A seven-metre swim spa is not something you can change after the container has been loaded. Before production starts on Outdoor Swim Spa WS-S07B, the sample stage is where shell colour, cabinet texture and hardware finish get settled — usually for a fraction of what a correction costs later. This guide covers what to request, what to check on the physical samples, and how to record the approval so the delivered unit matches what you signed off.
Why finish samples matter more on a swim spa than on most products
WS-S07B sits in our configurable outdoor swim and hydrotherapy range, with catalog dimensions of 7000 × 2200 × 1335 mm. The shell is acrylic, the cabinet cladding and steps face sun, splash and cleaning chemicals, and the jet faces, LED housings and control panel all sit in the same visual field. Once a buyer stands at the poolside, small mismatches become obvious: a grey cabinet that reads warmer than the coping stone, a pale shell that turns creamy under the underwater LEDs, or a glossy trim showing fingerprints beside a matte handrail.
Sample review is also where specification gaps get closed. The catalog lists 48 jets, three water pumps, one filter pump, LED lighting and ozone sanitisation for this model, with total power of 13.35 kW. Electrical supply, insulation package and options such as UV sterilisation, a heat pump or sand filtration are confirmed project by project rather than assumed from the catalog page, so the sample pack is the natural moment to fix them in writing.
What to request before production starts
- Shell colour and gloss board. Ask for the actual acrylic sheet in the chosen colour and gloss level, not a printed swatch. View it wet and dry, because an acrylic surface reads differently once it is underwater.
- Cabinet cladding sample. An offcut of the exterior panel finish including the edge treatment and fixing method, so you can judge how seams will read along a 7000 mm run.
- Hardware and trim set. Jet faces, LED lens colour, handrail or grab-bar finish, step tread material and any stainless or powder-coated trim, mounted together on one board so they can be compared side by side.
- Control system sample or interface photo. Confirm the display language, layout and mounting position of the control system supplied with the unit.
- Written configuration sheet. The exact option list for your order — pumps, filtration, sanitisation, insulation, steps, lighting — signed by both sides.
How to check the samples properly
Judge them in the light they will live in. Hold the shell board near the installation area, or at least under daylight plus a neutral 4000K lamp. Underwater LED lighting changes how pale shells read after dark, so view the board with a light shining through it as well as across the surface.
Test against what surrounds it. Put the cladding sample against your decking, coping or wall finish. Aluminium frames, rope weave and teak-look tops from the outdoor furniture range often frame these units on villa terraces, and the tones have to work as a group rather than one at a time.
Run a simple durability check. Wipe each sample with the cleaning agent you intend to use on site, leave it for the recommended contact time, then rinse and inspect for dulling or lifting. Flex any bendable trim piece to see whether the finish crazes at the edge.
Count and label what arrives. Write the sample reference code on the back of each board, photograph the set next to a written list, and keep one copy archived. That archive is your reference if a later batch looks different from the pack you approved.
Recording the approval
Mark every sample with three things: project name, approved status, and date. Then confirm in writing that the production configuration sheet matches the pack — model designation, catalog dimensions, pump and jet count, lighting package, sanitisation method, insulation and steps. Anything still open on that sheet gets resolved before the order enters production, not during it.
Because these swim spas are built to a confirmed configuration rather than stocked as one fixed specification, sample approval also protects you commercially: it states exactly what was agreed, which makes inspection on arrival straightforward. The same discipline applies across the furniture and building materials we supply for villa and hospitality projects, where finishes drawn on a spec sheet have to be matched physically before manufacture begins.
A short checklist before you sign off
- Shell colour reviewed wet and dry, under both daylight and LED lighting
- Cabinet cladding checked against the on-site decking or wall finish, including seam treatment along a long run
- Jets, lenses, handrails and trim assessed together as one visual set
- Cleaning-agent test completed on every exposed surface sample
- Configuration sheet confirmed: pumps, filtration, ozone or UV, insulation, steps and control system
- Electrical supply requirements agreed for the destination site
- Signed, dated and photographed sample pack archived by both parties
If you are specifying a swim spa for a villa or resort project, request the sample pack with your quotation rather than after the order is placed. Send us site photos, the surrounding finishes you need to match and how the pool will be used, and we will confirm which configuration of WS-S07B fits — including options that sit outside the standard catalog listing.
Talk to our project team about sample packs and configuration for outdoor swim spas: Contact SANTERSON.