A matte lacquer wardrobe looks simple on a rendering: one flat, low-sheen panel from floor to ceiling. That apparent simplicity is exactly where projects go wrong. Because there is no grain pattern and no gloss to hide inconsistencies, every millimetre of the front face carries the finish. If your enquiry only says "matte lacquer wardrobes, 3 metres wide", the manufacturer has no choice but to guess — and you will find out about it at handover.

The brief below is the information we need to quote a wardrobe that matches the drawing. It applies whether you are fitting out a single apartment or a villa development, and it follows how our matte lacquer wardrobes are actually built: made-to-measure sizing, selectable materials and finishes, and a layout tailored to the project.

1. The opening that matters: what the wardrobe has to do

Start with the room, not the product. A wardrobe for a family villa, a guest suite in a serviced apartment and a bedroom in a hotel project all need different decisions about internal layout, edge durability and how often doors will be opened each day.

Tell us:

  • Room and building type — villa, apartment, hotel guest room, maid's room, basement storage.
  • Who uses it and how often — a walk-in used daily behaves differently from a spare-room built-in.
  • How long the fit-out must last before refurbishment — this drives board selection and edge treatment rather than colour.
  • Whether the joinery is part of a wider package — matching matte lacquer cabinets in the kitchen or matte lacquer panels on a bedroom wall means one finish specification has to cover several items.

This paragraph alone removes most of the assumptions that slow a quotation down.

2. Dimensions: send the wall, not just the wardrobe size

A nominal width is not enough for built-in joinery. Send the constraints around the opening:

  • Width, height and depth at three points each — floor to ceiling heights in particular vary across a wall, and a flat panel cannot follow that variation.
  • Skirting, cornices and architraves — state whether they are being removed or whether the carcass has to scribe around them.
  • Obstructions — switch plates, air-conditioning outlets, downlights in the ceiling above, doors that swing into the frontage.
  • Floor finish build-up — say whether the measurement is taken before or after the final floor level, and what that level will be.
  • Ceiling type — a suspended ceiling, a bulkhead or a raked ceiling changes both the top detail and how the unit is fixed.

If you have architectural drawings, send them; if you do not, a set of photographs with a tape measure in frame and a dimensioned sketch is enough. We work to made-to-measure sizing, so the goal is a complete record of the opening rather than a rounded number.

3. Finish: describe the surface you want, then confirm it physically

"Matte" covers a wide range of surfaces, and words travel badly between countries. Specify what you mean in practical terms:

  • Colour reference — a paint code, an existing sample you can post, or a photograph of a project you like (with the understanding that a photograph is a starting point, not a specification).
  • Sheen expectation — soft, low-reflection surface versus a chalky, near-zero-sheen one. These are different finishes.
  • Direction of any texture — some matte surfaces read differently depending on how light falls across the panel.
  • Tolerance for variation — state whether panels in the same run must match each other exactly, and whether items in adjacent rooms need to match too.

Then close the loop before production. Materials and finishes are selectable options on these wardrobes, so ask for a physical sample of the exact finish you intend to order, view it in the room where the wardrobe will stand, and sign it off. A signed sample is worth more than any written description when a delivery is questioned months later.

4. Layout: design around what you actually store

Interior layout is where the wardrobe earns its keep. Rather than asking for a standard mix, list what has to fit:

  • Hanging — long garments, shirts, suits, everyday clothes. Two hanging heights are usually better than one.
  • Drawers — how many, and whether they hold socks and underwear, folded knitwear or heavy items.
  • Shelves — for boxes, bags or linens; note whether any shelf needs to take weight.
  • Open display niches — some clients want a lit recess for fragrance and accessories rather than everything behind doors.
  • Integrated extras — internal lighting, mirror panels, a glass section, a full-height drawer bank, or an ironing/broom bay.

Where the wardrobe is part of a broader fit-out, tell us whether you also want island walk-in wardrobes or a custom minimalist bedroom wardrobe in the same scheme, so drawer heights and panel modules line up across the room instead of being designed twice.

5. Doors and hardware: the part people forget to specify

The door system decides how much floor space the wardrobe consumes and how the front reads.

  • Hinged or sliding — sliding saves the swing clearance; hinged gives full access to the opening. State which the room allows.
  • Handleless or handled — a handleless matte front reads as one uninterrupted surface, but needs clearance for fingers and a detail at the top and bottom edges.
  • Glass against solid — if you want any glazed section, say whether it is clear, frosted or smoked, and what should be visible behind it.
  • Hardware expectations — soft-close doors, drawer runners, integrated lighting. Name the brand only if one is genuinely required.
  • Panel alignment — reveal widths between doors and whether panels run floor to ceiling without a top scribe.

Our matte sliding door wardrobes and hinged alternatives sit in the same finish family, so a project can use one colour across different door systems in different rooms.

6. Scope, quantities and dates

Procurement detail belongs in the first enquiry, not the third exchange:

  • Quantity per type — how many identical rooms, and where dimensions differ.
  • Programme — site completion date, when joinery must arrive, and any trade sequence that constrains it.
  • Delivery address and terms — a single villa site or several units; whether the goods go to the site or to a warehouse.
  • Who installs — your own joiner, or do you need installation support? Tell us at the outset, because packing and labelling differ when a third party fits the units.
  • Approval route — who signs off samples and drawings on your side, and how long that usually takes.

For multi-unit work, flag early whether one prototype wardrobe should be produced for sign-off before the rest are made. It is far cheaper to change a finish on one unit than on thirty.

7. What a good brief looks like in practice

Compare these two enquiries for the same job:

Weak brief "We need matte lacquer wardrobes for a villa, about 3m wide, grey. Please quote."
Usable brief "Two bedrooms plus one dressing room, part of a villa renovation; floor finish not yet laid, so heights are measured to the structural slab. Bedroom A: 2,940mm wide, 2,610mm at three measured points, 600mm deep, sliding doors, handleless, panels to ceiling. Dressing room: L-shaped run with two hanging zones at different heights, six drawers, lit open niche. Colour reference sample posted to your factory office; please confirm the exact finish on a signed sample before production and match it to the kitchen cabinetry in the same scheme. Site completion targeted for Q3; joinery required before floor covering is laid in the wardrobing rooms."

The second enquiry costs you an hour of preparation and saves weeks of clarification.

8. What we do with your brief

Once the information is in, the sequence is straightforward: design consultation and space planning, material selection and product specification, then production with quality control, project management and site coordination, and installation and handover. Under our custom & OEM service, that includes custom furniture design and prototyping, bespoke finishes and textures, and flexible minimum order quantities for multi-unit projects. Our interior design services cover layout planning, 3D visual renderings and drawing coordination, so a scheme can be reviewed before anything is cut.

If your project needs wardrobes coordinated with cabinetry, wall panelling, doors and other built-in joinery, send the drawings and dimensioned openings as described above and we will return a specification you can check item by item — dimensions, finish sample, layout and hardware all confirmed in writing before production starts.

Send your brief to our project team with the room list and measured openings, and we will come back with a wardrobe specification rather than a generic quotation.