off breakout rooms. Two pressures drive the specification: floor area is expensive, so operators want openings that disappear when open and seal when closed; and the door face has to read as part of the wall, not as hardware bolted on afterwards.
Wood veneer answers the second pressure. The leaf face takes a timber grain that can be matched to wood veneer panels, joinery and casework running through the same floor, which is why veneer folding doors are usually ordered alongside cabinetry rather than as a standalone door line. The Santerson folding door range also covers glass folding doors where daylight through a partition matters, and classic folding doors for paneled schemes.
What the product line actually offers is configuration, not a fixed catalogue size: made-to-measure sizing, selectable material and finish, and a layout tailored to each project. That flexibility is the reason procurement planning matters — every one of those choices has a cost, lead-time and site-interface consequence that should be settled before purchase orders are cut.
Step 1: Lock the schedule before anyone asks for a price
Door enquiries that arrive as "supply folding doors, this many openings" produce quotes nobody can compare. Build the schedule first, one line per opening type:
- Room type and count — how many identical openings, and where they sit in the stack.
- Clear opening width and floor-to-ceiling height, with the finished-floor level noted.
- Leaf count and fold direction, plus which side stacks when open.
- Track detail: top-hung or bottom-rolling, and whether a floor track is acceptable in that location.
- Veneer species, grain direction and sheen, referenced against the wall and joinery samples already approved.
- Acoustic and privacy expectation for the opening, since hardware and sealing follow from it.
Grouping identical openings is where savings appear. A hospitality project with repeated guest-room layouts can run one production configuration across dozens of sets, which simplifies both manufacturing and the spare-parts stock you keep for housekeeping repairs later.
Step 2: Match the veneer to the wall, not to a sample card
The most common rework call on veneer doors is colour and grain mismatch against joinery that came from a different supplier. Order the door face from the same programme as the surrounding wall panels and cladding and built-in furniture, so species, cut and finish are governed by one specification.
Practical checks at approval stage:
- Approve a physical leaf sample against the installed wall panel and wardrobe door, under the room's actual lighting.
- Fix grain direction per opening — a flipped grain across two openings in one suite reads as an error even when both leaves are correct.
- Record the finish build (open-pore, satin, higher sheen) in writing; housekeeping maintenance differs by sheen.
- Note edge and hardware colour so handles and frames are consistent with ironmongery specified elsewhere on the floor.
Materials, dimensions and finish selections for each order should be confirmed against the approved sample rather than assumed from the product page. That confirmation step belongs in the purchase documentation.
Step 3: Specify made-to-measure sizing against site conditions
Made-to-measure only pays off if the dimensions are taken at the right moment. Take final sizes after wall finishes, screed and floor finishes are in, or issue a clear tolerance schedule for the trades that follow. Doors measured off structural drawings and ordered early get adjusted on site; adjustments on veneer leaves are expensive and visible.
| Site condition | What to fix on the door specification |
|---|---|
| Ceiling build-up with services above | Head clearance, track fixing method, access panel position |
| Timber, stone or carpet floor finish | Whether a bottom guide is permitted and how it sits on that finish |
| Repeated guest-room modules | One standard configuration, documented once and reused |
| Suite openings with feature walls | Veneer continuity across door and panel, joint detail at the reveal |
| Back-of-house and service routes | Hardware duty level and leaf construction suited to frequent daily use |
Each row above should be answered in the shop drawing set before production starts. Where a project carries both guest-facing and back-of-house openings, specify them as separate configurations rather than forcing one build across both.
Step 4: Order doors inside the wider fit-out package
Folding doors are a poor standalone import. They share wall reveals, floor levels, ironmongery and finishing trades with everything else in the interior package. Bundling them into a turnkey interior project solution alongside cabinetry, wall paneling, lighting and bathroom fixtures means one coordinated drawing set, one consolidated shipment and one installation sequence.
Our custom and OEM service covers bespoke material, finish and texture selection with prototyping where a project needs a physical leaf signed off before the run. For operators running their own brand standards — an engraved handle, a specific veneer species held on file — that same process carries across from one property to the next.
On the delivery side, freight is arranged by sea, air or rail with customs paperwork and door-to-door delivery handled as part of the package. Import terms, duties and transit arrangements for a specific destination should be confirmed case by case with our team rather than assumed from a general service description.
Step 5: Sequence installation and protect the handover
Folding doors install late, which makes them the trade most often blamed for a slipping programme. Put them after wet trades, floor finishes and ceiling works are complete, and give the crew clear access to the opening.
- Confirm openings on site against shop drawings before leaves arrive on the floor.
- Store leaves flat in a dry holding area; do not lean veneer leaves against walls in a corridor.
- Set tracks and guides with the finished floor in place, then check every leaf through its full travel.
- Run a snag list per opening: alignment, closing seal, handle operation, soft-close behaviour if specified.
- Hand over spare parts and the confirmed specification for each opening type, so future maintenance matches what was built.
Installation support, snagging and after-sales cover are part of our service scope; warranty terms and response arrangements should be agreed in writing for the project in question.
A short procurement timeline to work backwards from
| Stage | Door-related output |
|---|---|
| Concept and space planning | Opening locations, fold strategy, which rooms need partitions at all |
| Detailed design | Door schedule per room type, veneer references, hardware set |
| Sample approval | Physical leaf signed off against installed wall and joinery finishes |
| Site measurement | Confirmed dimensions after finishes, tolerances recorded |
| Production and quality control | Manufacture of made-to-measure sets, packing per room group |
| Delivery and installation | Consolidated shipment, fitting, snagging, handover documentation |
Run the sample approval and site measurement steps in the right order and the door package stops being a risk item. Reverse them and every opening becomes a site adjustment.