A glass-front wardrobe is easy to admire in a rendering and surprisingly easy to get wrong on site. The panels read beautifully, but the doors only work if the carcass behind them sits square, clears the skirting and ceiling line, and leaves room for the hardware you have chosen. That is why we ask project teams for a specific set of inputs before we quote Glass Modular Wardrobes: the numbers decide whether the run is built as one piece or split into modules, and whether the glazing you pictured can actually be hung where you want it.
Our Glass Modular Wardrobes belong to the Modular Wardrobes collection for residential projects. The sizing is made to measure, the materials and finishes are selected per project, and the internal layout is drawn around the room rather than taken from a fixed catalogue width. Below is the information we work from, and what each item changes in the design.
Start with the shell: the four dimensions that frame everything
Send us the width, height and depth of the alcove or wall run, and say clearly whether those are finished-surface measurements. A dimension taken off a structural drawing before plasterboard and flooring go in is not the same number as one taken on site after them, and the difference lands directly on your wardrobe.
- Width along the wall. Note the run from end to end, plus any return into a corner. Record both the top and bottom width if the walls are not parallel; older villas and renovated apartments rarely are.
- Height at several points. Floor to ceiling at the left, middle and right of the run. A variation of even a few centimetres tells us whether the unit needs a scribe, an out-of-square cut, or a soffit box to make the top line read straight.
- Depth at the front and back. Wall runs bow. We need the shallowest point as well as the nominal depth, because carcass depth is set by the tightest spot, not the widest.
- Floor and ceiling finish build-up. Tell us what is going on the floor and ceiling — tile with adhesive, engineered oak over a battened subfloor, a plasterboard bulkhead, cornice. We work to the finished level you show on the drawings and confirm it again before production.
Obstructions and services: what usually turns a clean drawing into a variation
Most wardrobe variations trace back to something nobody measured. Mark these on a simple sketch with dimensions from the nearest wall corner, not from the middle of the run.
- Skirting and architrave — height and thickness, and whether they will be removed or cut around.
- Light switches, sockets, thermostat panels and data points that fall inside the wardrobe footprint, and where you would like them relocated.
- Recessed downlights and any ceiling bulkhead, including the depth available above the unit.
- Radiators, pipework, air-conditioning grilles, curtain boxes and window reveals that project into the run.
- Door openings and room doors — the swing arc decides whether a hinged door can open fully or whether the run should stop short.
- Underfloor heating, if present. Tell us before we set the base detail.
Layout inputs: how the wardrobe is actually used
The internal split is a functional decision, not a decorative one. We ask each room's user to describe their storage in plain terms and then translate it into modules. Hanging zones need a drop height that matches what you hang — short garments, long coats and dresses, or both. Drawer banks work best at a comfortable working height rather than at the bottom of the unit. Shelving spans are limited by the panel material, so a wide open bay for bags or folded knitwear needs either a support or a narrower span.
It also helps to say what should be hidden and what should stay on display. Glass frontage is part of that conversation: clear glass shows contents, frosted glass obscures them while still letting light through, and smoked or bronze-tinted glass reads as a darker surface. If you want lighting inside the carcass, tell us at the layout stage — cable routes and transformer positions are far easier to plan before the panels are cut than afterwards.
Glass and frame choices to confirm before we quote
For glass-fronted wardrobes we settle four things early, because each one affects both the drawing and the price:
| Decision | What to send us | Why it matters |
| Glass type and tint | Clear, frosted, smoked or bronze; plain, ribbed or patterned | Sets how much of the interior is visible and how the frontage reflects light in that room |
| Front frame | Frame profile, colour or finish, and whether handles are exposed or integrated | Determines the sight lines between doors and how the unit sits with other metalwork in the room |
| Door operation | Hinged, sliding or open frontage, plus the clearance available in front of the run | Sliding fronts need a track zone; hinged doors need swing room. The room decides before the finish does |
| Panel division | Number of doors across the run and the width you want each one to read as | Door count follows the module split, so it must agree with the internal layout |
If you are comparing frontage options, our Frosted Glass Aluminum Frame Wardrobes and Glass Sliding Door Wardrobes pages show how tinted and framed glass reads in different rooms, which is often the fastest way for a client to choose.
How we split a long run into modules
A wardrobe longer than the room's widest opening rarely travels as one piece. We divide the run into modules so each section passes through the door, the lift and the stairwell, and so the joints land where they can be scribed and covered rather than in the middle of a visible frontage. For that we need the access route recorded: doorway widths and heights on the route from the street to the room, lift car dimensions, stair turns if there is no lift, and the delivery level.
Module count also affects the appearance. Every module boundary shows up somewhere in the door grid, so a run that is split into three sections will not read as four equal doors. We propose the split with the elevation in front of you before anything goes into production.
Documents and finishes to send with your enquiry
- A room layout or marked-up plan showing the wardrobe wall, plus elevations of that wall with dimensions.
- The finish schedule for the room — wall, floor and ceiling materials, and any joinery already specified.
- Reference images if you are working toward a particular look, and the samples or codes of finishes already chosen elsewhere in the project.
- Quantities: how many rooms need wardrobes, whether they share one design, and which rooms are priority for handover.
- Your programme dates — site access date, target installation window and any earlier milestones that depend on the joinery being complete.
For whole-apartment or villa work we usually carry the same approach across the other built-in furniture in the project. Combination Modular Wardrobes and Hanging Modular Wardrobes cover layouts that lean on mixed storage or on full-height hanging, and drawing all the bedroom joinery in one pass keeps door heights, reveals and finish codes consistent from room to room. Our Custom & OEM Service covers bespoke material, finish and texture choices where a project has its own specification.
Common questions
Can you work from architectural drawings instead of site measurements?
Yes, for the first design round and budget figure. Before production we ask someone on site to verify the dimensions against the finished surfaces, because that is where tolerances are absorbed.
What if my walls are out of square?
Send us the variation you measured. We design scribes and adjustment lines into the carcass so the frontage still reads plumb and level; the more precisely the out-of-square is recorded, the neater the finished result.
Can the wardrobe match joinery already supplied by another contractor?
Send the finish codes, sample photos and the section details of the existing work. We match colour and profile as closely as the materials allow, and we say plainly where a different substrate or lacquer will read slightly differently under the room's lighting.