A bespoke oak wardrobe is one of the few items in a villa or apartment fit-out that every party on the project signs off on more than once: the interior designer for the elevation, the client for the timber tone and door style, the builder for the opening and floor level, and the procurement lead for the price. Approvals only slow a joinery package down when each of those people is asked for the same decision at a different time, in a different document, with a different drawing set. The fix is not more sign-offs — it is fewer, better-sequenced ones.
This guide sets out how to plan stakeholder approvals around Oak Solid Wood Wardrobes and the wider solid wood wardrobe range, using the workflow SANTERSON already runs on villa and residential projects: brief, quotation and detail confirmation, then production, shipment and follow-up.
Who Actually Has to Sign
Before scheduling anything, name the people whose approval carries weight. On wardrobe packages it is usually four roles, sometimes held by three individuals:
- Interior designer or design lead — owns door profile, panel detail, timber species and finish, internal layout, and how the joinery reads against flooring, wall panelling and doors.
- Client or end owner — approves the visible outcome: colour in their own light, handle choice, what sits behind each door.
- Builder or site contractor — confirms the physical conditions: finished floor levels, wall straightness, ceiling height, where services run, and what has to be complete before the joinery arrives.
- Procurement or project manager — owns the budget line, the variation log, delivery sequencing, and who pays for a change after production starts.
Write these four names down with one line each on what they decide. If two people own the same decision, resolve that before drawings go out — that overlap is where most rework comes from.
Sequence the Approvals to the Manufacturing Stages
Solid timber joinery has a small number of genuine points of no return. Design approvals around appearance are cheap to change early and expensive after panels are machined. A practical sequence maps one approval to each stage:
| Stage | What is approved here | Who signs |
|---|---|---|
| Brief and space planning | Room-by-room scope, which wardrobes are in the package, made-to-measure openings confirmed on site | Project manager, builder, designer |
| Concept and specification | Species and finish family, door type (hinged, sliding, paneled), internal layout split of hanging, shelves and drawers | Designer and client together |
| Quotation and detail confirmation | Final dimensions, selected specifications, hardware, inclusions and exclusions, delivery terms | Client and procurement, with designer's counter-signature on the drawings |
| Production release | Signed drawing set only. Nothing else changes after this point without a priced variation | Procurement lead |
| Pre-shipment and handover | Packing list, site readiness confirmation, then installation inspection and snag list | Builder and project manager |
Give Each Stakeholder the Right Evidence
Approvals stall when people are asked to judge from information that does not answer their actual question. Match the evidence to the role:
- For the client, timber samples in a large enough format to judge grain, plus a finish sample viewed under the bedroom's own lighting rather than showroom light. Oak reads warmer or cooler depending on what is around it, and a small card will not tell them that.
- For the designer, elevations with door construction detail — panel profile, edge detail, how the carcass meets the ceiling and skirting — and a full internal layout for each unit.
- For the builder, setting-out dimensions referenced to finished floor levels and wall faces, plus a written note on site conditions required before delivery. A list of tolerances agreed in advance prevents a site surprise becoming a claim later.
- For procurement, a quotation that states what is included, what is excluded, and the cut-off date after which changes attract a variation cost.
SANTERSON's design service covers space layout planning, concept work with mood boards, furniture layouts and 3D renderings, and coordination of drawings through to production — which means the designer-facing evidence above can be produced as part of the package rather than separately by a local consultant.
Confirm the Specification Before Production Release
Wardrobe products in this range are made to measure, with material and finish options and a layout tailored to each project. That flexibility is the reason approvals matter: nothing on the drawing is standard, so every line has to be confirmed deliberately rather than assumed.
Before release, check these items are settled in writing:
- Species and finish for doors, carcass, and any visible interior surfaces — these are not always the same, and the difference should be shown on the drawing.
- Door type and opening direction against the room's circulation, checked with the builder at final dimensions, not at first fix.
- Internal configuration per unit: hanging heights for long garments, drawer bank position, shelf spans, lighting or no lighting.
- How the wardrobe relates to adjacent finishes — engineered oak flooring, wall panelling, skirting, and any nearby door opening.
- Who signs off on-site dimensional verification, and when it happens relative to floor and ceiling completion.
Where a project wants the oak look with different panel detailing rather than a plain front, Classic Paneled Solid Wood Wardrobes sits in the same collection and can be specified on the same drawing set. Adjacent joinery — a custom bedroom wardrobe, media wall or tall cabinet in the same bedroom — should go through the same approval round, so timber tone and finish are signed once for the whole room instead of once per item.
Run One Approval Round Per Room, Not Per Item
The single most effective scheduling change is to bundle approvals by room. A bedroom package — wardrobe, bedside joinery, any dresser or tall unit, and the flooring and panelling it sits against — gets one design review, one sample box, one client meeting, and one signed drawing set. That produces three benefits:
- Tone and finish conflicts between joinery and finishes surface in one meeting instead of appearing as snags at handover.
- The client makes decisions while engaged, rather than being asked for a drawer layout in month six.
- Production can be released room by room, so an unresolved detail in one bedroom does not hold up the rest of the order.
Set a fixed review date per room and state plainly what happens if it slips: production release moves, and with it the delivery window. That is far more productive than chasing approvals informally.
Handle Changes Without Blowing Up the Programme
Changes will happen. A disciplined process does not prevent them; it prices and times them:
- Log every change request with the drawing number affected, who requested it, and the date.
- Split requests into pre-release and post-release. Pre-release changes are usually absorbed; post-release changes need a written variation with cost and schedule impact before work proceeds.
- Never let a change reach the workshop verbally. The person who releases production should be the only one authorised to issue a revised drawing set.
- Keep a single decision log shared with all four roles, so nobody approves against an out-of-date revision.
For projects where SANTERSON handles production through to installation and after-sales, the snag list at handover is the final approval step. Book it while the trade is still on site — inspecting doors, alignment and hardware in one visit is quicker than three call-backs.
A Short Checklist
- Four named approvers, each owning one decision set.
- Approvals mapped to brief, concept, quotation and detail confirmation, production release, and handover.
- Samples and drawings matched to what each role actually needs to judge.
- Made-to-measure dimensions, finish, door type and internal layout confirmed in writing before release.
- One approval round per room; changes logged, dated and priced after release.
If your project needs a wardrobe package specified and coordinated around this kind of approval schedule — drawings, material selection, production, door-to-door delivery and installation support from one supplier — send the room list and current drawings to SANTERSON and we will come back with a specification and quotation structured around your sign-off dates.