Before a single outdoor swim spa shell leaves the factory, there is one step that saves more money than any other: reviewing physical finish samples and signing them off in writing. For a project buyer, the sample review is where colour, texture, hardware and equipment package stop being words on a datasheet and become something you can hold, compare against your specification, and approve. This guide walks through exactly what to check for WS-PC07A-T before production starts, so the unit that arrives on site matches the one you approved.
What a finish sample package should include
WS-PC07A-T sits in our configurable outdoor swim and hydrotherapy range, which means several visible elements are chosen rather than fixed. A proper sample pack for this model covers the shell surface, the exterior cladding, the trim and hardware, and a written equipment schedule. Ask for each item separately, so a dispute later can be traced to one line on the approval sheet instead of a general description.
- Acrylic shell sample — the actual surface finish in the selected colour, large enough to judge under raking light rather than a thumbnail offcut.
- Exterior panel or cladding swatch — the finish that will be visible from the deck or terrace, with the same texture direction and sheen level.
- Trim, edge and step material — corner radius, edge profile and the anti-slip surface you intend to walk on barefoot.
- Hardware and control finish — control panel bezel, jet faces, light rings and any metal trim, checked for consistency of tone across suppliers.
- Signed equipment schedule — the confirmed list of what is included in your configuration, cross-checked against the product page before you sign.
Step 1: check the shell sample where it will actually be seen
A shell sample photographed on a white desk tells you almost nothing. View it outdoors, in the light conditions of the site, at the distance a guest or homeowner will normally stand. Acrylic shows wave, colour shift and gloss difference far more clearly under daylight and side light than under showroom lighting.
Run these checks on the physical piece:
- Colour match against your reference, viewed in shade and in direct sun.
- Gloss level and whether any orange-peel or rippling appears under raking light.
- Edge finish and radius — where the shell curves, thin areas lose pigment first.
- Resistance to a cleaning agent you actually plan to use on the water surface.
Keep the approved sample. Once production starts, it becomes your acceptance reference at delivery, and a difference that would be argued about in photographs is settled in seconds with the signed piece in hand.
Step 2: confirm the equipment package line by line
The published catalog entry for WS-PC07A-T lists a shell of 7000 × 3000 × 1470 mm, one control system, a swim training system, one water pump, one filter pump, 56 jets, four LED lights and a total power figure of 11.55 kW. Treat those numbers as the catalog baseline for this model, not as your purchase specification. Options such as UV sterilisation, additional water pumps, heat pumps, sand filtration, insulation and steps are configured per project, so the final equipment list is what must appear on your signed sheet.
Two things to nail down before production, because they affect both cost and site works:
- Included versus optional — every jet type, light, pump and control function marked as included, optional or excluded. If the swim training system or ozone function is part of your deal, it should be named.
- Electrical supply — confirm the electrical requirement for the exact configuration you have chosen with our team before your electrician finalises the sub-board, cable size and protection. Total power changes when heat pumps or extra pumps are added.
If a comparable model is being considered alongside WS-PC07A-T, compare configurations rather than model names. Jet count, pump arrangement and lighting quantity vary across the range, and two models of similar length can carry very different equipment packages and power loads.
Step 3: match finishes to the surrounding deck and landscape
A swim spa is never viewed alone. Its shell and exterior panels sit against decking, paving, wall cladding and nearby outdoor furniture, and a finish that looked neutral in isolation can clash once it is beside warm timber or a dark stone façade. Review the samples next to the finishes already selected for the project.
If the poolside is being furnished as part of the same package, place the spa samples against the pieces you have chosen from our outdoor furniture collections. Aluminium frames, teak-look tops, rope weave and wicker each reflect light differently, and the water colour of the spa will pick up the tones around it. The same exercise applies to lighting: check how the LED fittings read at night against the deck lighting scheme.
Step 4: get the approval in writing
The sample itself is only half of the control. The other half is a short written record that production and quality control both work from:
- Sample reference or photograph, with the approved finish named and dated.
- Who signed it off, and on behalf of which party.
- The confirmed equipment schedule for the chosen configuration.
- Any agreed tolerance — for example acceptable colour variation between production batches.
This sheet is what our team works to during manufacturing and what you check against on arrival. It replaces "it looked different in the brochure" with a comparison anyone can settle on site.
Where the sample review fits in a turnkey project
WS-PC07A-T is made to order, and the sample review sits inside a wider workflow that covers design consultation, material selection and product specification, manufacturing with quality control, door-to-door logistics, and installation support. Buyers who treat the finish sample as a formal project milestone — not a courtesy step — get a cleaner production run and a straightforward inspection at handover.
For projects that combine a swim spa with other fit-out items, coordinating the sample stage across products avoids duplicated shipping of swatches and keeps every finish on one approval sheet. You can review the wider range in our product catalogue, or send us the model reference and your site drawings to start the specification.
Before you approve: quick checklist
- Shell sample viewed outdoors, in shade and sunlight, not just on a desk.
- Exterior panel, trim, steps and hardware finishes approved as separate items.
- Equipment schedule confirmed item by item against the configuration you are buying.
- Electrical requirement for that configuration confirmed before site electrical works are fixed.
- Samples reviewed beside decking, cladding and poolside furniture already selected.
- Written sign-off issued, dated, signed and kept for inspection at delivery.
Approve the sample, then release production. That single sequence keeps the delivered spa identical to the one you designed — and gives you a documented reference for every finish on site.
To request finish samples or confirm an equipment configuration for WS-PC07A-T, contact SANTERSON, your one-stop furniture and building materials supplier — or send us the model reference and your site drawings to start the specification.