A double vanity looks like a single line item on a bathroom schedule, but it pulls together joinery, stone, ceramics, tapware, drainage and lighting at once. That is exactly where procurement risk concentrates. Before a purchase order for a Santerson Double Vanity leaves your desk, the review below walks through the decisions that most often turn into variations, re-orders and programme delays on residential and hospitality bathroom packages.
1. Specification drift: when the item you approve is not the item you receive
The double vanity in the Santerson Vanities collection is a configurable product: dimensions, material and finish are specified per project rather than chosen from a fixed size list. The same applies to the floating vanity and the integrated countertop vanity. Configurable is good for fit; it is dangerous when the approval trail is thin.
Before ordering, fix four things in one signed document: overall width, height and projection; carcass material and door construction; finish code and sample reference; and the basin or countertop pairing. A verbal "same as the previous bathroom" instruction has no legal or production meaning. Ask for a shop drawing with dimensions marked on it, and confirm that the version you signed is the version stamped on the packing list.
2. Vanity and countertop treated as separate purchases
The most expensive mistake in this category is buying the cabinet from one supplier and the top from another, then discovering that basin cut-outs, tap holes, overflow positions and edge details do not agree. Where the top and cabinet are ordered together — for example a double basin countertop matched to the vanity below it — cut-out setting out, tap-hole centres and the fall to the waste are resolved in one drawing.
Where they are split, you own the interface. Write down who is responsible for the cut-out dimension sheet, who confirms the basin brand and model, and who signs off the tap-hole layout. Make that responsibility explicit in both purchase orders, not in a shared spreadsheet that neither supplier was asked to read.
3. Interface data: drainage, waste positions and wall conditions
Vanity dimensions drive plumbing rough-in, and rough-in is only cheap before the slab or the stud wall closes. Confirm trap orientation and offset, waste outlet height, isolation-valve position, and whether the design calls for a floor-standing or wall-hung arrangement. If the same bathroom also specifies wall-hung toilet frames or a wall-hung ceramic basin, the wall build-up, carrier frame depth and finished tile line must all resolve to one dimension. A 20 mm difference in the finished face of the wall is enough to make a basin tailpiece miss its connection.
Get the interface drawing from the manufacturer before your mechanical services are issued for construction, not after. Reconcile it against your own set with both drawings open side by side.
4. Lighting and electrical coordination
A double vanity usually carries a mirror, and the mirror usually carries lighting. Vanity lighting is likewise specified per project, so its fitting position has to be set against the mirror size and the finished wall face. Where an illuminated cabinet or a backlit mirror is in play, confirm which party supplies the transformer, where it sits, and how it will be accessed for service — behind a drawer front is a poor answer.
Also settle IP rating for fittings within the shower-splash zone, cable exit points, and switch location. These are cheap decisions at drawing stage and costly ones on site.
5. Finish samples in writing, not on screen
Wood-grain laminates, lacquers and veneers photograph well and can read differently under warm bathroom lighting. Approve a physical sample of the exact finish, batch reference and grain direction, and keep that sample until handover — it is your only objective reference when a replacement panel or matching wardrobe arrives months later. Record whether doors are handed left and right, and whether grain runs vertically or horizontally across the elevation.
6. Lead time, batching and the shipping interface
Made-to-measure joinery is produced to order, so a change after release restarts the clock. Order once the bathroom layout is frozen rather than at contract award, and hold changes behind a formal variation process. Where vanities travel with other fixtures — cabinetry, shower systems, ceramics, lighting — batching them into coordinated consignments reduces the number of deliveries to coordinate and the risk of one item arriving while its wall is still open.
Santerson's logistics and door-to-door delivery service covers freight forwarding, customs paperwork and container loading. Treat the commercial terms as project-specific: agree Incoterms, who pays duty and GST, insurance cover, and the delivery address down to the loading bay and lift booking. Do not assume an arrival date until you have a shipping document.
7. Site readiness and installation sequence
Custom vanities arrive into a bathroom that must already be ready for them: waterproof membrane complete and tested, tiling finished on the fixing wall, waste and supply lines pressure-tested, floor level confirmed, and clear access from the lift to the room. Schedule delivery after those trades have signed off, not before, and protect the unit on site — joinery damaged by paint crews and plasterers is a claim nobody wins.
The installation and after-sales support service lists on-site installation, snag inspection, warranty coverage and spare parts. Read the scope before it is needed: what is included, what counts as a snag, how replacements are ordered, and what evidence you must retain for a claim.
8. Documentation to hold before release
- Signed shop drawing with all dimensions, handed door schedule and finish codes
- Approved physical finish sample, retained through handover
- Countertop and basin setting-out drawing, including tap holes and waste positions
- Interface drawing reconciled with your plumbing and electrical sets
- Written Incoterms, duty responsibility and delivery address for each consignment
- Inspection checklist and photo record at goods-in, before the boxes leave the loading area
Inspect on arrival while the shipment is still accessible. Photograph packaging condition, count cartons against the packing list, and open a snag sheet for any damage the same day. Claims filed after installation are almost always refused.
9. Confirming specifications rather than assuming them
Because these vanities are configured per project, dimensions, countertop fit, materials, hardware and installation requirements for the final specification should be confirmed directly with the manufacturer for each order. Santerson's custom and OEM service covers bespoke sizing, finishes and layouts, which means the answers you need exist — they simply have to be requested in writing against your project reference.
Send your drawing, ask for a marked-up return, and compare the two. Every procurement risk in this category reduces to the same cause: an assumption that was never converted into a document.
The short version
Ordering a double vanity goes wrong when configuration, interfaces and logistics are decided by different people who never sat over the same drawing. Freeze the specification, resolve the countertop and basin as one package, reconcile rough-in dimensions before the walls close, approve finishes from physical samples, agree shipping terms explicitly, and deliver only into a ready bathroom. Teams that do this in sequence rarely pay for a second set.
To confirm dimensions, finish options and configuration for a specific project, contact SANTERSON through the contact page.