A wardrobe quote that looks complete can still leave the expensive decisions open. Two quotations for the same bedroom may differ by a wide margin, and the difference is usually not the door profile — it is what sits behind the line "wardrobe, as per drawing." Before you sign anything for decorative moulded paneled wardrobes, work through the items below. Each one is a question you can put to a supplier in writing, and each one changes either the price or the finished result.

1. What exactly does the quoted size refer to?

Ask whether the dimensions on the quotation are the overall external envelope of the unit or the carcass size, and whether they include skirting, cornices, scribes and any filler strips. Wardrobes in finished rooms rarely meet a perfectly straight wall, so a made-to-measure unit normally carries scribing to close the gap. If scribing is not priced, it appears later as a variation.

Good quotations state each opening separately — width, height and depth — and note where the height varies because of bulkheads or ceiling levels. Our wardrobes are built to project-specific dimensions rather than fixed modular widths, so the drawing and the quotation should reference the same set of numbers.

2. Which part of the door is moulded, and what is it finished with?

"Paneled" covers several different build-ups. A decorative moulded panel can be a routed MDF core with a painted finish, a vacuum-pressed foil or PVC membrane, an acrylic laminate, or a wood veneer pressed over a moulded substrate. The visual difference at showroom distance is small; the difference under bedroom lighting and against a hand is not.

Put these questions to the supplier in plain words:

  • Is the panel routed from one board, or assembled from a frame with a loose centre panel?
  • What is the surface finish — paint, membrane, laminate or veneer — and how many coats or passes?
  • Are edges on both faces finished to the same standard, including the top edge of the door?
  • How are the moulding radii handled — is the detail a sharp arris or a soft radius, and can a sample be supplied?

If you are comparing our raised panel wardrobes against the moulded option, ask for both samples side by side. Panel depth and shadow line read very differently once the doors are installed in a row.

3. What is the carcass made of, and how deep is it?

The doors get the attention; the carcass decides whether the wardrobe still works after five years. Check the board type and thickness for sides, base and back, whether the back panel is rebated or nailed on, and whether the carcass depth suits your hanging requirement. A shallow unit fitted with a standard rail leaves sleeves pressed against door panels.

Ask how the unit is supported — plinth, legs, or a suspended base — and whether moisture protection is specified for the base if the room sits against an external wall.

4. What hardware is quoted, and by brand?

Hardware is where quotations quietly differ. "Soft close hinges included" tells you very little. Ask for the hinge type and mounting (inserted or cup), the number of hinges per door based on door height, the slide type for drawers (side-mount, undermount, run-out), and whether the soft-close mechanism sits in the hinge or in a separate closer.

Then ask what happens when a part fails in three years: is a spare hinge of the same model available, and at what cost? A quotation that names hardware types makes this an easy question. One that does not makes it an argument.

5. What is inside the wardrobe?

Interiors are usually priced as a package, which hides how much shelf and drawer space you actually get. Check the split between hanging above shelves, long hanging for coats and dresses, drawers, and open display sections. Confirm whether adjustable shelves come with shelf pins and supports or only fixed shelving, and whether extra drawers are quoted per unit or excluded.

If your project has a mix of room types — a main bedroom, a guest room, a child's room — ask the supplier to price each layout separately rather than one repeated module. That is how we handle layouts for built-in furniture packages: the interior follows the room, not the other way round.

6. What does the price include outside the workshop?

For an overseas order this is where a low quotation becomes an expensive one. Read the Incoterms on the quotation and then check which of these are inside it:

  • Packing method and protective edging for doors and moulded panels
  • Container loading plan, or whether loading is left to the freight forwarder
  • Export documentation — commercial invoice, packing list, certificate of origin
  • Freight to port, insurance, and delivery to site or to a depot
  • Who handles customs clearance at the destination, and who pays duties

Our logistics and door-to-door delivery service covers freight forwarding, packaging and container loading, shipment tracking and documentation. Ask your own supplier which of these they arrange and which you must arrange yourself.

7. How are variations and site conditions handled?

Wardrobe orders go wrong on site more often than in the factory. Before production starts, confirm who is responsible for verifying dimensions after floor and ceiling finishes are complete, how a corrected panel is re-made and shipped, and what the cut-off is once panels have been machined.

Also check whether installation is quoted, and if not, whether drawings and assembly sequences are supplied in a form your own installer can work from. Our installation and after-sales support covers on-site fitting, inspection and snags, spare parts and maintenance — worth comparing line by line against what the other quotation offers.

8. What is written down versus what was agreed verbally?

Read the quotation for anything that says "to be confirmed," "as discussed" or "TBC." Each of those phrases is a decision deferred to a moment when you have less negotiating room. Get finish names, hardware models, panel details and interior layouts into the document before you commit.

A useful test: send the quotation back and ask for a specification sheet against each line item. A supplier who manufactures their own product answers quickly with drawings and samples. A broker forwards your question and waits.

Putting it together

Compare two quotations on the same sheet: dimensions and scribing, panel build-up and finish, carcass construction, hardware by model, interior layout, delivery scope, site responsibilities. Price differences that looked unreasonable usually become obvious once you can see what each supplier left out.

If you want a specification reviewed before you order, send us the drawings and the questions above and we will price against them. As a furniture and building materials manufacturer working on villa and hospitality projects, we quote wardrobes with the panel detail, carcass build and hardware stated rather than assumed — so the comparison is straightforward from the first draft.