A wall-hung basin looks simple on a schedule: one line item, one photo, one price. The claims that follow it are rarely simple. Fixing method, waste route, glaze performance and the point at which the drainage connection becomes somebody else's responsibility all sit behind that single line. When we prepare sanitary ware for villa and hotel projects, we ask procurement teams to record those details against each model before an order is placed, because they decide what the site team installs and what the client eventually maintains.

This article uses our Wall Hung Ceramic Basin 1003B, Modern Wall Mount Bathroom Sink as the worked example. The same documentation checklist applies to any wall-hung basin on your bill of quantities, and we note at the end which figures for this model still need confirming from the current technical sheet rather than being copied across from catalogue copy.

1. What the product actually is

Model 1003B is a wall-hung vitreous ceramic basin with a tapered, curved profile and a high-gloss glaze. It carries no cabinet and no pedestal: the bowl is fixed to the wall through its back panel, so the floor beneath stays clear. That construction drives three practical consequences worth writing into the specification rather than assuming.

  • Support comes from the wall, not the floor. The back-panel fixing and the wall structure behind it carry the load, so the substrate and fixing detail belong in the drawing set before the basin arrives on site.
  • Cleaning is a surface question. The dense glaze is what resists staining, limescale marks and yellowing in daily use; the documented finish should match what is supplied, not just what appears in the catalogue photograph.
  • Faucet mounting needs confirming per installation. The basin has a tap mounting area for a single faucet. Whether that means a deck-mounted mixer, a wall spout with separate stops, or a counter-mounted pair depends on the vanity or wall build-up shown in your drawings.

2. The record we ask procurement to keep for each basin

The table below is the field list we fill in when a sanitary line item moves from concept to purchase order. Left column: what to capture. Right column: what we can state for 1003B today, and where a value has to come from the confirmed technical sheet.

FieldStatus for Wall Hung Ceramic Basin 1003B
Model and catalogue name1003B, listed as Wall Hung Ceramic Basin 1003B, Modern Wall Mount Bathroom Sink. Use the catalogue wording exactly in the purchase order so the line matches the packing list.
Body material and finishVitreous ceramic with a glossy glaze finish.
Fixing methodWall-mounted, fixed by the basin back panel. No cabinet or pedestal required.
Overall dimensionsTo be taken from the current technical sheet for this model before the order is raised. Other basins in our range are dimensioned on their own pages, so a figure quoted for one model cannot be transferred to 1003B.
Waste route and drainage set-outTo be agreed with the plumbing contractor per project. The set-out has to match the waste route shown on your plumbing drawings; we do not assume a drainage arrangement from the basin alone.
Faucet provisionTap mounting area for single faucet installation. Tap holes, spout reach and stop-valve position need agreeing with the tap selected for the project.
Matching suite itemsDesigned to be paired with a toilet and bidet of the same series so that shapes and glaze read as one set across the room.
Typical applications on our projectsHouses, villas, hotels and commercial washroom renovation, where a clear floor line and a compact footprint matter.
Certification markingTo be verified against current documentation for the exact production batch. Do not carry a certification claim from another model's page onto this line item.

3. The interface details that cause the most rework

Almost every avoidable cost on a wall-hung basin sits at an interface, not in the ceramic itself. Three come up repeatedly.

  • Framing and fixing points. A back-panel fixing needs solid blocking or a suitable carrier behind the finished wall face. If the basin is specified after the stud work is closed up, the wall has to be opened again. Record the finished rim height and the fixing centres on the setting-out drawing.
  • Waste route decided before the wall closes. The waste connection for a wall-hung basin is normally concealed, so its position is fixed once the wall is lined and closed. Confirm the set-out with the plumbing contractor while the wall is still open, and record the agreed dimension in the same document that carries the basin schedule.
  • Tapware coordination. Basin height, spout reach and the position of stops have to agree with each other. A tall spout over a shallow bowl throws water outside the basin; stops set too close to the wall cannot be reached once the basin is hung. Agree the tapware model at the same time as the basin, not later.

4. Documentation that protects you after order

Once the line item is on a purchase order, these records are what let a project manager resolve a query without going back to square one:

  • The exact catalogue name and URL for each model, so substitutions are visible rather than silent.
  • A confirmed dimensioned drawing for the specific model, initialled by whoever signs off the bathroom layout.
  • The agreed waste route, set-out dimension and carrier or blocking detail, marked on the setting-out drawing.
  • The tapware selection with spout reach and stop-valve positions.
  • Pack list, carton marks and container loading plan, matched to the room-by-room basin schedule so installation follows a sequence instead of a scramble.
  • Inspection notes at handover: fixing security, glaze condition after transit, sealant lines and drainage test results.

For multi-room sets, specify the whole Bathroom Sanitary Fixtures group together — basins, water closets, bidets, shower sets and vanities — so glaze colour, profile radius and hardware finish stay consistent across floors. When the same supplier handles ceramics, joinery, lighting and finishes under one One-stop Furniture and Building Materials Supplier arrangement, one coordination file covers all of it, which is where most of the schedule saving actually comes from.

5. Where 1003B fits in a fitted-out project

On villa and hotel work we see this type of basin chosen for guest washrooms, second bathrooms and en-suites where the floor line needs to stay clear for cleaning and the room is too tight for a full vanity. Because it pairs with a matching toilet and bidet from the same series, one shape language can run through several rooms at different budgets. Where a project calls for a freestanding or counter-mounted arrangement instead, we specify that model separately and document its own interfaces — the checklist above does not transfer automatically between mounting types.

Our Hotel Furniture and Interior Fit-out Supplier service covers sanitary ware alongside cabinetry, flooring, wall and ceiling finishes, lighting and loose furniture for villa, hospitality and office projects. For enquiries about a specific model, the details to reach us are listed on our Contact page; technical sheets, fixing details and drainage requirements are confirmed per project before production. Freight by sea, air or rail with door-to-door delivery is arranged through our Furniture Logistics and Door-to-door Delivery service, and site fixing, snagging and after-sales support are handled under Furniture Installation and After-sales Support.

Before you place the order, confirm in writing:

  • The current technical sheet for model 1003B, including overall dimensions and fixing centres.
  • The waste route and set-out dimension agreed with your plumbing contractor.
  • Blocking or carrier detail behind the finished wall face, with load capacity confirmed by your structural engineer.
  • Tapware model, spout reach and stop-valve positions.
  • Applicable certification and testing documentation for the production batch you are buying.

Figures marked "to be confirmed" above are deliberately left open: dimensions, drainage set-out and certification markings for this model must come from the current technical sheet issued with your order rather than from catalogue copy. Dimensions and drainage arrangements published for other basins and water closets in our range belong to those products only.