Arch profile, opening size, glass make-up, frame finish and hardware all have to agree before a single door leaf is cut. That is exactly why buyers rarely order Santerson Arched French Doors off a stock list — and why OEM sourcing has become the normal way to put these doors into villas, boutique hotels and residential fit-outs.

In plain terms: OEM sourcing means the door is manufactured to your drawing and under your brand or project reference, rather than bought as a catalogue item. You supply (or jointly develop) the opening dimensions, the arch radius, the material and finish specification, and the hardware schedule; the factory produces, packs and ships to that agreed specification.

What OEM Actually Means for This Product

Santerson Arched French Doors sit in the Windows & Doors range. The published product page describes them as made-to-measure, with finish, layout and dimensions specified to suit each space and project, plus material and finish options. There is no fixed module list to choose from. Every opening is confirmed against the order.

That makes the OEM route a natural fit rather than a special request. The same working method covers:

  • Made-to-measure sizing — leaf widths, overall height and the arch geometry are set from site-measured openings, not from a standard module.
  • Material and finish selection — frame material, surface treatment and colour are chosen per project so the doors coordinate with joinery, wall panelling and flooring on the same job.
  • Layout configuration — number of leaves, hinge side, opening direction and any fixed sidelight or transom are defined in the drawing set.
  • Brand and packaging customisation — where a developer, builder or dealer is reselling, product marking and packing can be arranged to their requirements under the Custom & OEM service.

If a project needs a slimmer sightline instead of an arch, Santerson Modern Slim Frame French Doors are specified the same way — which is useful when one supplier handles several door types on the same building.

The OEM Path, Stage by Stage

Below is the sequence we follow on door packages, matching the workflow described on our turnkey project pages. Nothing here is automatic: each stage closes before the next one starts.

StageWhat you sendWhat comes back
1. Brief and opening scheduleDoor schedule or marked-up plans: opening widths, heights, arch rise, quantities, hinge side, interior/exterior location.A specification review that flags conflicts — clashing arch radii, openings that fight the wall build-up, quantities that split badly across containers.
2. Specification and finish confirmationPreferred frame material, colour/finish sample or reference, glass make-up, hardware style.A confirmed specification sheet per door type. Material and finish options are those the factory can actually produce for that build.
3. Drawing and prototypingComments on shop drawings; approval of a prototype or first-article door where the project requires it.Shop drawings for signature, and — if commissioned — a physical sample for sign-off before batch production.
4. Production and inspectionApproved drawings, signed order, deposit schedule as quoted.Batch production against the approved specification, with pre-shipment inspection records.
5. Packing and shippingDelivery address, Incoterms, port or site, any marking requirements.Packing list, container loading plan and freight arrangement by sea, air or rail under logistics and door-to-door delivery.
6. Installation and after-salesSite readiness date; frame-setting sequence agreed with the builder.Installation support, snag inspection and spare-parts back-up under installation and after-sales support.

Where Buyers Typically Lose Time — and How to Avoid It

Across door packages, the same handful of issues cause rework. None of them are technical difficulties; they are sequencing mistakes.

1. Ordering against drawing dimensions instead of site-measured openings

Arch heads are unforgiving. A radius taken from a design drawing, rather than from the finished opening after plaster and floor build-up, is the most common cause of a door that will not seat. Measure after wet trades are complete, or state clearly on the order which stage the dimensions refer to.

2. Treating the arch as a decorative detail rather than a structural one

The curve changes leaf geometry, glazing shapes and hardware positions. Ask for the shop drawing to show the arch radius, the leaf division and the glass outline together — if those three are drawn separately, they will not meet on site.

3. Leaving hardware to the end

Handle height, lock preparation and hinge loading depend on leaf weight and glass make-up. Fixing the hardware schedule after production has started usually means re-machining leaves. Confirm it at stage 2.

4. Splitting doors from the rest of the fit-out

Doors ordered alone arrive alone, and their finish has to be matched afterwards to cabinetry and panelling that were bought elsewhere. Sourcing them inside one one-stop furniture and building materials package keeps finishes, delivery windows and site coordination on a single document set.

5. Assuming MOQs are fixed

Minimum order quantities for custom production vary with configuration. State the real quantity you need — including spares for one or two openings — at enquiry stage and let the factory confirm what is workable, rather than guessing a number.

A Practical Specification Checklist

Send these items with your enquiry and the quotation cycle shortens considerably:

  • Opening schedule: width, height, wall thickness, arch rise/radius, quantity per type.
  • Location of each door: internal partition, terrace access, lobby, guest room — this drives the glazing and hardware discussion.
  • Frame material and finish reference (sample number, photograph or physical sample).
  • Glass make-up: single/double glazed, clear/tinted/laminated, any decorative pattern.
  • Hardware: handle style, lock type, hinge grade, closers if required.
  • Opening direction and hinge side for every leaf.
  • Delivery term (port, site or door-to-door) and the required on-site date.
  • Whether a prototype door is required before batch production.
Confirm before you order. Published product pages give a configurable overview, not a fixed technical datasheet. Dimensions, material options, glass make-up and hardware must be confirmed for each specific order in writing, and any performance, certification or code requirement for your market should be raised at specification stage — not assumed from marketing copy.

Who This Sourcing Model Suits

OEM works well when the project has a defined door schedule and someone accountable for measuring and signing drawings: villa developers, boutique hotel fit-outs, residential builders and interior practices specifying non-standard openings. It is a poor fit where openings are still moving or nobody on site can take responsibility for measurement — in that case fix the openings first, then start the OEM process.

For projects combining doors with cabinetry, wardrobes, wall panelling, flooring and lighting, the same drawing-review discipline applies across all of them. That is why we handle windows and doors as part of a wider package rather than as an isolated line item.

Send us your door schedule. Include opening dimensions, arch geometry, finish reference and the required site date, and we will come back with a specification review and a quotation for Santerson Arched French Doors — prototype first if your project needs it.
Contact: PHILLIP  |  Phone / WhatsApp: +86-13928214007  |  Email: santerson@qq.com  |  Contact page