Vanity lighting is one of the few bathroom specifications that people judge every single day, at close range, usually in front of a mirror. Yet it is often the last line item on a fit-out schedule, decided after the basin, countertop and cabinetry are locked. That sequence causes most of the complaints: shadows across the face, a fitting that no longer lines up with the mirror, or a fixture that cannot be wired where the plan says it should be.

If you are sourcing for a villa, an apartment handover or a hotel guest-room floor, the specification conversation is worth having properly before anything is ordered. Below are the questions we would put to a buyer or specifier first, and what each answer actually changes on site.

1. What is happening at the mirror, not just on the ceiling?

Overhead lighting alone pushes shadows into the eye sockets and under the cheekbones, which is exactly what nobody wants at a shaving or make-up station. Ask first where the mirror will sit and how much clear wall sits either side of it. That determines whether the scheme needs vanity lighting placed laterally at face height, a fitting mounted above the glass, or both working together.

For guest bathrooms and powder rooms the wall width is often narrow, so a single decorative piece may carry the whole look. In that case it is worth reviewing bathroom wall sconces as a pair or as a repeated module along a longer mirror run, and deciding early whether the fittings are decorative accents or the primary task light.

2. Who is doing the electrical work, and what do they need from us?

This question sounds procedural, but it drives cost. Back boxes, switched versus looped feeds, low-voltage drivers for integrated strips, and where a driver can be reached for service all have to be resolved before the wall is closed. Ask your electrician what information they need from the lighting schedule: mounting height, centre lines, cable provision and whether any fitting must connect to a shared dimmer.

Where the design calls for light built into joinery — niches, cabinet interiors, a lit mirror front — the electrical coordination belongs with the cabinetry package rather than the lighting package. Our integrated cabinet lighting is specified alongside the furniture so the wiring route and driver position are drawn into the workshop drawings, not improvised on site.

3. Which bathroom zone is the fitting in, and what protection does that require?

A fitting beside a basin in a family bathroom faces splashing; a fitting near a walk-in shower or a wet area faces something much harsher. Enclosure protection and electrical suitability are set by the local code and by where the fixture lands relative to water sources, so ask your specifier or electrician to confirm the requirement for each position rather than assuming one rating covers the whole room.

We do not publish a single blanket rating across our bathroom range, because the fittings are made per project. Confirm dimensions, materials, electrical specification and installation requirements with us against the actual drawings for your configuration — this is the question that prevents returns after delivery.

4. Does the fitting have to match a vanity that is already being built?

When vanities are made to measure, the lighting almost never comes from a catalogue in a standard width. A double vanity spanning two basins usually needs either two symmetrical fittings or one continuous fitting sized to the mirror; a floating vanity changes the wall build behind it and therefore what that wall can carry.

Ask us to size the fitting to your drawing. Our bathroom lighting is specified with made-to-measure dimensions, selectable materials and finishes, and a layout tailored to the room, so the same finish as the cabinet fronts, mirror frame or ironmongery can be carried through the metalwork.

5. Is this a task light, a feature piece, or both?

Some projects only need clean, even light at the mirror. Others want the fitting to read as a design statement — a decorative LED sconce with a mirrored centre and a sculptural transparent frame can anchor a hotel guest-room vanity or a principal ensuite without needing additional decoration around it.

Decide this before shortlisting, because a feature piece and a task fitting are specified differently. A statement fitting still has to deliver usable light at the mirror; a purely functional fitting should not be judged on its silhouette. Where both roles matter, we design them as one piece.

6. What is being ordered with it, and by whom?

Vanity lighting rarely arrives alone in a project package. Mirror cabinets, basins, showers, tapware, wall finishes and joinery all touch the same small area of wall. Splitting those across several suppliers means every handover point becomes a risk: the cabinet supplier drills for a fitting they have never seen, the electrician wires to a drawing that has not been updated.

Ordering these elements together removes most of that friction. Our LED mirror cabinet range, for example, is built to the same opening and finish as the surrounding cabinetry, with the lighting specification settled in one drawing set rather than reconciled between two vendors.

7. How will it get here, and who installs it?

Ask about packing, container loading, freight mode and delivery address, and about what happens when a fitting arrives on site. Bathroom lighting is small, breakable and easy to lose among larger joinery crates, so confirm how fittings are packed and labelled against the room schedule.

Then ask who commissions and fixes the fitting. Our scope covers design consultation, manufacturing, logistics and door-to-door delivery, with installation support and after-sales service on project work — so agree that responsibility in writing before the fitting ships, not after it lands.

8. What does the sample actually prove?

Before a full order, ask for what you can check physically: the finish under your own wall colour and daylight, the mounting depth against your mirror and substrate, the weight and how it is supported, and the shape of the light it throws on a face at 500 mm. Finish photographs are unreliable for warm metals and smoked glass.

A sample also surfaces the practical detail nobody plans for — whether the fitting sits proud of a tiled surface, or clashes with a mirror cabinet door when it opens.

A short checklist before you raise the purchase order

  • Mirror position and clear wall width confirmed on the latest drawing.
  • Mounting height and centre lines agreed with the electrician, with feeds shown.
  • Wet-zone requirement for each position confirmed by the local specifier or electrician.
  • Vanity, mirror cabinet and lighting taken from one coordinated set of dimensions and finishes.
  • Driver position and service access marked on the wall build.
  • Packing, labelling per room, delivery address and installation responsibility agreed in writing.

Send us your bathroom layout, mirror size and finish direction, and we will come back with a lighting specification that fits the joinery package rather than fighting it — from made-to-measure fittings through production, freight and delivery to site.